• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

GWR Class 230 Information, Movements & Discussion.

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DavidGrain

Established Member
Joined
29 Dec 2017
Messages
1,488
We know that GWR owns 3 class 230 in storage and now know how to convert them to working trains, although I think they are 2 car units.

Also we do not know what was included in the purchase of Vivarails IP and equipment which could include additional D Stock units.
 

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
We know that GWR owns 3 class 230 in storage and now know how to convert them to working trains, although I think they are 2 car units.

Also we do not know what was included in the purchase of Vivarails IP and equipment which could include additional D Stock units.
They also purchased 67 unmodified D78 Cars. That is correct the ones in storage which are the ex-LNR ones are 2 car units.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,099
We know that GWR owns 3 class 230 in storage and now know how to convert them to working trains, although I think they are 2 car units.

Also we do not know what was included in the purchase of Vivarails IP and equipment which could include additional D Stock units.
We also know (from someone who appears to be very closely involved in the project posting on this thread) is that those units are in a very poor state, and that the DfT is not showing any inclination to fund any more conversions.
 

DavidGrain

Established Member
Joined
29 Dec 2017
Messages
1,488
A new video by Jago Hazzard suggests that 230001 may not go into regular service but just have been used as a test of battery powered trains.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,607
Location
Greater Manchester
A new video by Jago Hazzard suggests that 230001 may not go into regular service but just have been used as a test of battery powered trains.
A random comment on the video appears to claim to be someone involved, but they could just be making it up:
@bryanduncan6178 - 3 hours ago

I'm glad you had a good day yesterday. We've jumped through a ridiculous amount of hoops to get the project this far! The unit itself will start passenger service on the last Friday in July and then probably do two days a week from September. Why not 6 days a week? The shunt moves require additional diagrams to get the Turbo out of the way and the battery unit on the branch - these diagrams require additional drivers that the DfT won't fund! The joy of railway projects.... The whole project is now in limbo waiting for the DfT to decide what to do next....
 

Woods

Member
Joined
3 Sep 2021
Messages
187
Location
Guildford
A new video by Jago Hazzard suggests that 230001 may not go into regular service but just have been used as a test of battery powered trains.
I'm a great fan of Jago Hazzard's videos and with this latest video he's done the project proud, but on this particular fact he has got the wrong end of the stick and I'm not sure how; it is still very much the intention that 230001 will carry 'regular fare paying passengers' and indeed that is due to start rather soon. But in the spirit of not wanting to over-promise and under-deliver, GWR are being very coy about the exact start date. When it happens, it will happen! It will only be 1 day a week to begin with, gradually increasing through the year as more drivers are passed out on it, with the intention that it will eventually be covering all 6 days a week (there is no Sunday service). Of course, being only one of a kind, it is unrealistic to expect 230001 to cover the service 6 days a week forever more, so there will be occasions when a Turbo is substituted back in, but the intention is to run 230001 as often as possible.

== Doublepost prevention - post automatically merged: ==

We also know (from someone who appears to be very closely involved in the project posting on this thread) is that those units are in a very poor state, and that the DfT is not showing any inclination to fund any more conversions.
This I believe, is still the case, that GWR is not pushing for, and DfT are not inclined to fund, any more 230 conversions, for their branch lines. Which I believe is rather a shame, because now it has been proven that the 230 (with Fast Charge) is finally mature enough to do this sort of thing (after effectively 10 years of development!), and it could in theory be rolled out to other branch lines within 2 or 3 years if the will was there. But there is so much uncertainty in the industry at the moment, and so little money available, nobody really knows what the game plan is on anything.

== Doublepost prevention - post automatically merged: ==

That is the bonkers thing.
There is the 3 car battery 230 doing all the trials and testing and there are three 2 car diesel 230s, presumably still in the state they wee withdrawn from LnWR at Bletchley. Without some metallic surgery you couldn't really produce another 3 car unit to back up the prototype.
Is the centre car a trailer, or does it have batteries etc ?
You could very easily produce 7 or 8 copies of 3-car no. 230001, there are still enough stored D78 Driving Motor (DM) and Trailer (T) cars to achieve that.

== Doublepost prevention - post automatically merged: ==

Curious. The sectional appendix says the platform is 47m long, but a class 230 is 56m. And the points are immediately beyond the end of the platform - there is certainly not a spare 9 metres.

Some work was done on Bourne End and it was concluded that a 3-car would actually fit. Was looking for a diagram I had but can't currently find it.....
 
Last edited:

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,176
I'm a great fan of Jago Hazzard's videos and with this latest video he's done the project proud, but on this particular fact he has got the wrong end of the stick and I'm not sure how; it is still very much the intention that 230001 will carry 'regular fare paying passengers' and indeed that is due to start rather soon. But in the spirit of not wanting to over-promise and under-deliver, GWR are being very coy about the exact start date. When it happens, it will happen!
Agree with your comments about the ”Jago Hazzard” YouTube channel. When considering his recent videos, he seems to be pushing a narrative of a proposal to remove the Greenford branch from National Rail, to become part of a ”West London Tram”. Perhaps it's just an idea that generates him the most YouTube ’clicks’.

This is all off-topic speculation but it may explain his interpretation of the 230001 situation.
 

Bob Price

Established Member
Joined
8 Aug 2019
Messages
1,243
Agree with your comments about the ”Jago Hazzard” YouTube channel. When considering his recent videos, he seems to be pushing a narrative of a proposal to remove the Greenford branch from National Rail, to become part of a ”West London Tram”. Perhaps it's just an idea that generates him the most YouTube ’clicks’.

This is all off-topic speculation but it may explain his interpretation of the 230001 situation.
He has done a recent one to double back on the tram idea due to the amount of freight on the line. Also he would only report what GWR are telling him. If 001 does enter service that would be great but the concept of fast charging has shown to work and that is a positive. Let show the technology can be rolled out wider including the Borderlands line.
 

Invincible

Member
Joined
23 Apr 2022
Messages
854
Location
Surrey
Looking at the bigger picture, the DfT/ GBR transition tender team are looking at the future of DMUs (and class 165/165 Networkers) with the various SE tender shortlisted manufacturers, so probably discussing how fast charge battery technology can be incorporated into new build leased trains?.
The current DMUs have some life left, (and the current DMUs can run the GWR branch lines) so no need to rush new train orders, but the UK train factories will need some orders soon to survive.

Interesting reading Woods post. Does seem a shame to keep the 230 in sidings after it has proved the battery technology works (if it is a lower operational cost to staff the 165 where extra training, and shunting, is not needed?).
 
Last edited:

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
Some work was done on Bourne End and it was concluded that a 3-car would actually fit. Was looking for a diagram I had but can't currently find it.....
Are you referring to the diagram which can be found between timestamp 38:56 to 39:08 in this video =
 

cbg5040

New Member
Joined
3 Jul 2025
Messages
2
Location
Cambridge
I'm a great fan of Jago Hazzard's videos and with this latest video he's done the project proud, but on this particular fact he has got the wrong end of the stick and I'm not sure how; it is still very much the intention that 230001 will carry 'regular fare paying passengers' and indeed that is due to start rather soon. But in the spirit of not wanting to over-promise and under-deliver, GWR are being very coy about the exact start date. When it happens, it will happen! It will only be 1 day a week to begin with, gradually increasing through the year as more drivers are passed out on it, with the intention that it will eventually be covering all 6 days a week (there is no Sunday service). Of course, being only one of a kind, it is unrealistic to expect 230001 to cover the service 6 days a week forever more, so there will be occasions when a Turbo is substituted back in, but the intention is to run 230001 as often as possible.
Just to clarify, with thanks for the information here, is the plan for 230001 to be in service on the Greenford branch line? Would really love to ride it when the time comes!
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,607
Location
Greater Manchester
Just to clarify, with thanks for the information here, is the plan for 230001 to be in service on the Greenford branch line? Would really love to ride it when the time comes!
Welcome to the forums, currently, there is no information from the train operating company that it will enter service.
Some people have said that it will, but there is nothing certain or public yet.
 

Invincible

Member
Joined
23 Apr 2022
Messages
854
Location
Surrey
Perhaps GWR and DfT are being cautious as the 769 introduction on GWR line to Gatwick was fraught with various problems, although the 230 has tested well and battery power is the future?

I see Porterbrook are still pushing the 799 Hydrogen 319 conversion on display at Kidderminster station today before the Derby event, but doubt it or any other Hydrogen powered train will enter service
 

martin butler

Member
Joined
9 Oct 2018
Messages
874
As GWR, already has stock of unconverted coaches, and with the modular system that's used, would it not be cheaper to convert what's left of the D stock to fast charge battery configuration, and concentrate them in Devon and Cornwall for use on the branch lines down there, with just a couple of units at reading for the Marlow branch?

The 230 may be based on the D78, but much of it is new, and has plenty of life left in how much would it cost for a small sub build of bespoke short body battery units especially if they have to be built as a short order, and battery 230'S could be ready to replace the aging DMU's in what 2 years? how long would it take for a supplier to build a small one-off design?
 

Invincible

Member
Joined
23 Apr 2022
Messages
854
Location
Surrey
As GWR, already has stock of unconverted coaches, and with the modular system that's used, would it not be cheaper to convert what's left of the D stock to fast charge battery configuration, and concentrate them in Devon and Cornwall for use on the branch lines down there, with just a couple of units at reading for the Marlow branch?

The 230 may be based on the D78, but much of it is new, and has plenty of life left in how much would it cost for a small sub build of bespoke short body battery units especially if they have to be built as a short order, and battery 230'S could be ready to replace the aging DMU's in what 2 years? how long would it take for a supplier to build a small one-off design?
Think the DfR GBR policy would be to go for new leased trains (with batteries) to eventually replace the DMUs with low upfront costs and a 30-40 year life, rather than a high upfront cost of conversion (where money is tight) with a limited say 10 year life.

But we will see, Porterbrook still seems to want to provide converted trains on a leased basis?
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,176
Location
0035
Just seen the unit in the bay road at Greenford; out of service.
 

vuzzeho

Member
Joined
11 Apr 2022
Messages
667
Location
London
Seems like they're not going to run in service. GWR's latest Instagram post says:

Sorry Spotters No, we’re not going to see underground trains replacing current trains on the mainline – but this one has done a great job acting as the testbed for proving our fast-charge battery technology⚡

 

sad1e

Member
Joined
26 Aug 2024
Messages
993
Location
London
Seems like they're not going to run in service. GWR's latest Instagram post says:



What will be the fate of the 230 now it's known it won't enter passenger service ?

Departmentmental battery charger tester for future battery projects?

Or off to the scrapman at Newport sims.

Thinking about it this is the second time GWR have got pretty far into preparing and testing a unit for service before binning it. First the 769s now the 230.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,176
If they have definitely decided that there will be no more conversions it would be a bit of a waste of money.
230001 has, in its existence thus far, only ever acted as a demonstrator unit. So I’m not sure what your ”waste of money” statement is in reference to - the unit is only doing what it was built to do.
 

Anonymous10

Established Member
Joined
19 Dec 2019
Messages
2,631
Location
wales
What will be the fate of the 230 now it's known it won't enter passenger service ?

Departmentmental battery charger tester for future battery projects?

Or off to the scrapman at Newport sims.

Thinking about it this is the second time GWR have got pretty far into preparing and testing a unit for service before binning it. First the 769s now the 230.
One would hope a few will be kept as spares for those in use.
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
5,944
230001 has, in its existence thus far, only ever acted as a demonstrator unit. So I’m not sure what your ”waste of money” statement is in reference to - the unit is only doing what it was built to do.

I think it was a reference to training more drivers on it.

It's still possible though I suppose that running it in actual service shows up something that wasn't seen during test runs.
 

800301

Member
Joined
29 Dec 2022
Messages
536
Location
Essex
Does the DfT think that training drivers on it would cost too much money?

There are quite a few drivers trained on it already, I don’t at this point see why it won’t make public service

On another note yes the turbo unit did happened to fail today with a fault that required assistance, should be all back to normal soon
 

Alpine Rider

Member
Joined
2 Jan 2023
Messages
57
Location
Abondance France
For the avoidance of doubt RealTime Trains shows the Faulty unit was the Class 165 diesel unit not the Class 230 which was operating earlier in the day and had already completed its scheduled runs and returned to its depot.
Just seen the unit in the bay road at Greenford; out of service.
 

RUK

Member
Joined
5 Aug 2009
Messages
452
Location
East of England
One would hope a few will be kept as spares for those in use.
As in, the GWR one might go to Transport for Wales to be a spare for the ones there after GWR have finished testing, since those are the only other Class 230s currently in use, though of a different type, and they would need the fast-charging equipment installed there as well for the GWR one to be used in service there? I don’t know if the GWR one’s batteries are the same as the ones in the TfW ones.
 

Anonymous10

Established Member
Joined
19 Dec 2019
Messages
2,631
Location
wales
As in, the GWR one might go to Transport for Wales to be a spare for the ones there after GWR have finished testing, since those are the only other Class 230s currently in use, though of a different type, and they would need the fast-charging equipment installed there as well for the GWR one to be used in service there? I don’t know if the GWR one’s batteries are the same as the ones in the TfW ones.
I was more thinking the unit / the d78 stock.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,802
Location
Cambridge
Greenford is not “the mainline” so it may well still enter service, but without expansion.
 

Top