So, we'd spend £15bn on a new route to open in 2045, and not have resignalled the line by then, introduced ETCS, wired it..How are you fitting in 2 stoppers and 2 fasts when a stopping service takes 58 minutes from Liverpool South Parkway to Castlefield? You have sections of absolute block and 6 minute headways. An EMR service takes 34 minutes. For it to not catch up the stopper if that left at xx.00 and gets to Castlefield at xx.58, it would have to pass Liverpool South Parkway 27 minutes later than the stopper at xx.27 to be 3 minutes behind it at Castlefield at xy.01. Your next stopper then goes at xy.30 and gets to Castlefield at xz.28. You need significant improvements to make that work robustly, probably to the requirement of taking 8 minutes out of the stopper. OLE isn't doing that on its own.
Looking from railmaponline.co.uk and also https://www.oldmapsonline.org, I hadn't realized that (a) there still is a siding, mostly two tracks of, to the immediate east of Warrington Central, (b) the south side of the station used to be a loco shed and the alignment was taken by a road...You still can't do a 1tph all stations as you still end with the same issue, you'll need some sort of skip stop on both services to balance it out whereupon you'll lose some station to station connectivity as a trade off. Either that or do some wacky thing where you split the service and run Liverpool Warrington and Warrington Manchester as separate services hiding in the carriage sidings for a while similar to how the current Liverpool Warrington does now.
It'd be way less than £15bn to to open a platform in that siding for the stopper from the east and make it terminate there. There won't be that many intermediate-station-to-intermediate-station travellers - most will be aiming for the big places on the route.