Converting the Leigh V1 Bee Network guided busway to Metrolink

Status
Not open for further replies.

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,890
Location
Cambridge
Taking the V1 from my current home in Salford Quays to Leigh, where I had a house viewing recently, I was taken aback by just how much the guided busway resembles a tramway. Obviously I expected the buses to have segregated track-style roads, but even the bus stops are laid out and set up like Metrolink stations. I can't help wondering if it would be worth converting it to Metrolink, and I suppose just sharing with buses from where it joins the standard road bus lanes from Salford to in between Exchange Square and St Peter's Square. It seems very much like a lot of the infrastructure is largely already there.

Leigh is of course one of the largest towns in the UK without a railway station, and I don't think anyone is of any doubt that a tram is generally a nicer, more pleasant and efficient way to travel than a bus.

This could of course apply to the V2 to Atherton as well, but this only utilises half of the guided busway before diverging onto conventional roads, so it becomes trickier. Whereas the V1 utilises the entire busway, and when it joins it just after Salford, it remains on it all the way to Leigh. So you wouldn't have to build any disruptive street running in Leigh, you could terminate where the busway ends immediately before Lidl, by the high street.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,648
Location
Greater Manchester
I have long felt the busway should have been built as tram (connecting to Eccles).

I can't see the investment happening to upgrade it, it would probably need to be torn apart and put back together.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
I have long felt the busway should have been built as tram (connecting to Eccles).

I can't see the investment happening to upgrade it, it would probably need to be torn apart and put back together.
The Eccles tram is incredibly slow, so it would likely be slower than the bus.I think it will happen in the medium term, but with a connection to the Atherton line.
 

Leyland Bus

Established Member
Joined
20 May 2021
Messages
1,226
Location
York
I may be misremembering here but I'm sure that it was built to Metrolink specs (trackbed, infrastructure etc) so that it could be easily upgraded to trams should the money become available down the line. Future proofing so to speak...
 