We knock down the housing developments as we could get alot more housing developments if we get this done.It's now pretty impossible to put platforms on the met line or CML at West Hampstead due to all of the housing development that has sprung up on ex railway land around West Hampstead.
Although in the late 2000's Chiltern had a plan to use that railway land to build plats for the met line and CML at West Hampstead but in the end that fell through due to the financial crash of 2008.
Quite a shame it never got built to be honest.
I'd say that the Met Line is possible with the space we have now if we convert the giant Jubilee Line island platform into 2 smaller island platforms similar to the ones at Finchley Road.It's now pretty impossible to put platforms on the met line or CML at West Hampstead due to all of the housing development that has sprung up on ex railway land around West Hampstead.
Although in the late 2000's Chiltern had a plan to use that railway land to build plats for the met line and CML at West Hampstead but in the end that fell through due to the financial crash of 2008.
Quite a shame it never got built to be honest.
High Wycombe could do with some additional platforms.At this point, wouldn't electrifying the Chiltern mainline, reinstating through loops at Beaconsfield, and a total reconfigure of High Wycombe be a more useful outcome?
Probably a substantial length of new tunnel, and possibly a new underground pair of platforms at Old Oak Common.I don't think there's sufficient passive provision at OOC for that. Though what infrastructure would be needed to send the Chiltern services into Paddington now crossrail has taken most of the locals?
2 Oxford, 2 Birmingham, 1 Wycombe, more at peak.Probably a substantial length of new tunnel, and possibly a new underground pair of platforms at Old Oak Common.
How many trains actually leave Marylebone for the Chiltern Main Line each hour?
There is a challenge with Jubilee line access at West Hampstead. It’s just about acceptable as it stands as it is grandfathered in.I'd say that the Met Line is possible with the space we have now if we convert the giant Jubilee Line island platform into 2 smaller island platforms similar to the ones at Finchley Road.
It is 3 minutes and you would be looking at a 5 minute dwell at a station.I don’t know the signalling headways there but (simplistically) if it were three minutes you’ve got a minimum of six minutes dwell for the service being overtaken and a reliance on both trains running perfectly.
No chance. It takes 18 minutes to get to Northolt Park Jn, so the next train can't pass until xx.21, so if thats a fast it can't leave Marylebone until xx.11. If the next stopper leaves at xx.15 you can only run 4 fasts per hour.I think you could also do a quarter hourly stopper as far as Ruislip.
Well they only run 4 fasts an hour!If the next stopper leaves at xx.15 you can only run 4 fasts per hour.
Indeed. But was giving an example of the type of length needed to make it worthwhile. More local stations on this side vs the Beaconsfield side (with outer calls too)Small matter of the M25, and, err, HS2 in the way!
I think that Sudbury Hill Harrow would be the best contender to keep. It has much nicer shelters , much wider platforms and is closer to the Piccadilly line then Sudbury and harrow road.This might be where (effectively) closing one of the Sudburys and serving the other at 15 minute intervals might buy enough to make it work.
That gap between xx00 and xx11 can be filled with an Aylesbury service.
If the line were electrified, with swift accelerating stock procured, what kind of difference would that make to the 18 minutes?No chance. It takes 18 minutes to get to Northolt Park Jn.
I say "effectively" because legally it might be more sensible to do a Pilning and serve it once a week, which would mean leaving it there. But S&HR is the one I'd close because it has a much worse interchange with the Piccadilly line.I think that Sudbury Hill Harrow would be the best contender to keep. It has much nicer shelters , much wider platforms and is closer to the Piccadilly line then Sudbury and harrow road.
Sudbury hill harrow would also be easier to put loops on as it
retains it's original platforms , although somewhat overgrown.
Sudbury and harrow road i would close. it has no facilities , very narrow and warped platforms , an odd island platform design which restricts speed through the area and is overall in the worse condition of the two.
Possibly 1 minute at best.If the line were electrified, with swift accelerating stock procured, what kind of difference would that make to the 18 minutes?
In platform count, yes.is Marylebone really a particularly attractive terminus?
Well if the Old Oak common site can accomodate sufficient platforms to run the non via Amersham service, the platform count advantage at Marylebone becomes much less important.In platform count, yes.
So no room for growth then in the future as you have fixed the timetable in stone. 2 Birmingham and 2 Oxford, nothing else.Well they only run 4 fasts an hour!
Would need tweaking for the peak to be fair.
2 maximum.Well if the Old Oak common site can accomodate sufficient platforms to run the non via Amersham service, the platform count advantage at Marylebone becomes much less important.
Does anyone know if the OOC Chiltern terminus concept has a proposed number of platforms associated with it?
I’ll take being a minute out. Hope you’re not planning on running on yellows.It is 3 minutes and you would be looking at a 5 minute dwell at a station.
That assumes coming out two minutes after the non-stopper. Pretty standard.I’ll take being a minute out. Hope you’re not planning on running on yellows.
Any late running by either train would immediately export to the other one - unless of course that lengthy dwell gets extended even further.
Old Oak Common station needs to wait until HS2 Euston is complete or because the Elizabeth Line will struggle with the passenger loads from HS2.Well if the Old Oak common site can accomodate sufficient platforms to run the non via Amersham service, the platform count advantage at Marylebone becomes much less important.
Does anyone know if the OOC Chiltern terminus concept has a proposed number of platforms associated with it?
What? OOC will open first, its not waiting for Euston.Old Oak Common station needs to wait until HS2 Euston is complete or because the Elizabeth Line will struggle with the passenger loads from HS2.
I think the point was Chiltern OOC should wait until HS2 Euston opens. And I can see the justification, crossrail is going to have a lot of heavy lifting to do when HS2 starts operating at OOC.What? OOC will open first, its not waiting for Euston.
Ah. Chiltern OOC isn't committed yet anyway. Its passive provision as there certainly isn't a design to solve South Ruislip and Greenford yet.I think the point was Chiltern OOC should wait until HS2 Euston opens. And I can see the justification, crossrail is going to have a lot of heavy lifting to do when HS2 starts operating at OOC.
Though on the other hand, Chiltern would contribute to getting people to/ from OOC, as well as potentially adding to the load on Crossrail - I guess which way the scales would tilt will depend on where the Chiltern services go.
From an enthusiasts perspective I’d reopen all the passing loops. Hugely depressing to see a massive gap between the lines.
If that is the sort of thing that you find hugely depressing, I’d seek help.
Welcome to people having an interest in something.
My apologies.
I couldn’t tell (and still can’t) whether you are using ‘hugely depressing’ as an exaggerated emotive figure of speech, or how you truly feel. My comment was based on the latter.
Yes, you are correct. Sudbury Hill specifically is constrained by embankment supports, especially on the up approach from South Harrow Tunnel. Drainage is an issue there too, but that's not a new problem. I've been told of stories with a 115 storming around the curve from South Harrow Tunnel and finding the landscape under water.I had always been under the impression that by the Network Southeast era both stations were suffering from earthworks problems (one on an embankment and one in a cutting). It made sense to re-site the platforms ‘in the middle’ rather than have them ‘disappearing down the bank/under a landslip’. With no operational need for loops at the time it wasn’t a difficult decision.