• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Place With Biggest Need of Direct London Train?

Status
Not open for further replies.

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,877
Nobody has mentioned Huddersfield yet.

So I'll say Huddersfield.

Prioritising Harrogate over Huddersfield for service extensions beyond Leeds doesn't sit right with me. Yes, I know, paths and all that.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

465fan

On Moderation
Joined
26 Jul 2009
Messages
503
Location
Bexley
Nobody has mentioned Huddersfield yet.

So I'll say Huddersfield.

Prioritising Harrogate over Huddersfield for service extensions beyond Leeds doesn't sit right with me. Yes, I know, paths and all that.
Not just paths. The ease of running a train in from Huddersfield on the high-platform side of Leeds (e.g. 12 - 16) doesn't immediately gel with the continuance to London, and vice versa. Add to that, Huddersfield, if it had a functioning train service (*) to Leeds as was supposed to be the case, e.g. four fast trains per hour (same to Manchester, albeit not all to Piccadilly) then you would find people would be mostly alright.

(* - e.g. no TPE chaos for years with regular cancellations and overcrowded trains)

The only possible improvement that could probably be made, if you were to have a train every 30 minutes between Huddersfield and Kirkgate, would be for one an hour to keep going up via Castleford to York; and then run the other one out over Streethouse and Pontefract down the Askern route to Doncaster. It's a bit pie in the sky, but it would be massive for the likes of Pontefract, Askern (clearly at that point worthwhile being reopened) and into Donny for a wide web of connections.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
Bury St Edmunds did have a 2-hourly service to Liverpool St from 2004-2011.

Sudbury is restricted by not only the fact the junction faces North but also extra traffic across the foot crossing is not permitted hence why the ridiculous 2016 franchise commitment of through Colchester Town services was never going to happen.
I can see the problem which is that Sudbury-Colchester town takes more than 30 mins so would require 2 units, but a through service to Colchester would be viable were the foot crossing closed, though that would likely cause accessibility issues.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,129
Location
Wilmslow
Nobody has mentioned Huddersfield yet.

So I'll say Huddersfield.

Prioritising Harrogate over Huddersfield for service extensions beyond Leeds doesn't sit right with me. Yes, I know, paths and all that.
Just reverse at Wakefield Kirkgate & Wakefield Westgate to attach to a Leeds-King’s Cross service at the latter, as they used to. So much easier today with units rather than loco-hauled stock. It could even start from Halifax first!
 
Last edited:

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,307
Location
Oxford
Maybe Marks Tey will get an accessible footbridge in due course which might allow the crossing to be closed and through trains to Colchester.

== Doublepost prevention - post automatically merged: ==

Just reverse at Wakefield Kirkgate & Wakefield Westgate to attach to a Leeds-King’s Cross service at the latter, as they used to. So much easier today with units rather than loco-hauled stock.
If London is the target then go the other way and run via Manchester. Either as an extension of a Euston - Piccadilly or some new service via Victoria and Newton-le-Willows.

Or is speed is not of the essence, extend the MML service via Penistone.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,129
Location
Wilmslow
If London is the target then go the other way and run via Manchester. Either as an extension of a Euston - Piccadilly or some new service via Victoria and Newton-le-Willows.
Once electrified, they could run the unit which currently forms 1H50 07:08 Crewe-Manchester to Huddersfield instead, currently it’s an ECS working from Longsight to Crewe first. Then run into the main station at Piccadilly and reverse to go to London, as happens today with 1H50 except it’s not an advertised through working of course.
 
Last edited:

Railwaysceptic

Established Member
Joined
6 Nov 2017
Messages
1,738
If London is the target then go the other way and run via Manchester. Either as an extension of a Euston - Piccadilly or some new service via Victoria and Newton-le-Willows.

Or is speed is not of the essence, extend the MML service via Penistone.
Going via Penistone is by far the best way as it would give Barnsley its own direct service too.
 

465fan

On Moderation
Joined
26 Jul 2009
Messages
503
Location
Bexley
Once electrified, they could run the unit which currently form 1H50 07:08 Crewe-Manchester to Huddersfield instead, currently it’s an ECS working from Longsight to Crewe first. Then run into the main station at Piccadilly and reverse to go to London, as happens today with 1H50 except it’s not an advertised through working of course.
Or not that at all, when you look at the layout at Piccadilly, you'd just need to be semi-sensible using platform 3 or 4 to do the reversal, and of course, with TRU, Piccadilly to Huddersfield is electrified.

But, I still maintain that importing such performance risk to the Huddersfield route is unacceptable. Better services to Piccadilly and Leeds along the entire TransPennine route with the promise of shorter, better connections at Piccadilly or Leeds will do the business.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,874
Location
East Anglia
I can see the problem which is that Sudbury-Colchester town takes more than 30 mins so would require 2 units, but a through service to Colchester would be viable were the foot crossing closed, though that would likely cause accessibility issues.
Sunday services did it many moons ago with around a 90 minute frequency albeit with gaps. Level crossing issues were not so recognised back then however. Apart from that, constant movements onto and off the section through Chitts Hill seemed crazy performance wise.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,495
Location
Taunton or Kent
The stations on the North Downs Line must be contenders. The stations are mostly small villages but they have always had a large amount of London commuters. Currently they have to change at Dorking or Guildford or Redhill so a direct service could be very useful.
Almost certain the line not being electrified is the biggest barrier to this; partly due to limited carriage length potential, but also Victoria bans diesel in the Southern platforms (hence why Uckfield services go to London Bridge). Had the line been fully electrified, and/or in future battery operation takes off, maybe some peak Reigate terminators could be extended towards Guildford.
 

Trackman

Established Member
Joined
28 Feb 2013
Messages
4,277
Location
Lewisham
Virgin did propose extending some Manchester services in marginal time to Bolton when electrification was complete, but they lost the contract soon after. The biggest issue would the unacceptably long dwell time at Platforms 13/14 at Piccadilly loading / unloading Pendolino passengers. The about to be completed electrification to Wigan NW means you could reverse there I suppose, but that is never going to be viable.
Plus clogging up the Castlefield corridor even more. Think there is an operational issue with despatch with class 390s on Picc 13/14 as we speak.
As for Bolton, maybe there's a reason why no open access chancers have tried it. It'd be an ideal place to siphon off Manchester to London traffic by running via some convoluted and slow route. (Victoria - Denton - Stockport, for example)
That's what VT as open access proposed, isnt it?
 

billio

Member
Joined
9 Feb 2012
Messages
576
...

The only possible improvement that could probably be made, if you were to have a train every 30 minutes between Huddersfield and Kirkgate, would be for one an hour to keep going up via Castleford to York; and then run the other one out over Streethouse and Pontefract down the Askern route to Doncaster. It's a bit pie in the sky, but it would be massive for the likes of Pontefract, Askern (clearly at that point worthwhile being reopened) and into Donny for a wide web of connections.
Looking at the Northern site, the marginally quicker way to London from Huddersfield seems to be via Wakefield Kirkgate and Westgate (2 changes) and at times this is significantly cheaper than other routes.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,354
Location
Yorkshire
Going via Penistone is by far the best way as it would give Barnsley its own direct service too.
Just the small matter of paths over the single line sections and the weak viaduct just after Springwood Junction (10mph PSR for anything that would be likely to form your London service).
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,307
Location
Oxford
Just the small matter of paths over the single line sections and the weak viaduct just after Springwood Junction (10mph PSR for anything that would be likely to form your London service).
Might still be a decent offering even with the 10mph. The paths are likely to be the bigger issue, and finding sufficient 810s in due course (it'd have to be an extension of the Sheffield service to make any sense).
 

465fan

On Moderation
Joined
26 Jul 2009
Messages
503
Location
Bexley
Looking at the Northern site, the marginally quicker way to London from Huddersfield seems to be via Wakefield Kirkgate and Westgate (2 changes) and at times this is significantly cheaper than other routes.
I can believe it, albeit I would have hoped, at some point, that when Open Access is gone we will be at a peak point where the GC services (some of which don't even go through Ponty anymore) can be got gone.

Running a half-hourly service from Huddersfield to Kirkgate, with an hourly York / Scarborough / somewhere, and an hourly to Ponty / Askern / Donny, would be great. West Yorkshire having a half-hourly service between Hudd and Wakefield isn't a daft idea.

== Doublepost prevention - post automatically merged: ==

Might still be a decent offering even with the 10mph. The paths are likely to be the bigger issue, and finding sufficient 810s in due course (it'd have to be an extension of the Sheffield service to make any sense).
It would be quite atrocious, I would think. Really slow route, all that way to Sheffield and then going up the MML on a 5 car. You'd be a lot better directing people to turn-up-and-go services that fundamentally work to Manchester and Leeds, and then down to London.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,307
Location
Oxford
You'd be a lot better directing people to turn-up-and-go services that fundamentally work to Manchester and Leeds, and then down to London
I completely agree, but it there is to be a Huddersfield to London service...

GC call at Mirfield "for Huddersfield" as well, don't they? I doubt it'd work, but they could theoretically zigzag in and out of Huddersfield on their way to London.
 

Farigiraf

Member
Joined
23 Jul 2023
Messages
1,186
Location
Bridge on the River Cam
Regarding serving Huddersfield (which I would prioritise for London services, as it's one of the largest towns without a London service that does not have a major city nearby e.g. Bolton) , unless the Mirfield rebuild makes connections onto GC a lot easier, there are three possibilities of how to route the train:
1. via Sheffield and Barnsley - this would give a number of stations a London service (Meadowhall, Barnsley, Denby Dale and possibly more), but for that you would need to find a way to slot in an intercity train between the eventual 2tph all-stops services on the line. There may also not be as much demand as expected from some of those stations to London.
2. The existing GC route from London to Wakefield Kirkgate, then on to Huddersfield. Most likely the simplest route, could have it as a Bradford/Huddersfield joined GC service which splits/joins at Mirfield. Just having an improved Huddersfield-Mirfield service and an easy same-platform connection at Mirfield seems easier for this though.
3. Routing via the WCML, most likely post-HS2. Classic route to Stockport, then either Piccadilly and round the Ordsall Chord, or using the Stockport-Stalybridge line. If an OAO were to try this route, there would most likely also be stops at Stoke and along the Trent Valley, but running right through Manchester would likely not get approved due to significant revenue abstraction, so instead, only stopping at Reddish South or Stalybridge, then on to Huddersfield, could work.
 

465fan

On Moderation
Joined
26 Jul 2009
Messages
503
Location
Bexley
I completely agree, but it there is to be a Huddersfield to London service...

GC call at Mirfield "for Huddersfield" as well, don't they? I doubt it'd work, but they could theoretically zigzag in and out of Huddersfield on their way to London.
But on that basis, the consideration of a service which leaves Huddersfield, simultaneously stops at Mirfield (people from Brighouse can change there as well), then goes to Kirkgate (where there is probably a stack of underserved transport need between that Mirfield and Huddersfield area and Wakefield), and down to Pontefract, and across to Doncaster, and runs every hour from Monday to Sunday, is oodles better than an irregular Open Access service.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,307
Location
Oxford
But on that basis, the consideration of a service which leaves Huddersfield, simultaneously stops at Mirfield (people from Brighouse can change there as well), then goes to Kirkgate (where there is probably a stack of underserved transport need between that Mirfield and Huddersfield area and Wakefield), and down to Pontefract, and across to Doncaster, and runs every hour from Monday to Sunday, is oodles better than an irregular Open Access service.
If the forum had a "like", I'd click it.

With TRU promising 4tph non-stop to Leeds then that will probably be the obvious route to take for London. An hourly train to Doncaster would be more beneficial for the intermediate stations.
 

465fan

On Moderation
Joined
26 Jul 2009
Messages
503
Location
Bexley
If the forum had a "like", I'd click it.

With TRU promising 4tph non-stop to Leeds then that will probably be the obvious route to take for London. An hourly train to Doncaster would be more beneficial for the intermediate stations.
I'm not sure how this fits into the Blunkett ideas, but given the slow lines will be segregated, and given the improved capacity, I don't think there's much excuse to offer a poor service for the likes of Huddersfield - Halifax - Bradford Interchange (definitely should be half-hourly), nor Huddersfield - Kirkgate (should likewise be half-hourly). And if you are running those sides of the 'triangle' as half-hourly, then Hebden - Brighouse - Mirfield - Dewsbury should be half-hourly as well, creating a 'web' of connections and making Mirfield a good-quality interchange.

Of course, this won't happen because if the electrification is going from Manchester to Leeds, to run a diesel unit that comes up the Copy Pit / Rochdale side through Dewsbury would seem daft. It is a great shame.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,307
Location
Oxford
TRU is a bit of a mini HS2 in the sense that it could open up a whole array of local journeys by getting the fast trains in the area out of the way.

But we're heading off topic there.
 

renegademaster

Established Member
Joined
22 Jun 2023
Messages
2,217
Location
Croydon
but also Victoria bans diesel in the Southern platfor
They can rub into 19 and mabye a few others, they have extractor fans on the London end and the pullman services depart from their every other week. Might only be loco hauled allowed however since i only think theirs one vent per platform.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,842
As the OP specified ‘place’ rather than town or city, I will go with the biggest (and almost certainly most lucrative revenue generator for London traffic) without a direct rail link to London.

Luton Airport.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,292
Location
Bolton
As the OP specified ‘place’ rather than town or city, I will go with the biggest (and almost certainly most lucrative revenue generator for London traffic) without a direct rail link to London.

Luton Airport.
If Luton Airport is a permitted answer I'm having Ramsgate as my entry.
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,265
If Luton Airport is a permitted answer I'm having Ramsgate as my entry.
Doesn't Ramsgate have a direct rail link to each of London Victoria, London St Pancras, London Cannon Street and London Charing Cross? Seems quite well provisioned based on that.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,292
Location
London
I think Starmill refers to the distance between Ramsgate town centre and the station.

Metropolitan satellite town and cities should have good quality connections to their metropolitan centres first and foremost to support the functioning of metropolitan economies. This is sometimes an unpopular point - it's actually easier to encourage people to change trains than to get trains to change tracks in ways the infrastructure isn't designed to accommodate. This isn't just a theoretical point - it's proven in places like London, the Netherlands and Japan.

The obsession with every secondary location getting its own direct service to London is actively impeding the ability to provide metro-style local services, and the result is a loss of aggregate capacity and degradation of performance so everybody suffers.

Bradford (via Pudsey), Airdale/Wharfdale and Harrogate lines ought to be self-contained metro-style lines with trains running exclusively to the low numbered bay platforms. This would actually improve the consistency in their London connections. Get the first train at the 'home' end and connect onto the half-hourly Leeds - London. This is how people in London access inter-city services.

The priority to Huddersfield is the provision of reliable 4tph TransPennine services to both Manchester and Leeds, so passengers can turn-up-and-go not just to those metropolitan centres but through them by means of interchanges.
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,265
I think Starmill refers to the distance between Ramsgate town centre and the station.
Thanks for the clarification. Places situated a fair distance away from the railway station of the same name that purports to serve them, are perhaps worthy of an entirely separate discussion. ;)
 

nr758123

Member
Joined
3 Jun 2014
Messages
645
Location
West Yorkshire
Members of parliament tend to be quite keen on direct trains to London, because that's the train journey they most often make. Their constituents are more interested in local journeys to the nearest cities.
 
Status
Not open for further replies.

Top