And the fix would be slashing the timetable to increase turnaround times. No doubt you'd be back moaning about that.
The fix is an extra unit in the Chester circuit as is done in leaf fall season.
And the fix would be slashing the timetable to increase turnaround times. No doubt you'd be back moaning about that.
Seven minutes late when the trains are every 15 minutes is a significant delay. The most sensible outcome is to run the train fast, get it back on schedule, and go from there. Annoying for one train load of passengers (although some people will be delighted at a non-stop ride home), yes, but the greater good and all that.An operator who dumps a busy train service when just seven minutes late, and kicks the passengers off at Bhead Central to run nonstop illustrates that this is an operator more happy to fudge the figures than run a service.
But the consequence of that extra unit in the circuit is that the peak extras don't run. So it is swings and roundabouts, really.The fix is an extra unit in the Chester circuit as is done in leaf fall season.
Yes it does. It doesn't have tap on-tap off (TATO) ticketing, but it has smartcard ticketing. I have one in my wallet for when I buy Saveaways.10 years on the groom has two daughters but Merseyrail still doesn't have smart card ticketing!
The 777s aren't looking scruffy at all. The worst you could say is that they've now lost the new train shine and the odd seat cover is a bit scuffed where people have put their feet on the seats. I also don't share your hate of the 777s, they're a genuine step up on the 507/508s.The 777s are already looking scruffy to add to their general rubbishness, and the network retains its general dilapidated feel.
The 777s aren't looking scruffy at all. The worst you could say is that they've now lost the new train shine and the odd seat cover is a bit scuffed where people have put their feet on the seats. I also don't share your hate of the 777s, they're a genuine step up on the 507/508s.
As for the wider network, I wouldn't agree it was dilapidated. A lick of paint wouldn't go amiss, sure, but that's not the same as dilapidation.
It is clear they're having issues with water ingress at the city centre loop stations though, especially James Street and Moorfields.
I would have thought carrying out customer research, finding out what people thought of various TOCs and publicising those doing badly and those doing well is ABSOLUTELY fundamental to their remit.An operator who dumps a busy train service when just seven minutes late, and kicks the passengers off at Bhead Central to run nonstop illustrates that this is an operator more happy to fudge the figures than run a service. No other UK operator behaves like that. If the timetable can't cope with that delay, fire the planning manager and fix it.
Another shiny new train losing time with a door locked out yesterday night at Moorfields.
As for Transport Focus wasting public money on stupid meaningless awards when they should be concentrating on targeting the failing areas of the wider railway, perhaps it's time government removed their funding.
Definitely, and the view of the actual customers , rather than that of enthusiasts or the staff is the one that really matters.I would have thought carrying out customer research, finding out what people thought of various TOCs and publicising those doing badly and those doing well is ABSOLUTELY fundamental to their remit.
To quote the late Adrian Shooter, have they thought of running the trains on time?What do you propose instead? That they simply shrug their shoulders and have everything running around seven minutes late all day long?
An operator who dumps a busy train service when just seven minutes late, and kicks the passengers off at Bhead Central to run nonstop illustrates that this is an operator more happy to fudge the figures than run a service. No other UK operator behaves like that. If the timetable can't cope with that delay, fire the planning manager and fix it.
An operator who dumps a busy train service when just seven minutes late, and kicks the passengers off at Bhead Central to run nonstop illustrates that this is an operator more happy to fudge the figures than run a service. No other UK operator behaves like that. If the timetable can't cope with that delay, fire the planning manager and fix it.
To be fair to Merseyrail, recovery isn't easy on parts of their network, and it doesn't help that that the whole operation is run on a shoestring in terms of clearly using the minimum numbers of trains / crews. That said, I hate the detraining/running non-stop as much as anyone, and it isn't really acceptable.
There are 2 extremes. Chester is way too tight, while Ormskirk to Central is now up to a tardy 37 minutes from the original 25 and still manages to run late, partly because of excessive pauses before door release and closing which are not seen on any other DOO network.
London Underground would grind to a halt if it operated like this.
The fix is an extra unit in the Chester circuit as is done in leaf fall season.
Perhaps the passengers surveyed have different priorities to you. I suspect that most passengers travelling on the short journeys typical of an urban metro are simply concerned about frequency, punctuality and reliability. If they didn't use a smartcard they won't have noticed or cared about whether the reader was working, and most passengers won't have needed the lift so again won't have noticed that it was broken (I'm not trying to downplay the importance of accessibility for those who need it). If you're only on a train for 15 minutes then you're less likely to care about standing too.This isn't what one expects from the best TOC.
Liverpool Central today: one gate totally out of use, three with the Metrocard pad broken, out of a total of 5. New lift broken again too.
Busy platforms with excessive staff (4 in total) standing around getting in the way of passenger flows as usual.
This isn't what one expects from the best TOC.
Liverpool Central today: one gate totally out of use, three with the Metrocard pad broken, out of a total of 5. New lift broken again too.
Busy platforms with excessive staff (4 in total) standing around getting in the way of passenger flows as usual.
This isn't what one expects from the best TOC.
To quote the late Adrian Shooter, have they thought of running the trains on time?
To be fair to Merseyrail, recovery isn't easy on parts of their network, and it doesn't help that that the whole operation is run on a shoestring in terms of clearly using the minimum numbers of trains / crews. That said, I hate the detraining/running non-stop as much as anyone, and it isn't really acceptable.
The network is looking a bit shabby particularly the stations - but there are definitely worse. A lot are in need of a lick of paint and a general tidy up. The loop line stations are all looking a bit untidy lately with yellow/black hazard tape holding various panels and access flaps shut, the obvious issue of ground water seeping in with absorbant mats and rusty smears all over the place.
The 777s are a lot more reliable than they were, but I did notice a lot of LEDs not working on the saloon lights as mentioned above. Some of the earlier accepted units are starting to look at bit grubby on the line (particularly under the seats).
Overall though at least the network is generally usable now.
Liverpool Central today: one gate totally out of use, three with the Metrocard pad broken, out of a total of 5. New lift broken again too.
What is the alternative to getting trains back to booked schedules, in your opinion?
What is the alternative to getting trains back to booked schedules, in your opinion?
If the platforms are that busy what is 4 staff here or there? Maybe they are getting in the way and that could be improved. But if the platform is as busy as you say then what good will removing them do?

Along with a hatred of 720s, a love of Grammar seats, 350s and takt, a preference for 350 standard over "sham first," and an advocation for names such as "BritRail."Your anti merseyrail whinging is almost legendary on this forum
I like Merseyrail but they could do better. With a replacement of the faded, mouldy Rail Alphabet signage, more doubles on the Northern line, contactless payment and things like that, it'd be fantastic.
Designing the timetable so there’s sufficient breathing space that run-of-the-mill delays can be absorbed naturally as far as possible, in particular decent layovers at termini. I realise this requires more trains / crews, hence my comments about it being more of a political issue.
Theres also scope to reform trains at crew relief points, again if the crew diagrams are designed in a way which makes this viable. Note that LU run a metro service and don’t skip stops (except occasionally on the Met Line).
The traditional way it was done prior to the 2002 TOC was cancelling a round trip entirely (e.g. pop it out at Kirkdale or Central* and put it back in on time). Running fast was totally unknown.
Indeed all us on here are a statistical sample of one, however extreme our views.Perhaps the passengers surveyed have different priorities to you.
I don't think it is meant to be fair but it does provide some interrsting pointers.The point here is that people don't feel that Merseyrail is a fair comparison to other TOCs with different operating models - and I think that's reasonable as they're not a 'typical' TOC.
Merseyrail doesn't operate in the same way as (any?) other TOCs, the network is isolated and has more in common with a system like the Underground or Tyne and Wear Metro. Short hops on and off.
It will also require significant infrastructure changes too, which is the real problem.Designing the timetable so there’s sufficient breathing space that run-of-the-mill delays can be absorbed naturally as far as possible, in particular decent layovers at termini. I realise this requires more trains / crews, hence my comments about it being more of a political issue.
When there are delays, LU pull trains out of service then re-insert them back into the diagram 'on time'. That doesn't matter much on a service which, on some lines, can be up to 30tph. Unless you hear the 'the destination of this train has changed' announcement, you won't even notice if a train gets turned short at somewhere like Seven Sisters or Willesden Green.Note that LU run a metro service and don’t skip stops (except occasionally on the Met Line).
Are they really very much different to the 'metro' services provided by, say, SouthEastern or Southern? The latter have a few more interfaces with the wider network, yes, but the core service- a 4tph suburban train- is the same across many TOCs.The point here is that people don't feel that Merseyrail is a fair comparison to other TOCs with different operating models - and I think that's reasonable as they're not a 'typical' TOC.