Why does Platform 3 at Richmond not have fourth rail for London Underground trains.

Status
Not open for further replies.

stadler

Established Member
Joined
5 Jun 2023
Messages
3,304
Location
Horsley
Why was P3 at Richmond never electrified with fourth rail to enable LU trains to use it? This one has always baffled me. There are five terminus platforms and they only put the fourth rail in four of them. It would hardly cost anything to do P3 as well and it would add extra flexibility during disruption or if some of the other four platforms had to be temporarily closed. Is there any particular reason why P3 never had fourth rail added to enable LU to use it?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,546
Location
West London
Platform 3 was electrified with the 4-rail North London system until the 1960s
corrected below
 
Last edited:

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,333
So, if platform 3 at Richmond is non-electrified, what trains are routinely using it? There look to be several departures from there.
 

Flange Squeal

Established Member
Joined
17 Jul 2012
Messages
1,868
So, if platform 3 at Richmond is non-electrified, what stock is routinely using it? There look to be several departures from there.
It is electrified - just with third rail, not fourth rail like the other bay platforms are. It’s therefore used by London Overground services but not London Underground.
 

Hophead

Established Member
Joined
5 Apr 2013
Messages
1,400
Pre-Covid, I was a commuter using Richmond most mornings and evenings and it was rare to even see an Overground 378 in Platform 3.
 

etr221

Established Member
Joined
10 Mar 2018
Messages
1,610
The extent to which LO and LU (District) trains stick to their own platforms is always something I find a bit surprising...
Platform 3 was electrified with the 4-rail North London system until the 1960s
I don't think it was. Going back in time, while platforms 4-7 were always 4-rail electrified for LMS/LPTB trains via Gunnersbury, platform 3 was 'Southern' and scarcely used (possibly only for parcels vans) - I'm not even sure whether/when it was electrified. And the station was just as divided for passengers, with seperate barrier lines.

When the SR rebuilt the station in the 1930s (?) they provided for four tracks/platforms, with two islands, for their Windsor Line services - there would have been a new down line beyond platform 1, while the platform 3 would have been extended as a through line. But that plan for quadrupling got no further.
 

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,546
Location
West London
I don't think it was. Going back in time, while platforms 4-7 were always 4-rail electrified for LMS/LPTB trains via Gunnersbury,
Apologies, I was referencing this photo, which is clearly not therefore of Richmond:
https://flic.kr/p/eaXcAh

== Doublepost prevention - post automatically merged: ==

The extent to which LO and LU (District) trains stick to their own platforms is always something I find a bit surprising...
In the late-70s, early-80s trains were using a reversed arrangement to now, NLL in 6/7, Districts in 4/5.
(although given the above error, i maybe mis-remembering my career now!)
 
Last edited:

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,307
Location
West Wiltshire
Apologies, I was referencing this photo, which is clearly not therefore of Richmond:
https://flic.kr/p/eaXcAh
That picture is of Richmond, the unelectrified track is a third one between the other two, a former loco release line or non-electric empty stock stabling (now lifted)

== Doublepost prevention - post automatically merged: ==

When the SR rebuilt the station in the 1930s (?) they provided for four tracks/platforms, with two islands, for their Windsor Line services - there would have been a new down line beyond platform 1, while the platform 3 would have been extended as a through line. But that plan for quadrupling got no further.
Correct, it was late 1930s, the next stage was rebuilding Twickenham to the other side of the road bridge, which was started then WW2 stopped the work. That was only finished in 1950s, although the two islands were never fully used to provide cross platform interchange fast/slow as the independent tracks to the Kingston loop were never completed.

A final stage would have been extra track from St Margaret's to Richmond with new river bridge, so centre track could be a reversible fast, leading to 4 through tracks (two island platforms) at Richmond. Would have allowed extra tidal flow commuter trains on the newly (1939) electrified Reading line.

The idea of reviving the widening did get looked at again back in late 1980s or early 1990s when the Overground Network was being looked at with a possible outer circle, extending the Overground line via Kingston loop. But the extra river bridge was deemed too expensive.
 
Last edited:

stuving

Member
Joined
26 Jan 2017
Messages
747
The extent to which LO and LU (District) trains stick to their own platforms is always something I find a bit surprising...

I don't think it was. Going back in time, while platforms 4-7 were always 4-rail electrified for LMS/LPTB trains via Gunnersbury, platform 3 was 'Southern' and scarcely used (possibly only for parcels vans) - I'm not even sure whether/when it was electrified. And the station was just as divided for passengers, with seperate barrier lines.

When the SR rebuilt the station in the 1930s (?) they provided for four tracks/platforms, with two islands, for their Windsor Line services - there would have been a new down line beyond platform 1, while the platform 3 would have been extended as a through line. But that plan for quadrupling got no further.
Returning to the original question: that photograph (of Richmond after 1962) does show fourth rail in P3. So it must have been put in earlier and taken out since then.
 

Jan Mayen

Established Member
Joined
30 Sep 2020
Messages
1,363
Location
Sussex
Just seen a LO train depart platform 3. What I hadn't realised is that it isn't connected to the SWR tracks. I assumed it was, and so could be used by SWR or LO.
 

stadler

Established Member
Joined
5 Jun 2023
Messages
3,304
Location
Horsley
Out of interest what would happen if the signaller accidentally sent an S Stock in to P3 and the driver did not realise? How would a fourth rail train react to third rail? Would it end up stuck there and unable to move?
 

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,546
Location
West London
Out of interest what would happen if the signaller accidentally sent an S Stock in to P3 and the driver did not realise? How would a fourth rail train react to third rail? Would it end up stuck there and unable to move?
An LU train wouldn't get past the home signal GB17 as the trainstop would remain up.
(as happened on the "Battery Rover" rail tour 2 October 1988!)

== Doublepost prevention - post automatically merged: ==

Just seen a LO train depart platform 3. What I hadn't realised is that it isn't connected to the SWR tracks. I assumed it was, and so could be used by SWR or LO.
Connection removed around 2020.
 
Last edited:

Belperpete

Established Member
Joined
17 Aug 2018
Messages
3,717
An LU train wouldn't get past the home signal GB17 as the trainstop would remain up.
(as happened on the "Battery Rover" rail tour 2 October 1988!)

== Doublepost prevention - post automatically merged: ==


Connection removed around 2020.
wasn't that when the through siding connection was removed? I thought the SWR connection to platform 3 went long before that?
 

Mr. SW

Member
Joined
13 Sep 2023
Messages
553
Location
Armchair
I remember well the connection between Pl.3 and the Up line. It had been out of use for a long time when it was removed. I think the last time it was used seriously was for the transfer of the 2-EPB trains to the North London Line (I think?). The third rail for the connection bristled with jumper cables and hook switches to facilitate this. I also think the removal of the fourth rail was simply so that there was less to worry about during stock transfers like this and to keep the Southern side of the station tidy, as it were.
 

Craig1122

Member
Joined
14 May 2021
Messages
375
Location
UK
The extent to which LO and LU (District) trains stick to their own platforms is always something I find a bit surprising...

It's not uncommon to see them swap platforms however 6 & 7 allow parallel movements in and out at the same time, 4 & 5 do not therefore it makes sense for the more frequent District service to use 6 & 7. Trains leaving 3 have to cross all lines and will therefore be slower hence why it isn't used as much.

One exception is rugby days when the usual Overground & Underground platform working tends to be swapped. This is because 4/5 is a wider platform and more able to handle the additional passenger flow.
 

Gag Halfrunt

Member
Joined
23 Jul 2019
Messages
1,008
When the SR rebuilt the station in the 1930s (?) they provided for four tracks/platforms, with two islands, for their Windsor Line services - there would have been a new down line beyond platform 1, while the platform 3 would have been extended as a through line. But that plan for quadrupling got no further.

The SR must have considered that as a long term ambition, because part of the concourse would have to be demolished to turn Platform 3 into a through line. It does explain why there is a separate staircase down to Platform 2, as well as the wide staircase from the ticket hall to the concourse.


(Photo shows the concourse at Richmond station, looking east towards Platform 3.)


(Photo shows the concourse with Platforms 1 and 2 in the background, with Platforms 3 and 4 off to the left.)
 

Sunil_P

On Moderation
Joined
31 Oct 2022
Messages
528
Location
Ilford
Richmond Junction (the junction between the LSWR mainline and the District/NLR route) was eliminated in 1972, but partially reinstated in 1985 as an indirect connection to transfer stock between Platform 3 and the main line. It was finally eliminated for good on 2015.
 

etr221

Established Member
Joined
10 Mar 2018
Messages
1,610
The SR must have considered that as a long term ambition, because part of the concourse would have to be demolished to turn Platform 3 into a through line. It does explain why there is a separate staircase down to Platform 2, as well as the wide staircase from the ticket hall to the concourse.


(Photo shows the concourse at Richmond station, looking east towards Platform 3.)


(Photo shows the concourse with Platforms 1 and 2 in the background, with Platforms 3 and 4 off to the left.)
It (SR Windsor Line quadrupling through Richmond) was, a someone has described ealier in this thread a medium-long term ambition. But it was certainly provided for in the new 1930s station: I don't believe there is any part of the station structure that would obstruct the new up line through platform 3, it would just be a matter of digging out part of the concourse to provide the trackbed.

And as I remember it from the 1960s, there was a barrier line (with gate never opened whenever I was there) dividing platforms 2 & 3 from 4 to 7 (to go with booking office segregation between 'Southern Rly.' and 'LMSR and LPTB' lines, as the window signs put it), with the two seperate staircases down from the entrance/booking office level - and requiring an 'up and over' change from up Southern to NLL/District Line services.
 