greatkingrat
Established Member
- Joined
- 20 Jan 2011
- Messages
- 3,312
Many people use the Overground even if it is slower to avoid zone 1 fares, or if they don't like deep tubes.
This would end using the WLL as a transfer between Willesden lines and Clapham, and those on the Willesden lines and Shepherds Bush Westfield.An option I havent seen suggested is for the entire Overground service from Clapham Junction to use the existing curve just south of Willesden Junction (without platforms) and reverse at a new single bay platform between the lines at Acton Wells Junction, before heading up the Dudding Hill line to Harlesden (Bakerloo interchange) and Hendon. The entire Overground service from Stratford would call at the nearby new pair of platforms before heading half to Richmond and half to Hounslow. Thus all Overground services would call at 3 nearby platforms (with one set of staff), and all services towards South Acton would use one platform instead of two different ones, and all services towards Gospel Oak would use one platform instead of two different stations a kilometre apart .

Really sorry but that’s not how it works. Many, many people use the overground for long distances, such as me regularly between West Brompton and Gospel Oak. Yes it would probably be quicker to go via Embankment and the northern line but the overground is more pleasant, easier and cheaper (avoids zone 1). I speak as a daily user of the ‘Mildmay line’.Even Highbury and Islington is much faster to reach by taking SWR to Vauxhall and the Victoria line from there, and as for anywhere further along on the line, the time savings of going via Vauxhall or Waterloo Tube are even bigger. An hour and five minutes to Stratford is not attractive when you can do it in half an hour via Waterloo and the Jubilee.
At Tfl.gov.uk FOI-2681-2425/GHWhere is the actual FOI request with the document?
from tfl.gov.uk FOI-2681-2425/GHI don’t see the detailed plans from Mott McDonald in the video?
I got the FOI as a share from tfl.At Tfl.gov.uk FOI-2681-2425/GH
== Doublepost prevention - post automatically merged: ==
from tfl.gov.uk FOI-2681-2425/GH
I'm not sure if it's just me, but the audio on that video is incredibly quiet, however you don't need the commentary to see how this is going to cost far, far more than £500m to build.Please view:
It would cost only about £500m to do this
I will be extremely upset if this is done, unless there is a same-platform interchange at Willesden Junction high-level and the frequencies improved to every 7-8 minutes on all routes. I heavily rely on the existence of this orbital route to travel between NW London and the whole SW. This link is extremely important, especially to access places like Hampstead Heath or Gospel Oak where the tube doesn't serve.And even if it was possible, I don't think people on the Clapham branch would be very happy about swapping direct trains to Camden/Highbury/Stratford for direct trains to Harlesden and Hendon.
TfL wants the West London Orbital (WLO) to receive backing from the government in its autumn budget. If it gets approved, the line will become the seventh branch of the London Overground network.
Just as the name suggests, the WLO would bring new rail connections to north and west London, travelling from Hounslow to Hendon and West Hampstead via Old Oak Common..
The new line on the block would connect Hounslow with Hendon and West Hampstead via the likes of Brentford, Acton, Harlesdon, Neasden, Cricklewood, and Brent Cross – meaning that Londoners wishing to make the journey would no longer have to do so via a slightly inconvenient detour through the centre of the city...
Reading those articles it seems to be speculation on what might potentially happen. They're just saying here are the plans, TFL want the government to agree to fund them in the budget in November. They don't have any information on how likely or otherwise that is.There's been a lot of chatter in the press today about it potentially getting approved next month.
![]()
London is set for a new £700 million Overground line
Say hello to the West London Orbitalwww.timeout.com
![]()
London’s Transport Network Could Soon Be Getting A New £700 Million Overground Line
If Transport for London's proposed plans get the green light, west London could be getting a shiny new Overground Line soon.secretldn.com
No idea how accurate this reporting is, but seems promising.
Personally, I haven't lived in West London for a long time now so I'm not sure anecdotally how much this line would be used. I'm sure TfL have done their demand studies. One thing it does is make the case for building the Old Oak Common Victoria Road connection, which seems like a genuinely useful connection between various parts of South West London, North London and the Elizabeth Line.
One thing I do wonder about is the level crossings on Bollo Lane and how much the additional services are going to upset the locals, going from roughly 10 closings per hour to 20 or more seems like it could create difficulties, will the barriers be open long enough to make Bollo Lane even passable?
For me, terminating at Hounslow makes no sense... extending to Feltham (or even Staines) and Twickenham (or maybe Richmond) would make more sense to me.Do you think it really makes sense to include a part of the Hounslow Loop Line into this route?
One of those instances where approval is obtained to do what is likely to be funded, and then consider extensions I suspect. Hounslow can be set up for terminating services. Feltham, Staines and Richmond all more difficult. Twickenham possible but ties up a platform.For me, terminating at Hounslow makes no sense... extending to Feltham (or even Staines) and Twickenham (or maybe Richmond) would make more sense to me.
Completely out of the question? Whilst it involves a lot of flat crossings, the line through Twickenham isn't that busy that an extension couldn't be considered. At least the turn back facilities already exist.Taking services round to Twickenham via Whitton are completely out of the question and would certainly require extensive infrastructure works.
These considerations are why a new station linking to Old Oak Common are essential. That link will be by far the biggest reason people use this mooted new service.Do you think it really makes sense to include a part of the Hounslow Loop Line into this route? It may still be faster for Isleworth and Brentford residents to get to OOC/Willesden Junction and onwards to West Hampstead via a bus to Gunnersbury. Hounslow rail station is significantly inferior to the Picadilly Line for most local residents as far as I understand it. I can’t imagine many people living in the Borough of Hounslow needing to go to Harlesden/Neasden/Cricklewood or Brent Cross.
And yet, information on that station seems quite hard to come by. I believe the station is proposed to be on Victoria Road, which would be a bit of a trek to OOC, even if they built a direct footbridge.These considerations are why a new station linking to Old Oak Common are essential. That link will be by far the biggest reason people use this mooted new service.
Yes but what I am saying is that the Mildmay Line which is also supposed to have a station at OOC is already well accessible from Brentford, Isleworth and even Hounslow to some extent.These considerations are why a new station linking to Old Oak Common are essential. That link will be by far the biggest reason people use this mooted new service.
Yes but what I am saying is that the Mildmay Line which is also supposed to have a station at OOC is already well accessible from Brentford, Isleworth and even Hounslow to some extent.
== Doublepost prevention - post automatically merged: ==
How outdated is this? Shows the OOC station on the Mildmay Line but not on WLO.
It is probably easier to bore a single track tunnel under the restricted width track formation and move one of the fast lines into it. The fast lines don't need access to any intermediate stations which makes it much cheaperI'm not sure if it's just me, but the audio on that video is incredibly quiet, however you don't need the commentary to see how this is going to cost far, far more than £500m to build.
The slide showing the slue of the fast lines at Ealing Broadway requires moving the southern boundary of the GWML further south, including the overbridges which are tight up to the limits. The Kink in the Down Slow is also not suitable at all for the existing line speeds, although that may be less of a problem when OOC happens.
The slide showing the layout at West Ealing clearly shows the bay track being extended through a road bridge, so we're talking several properties being demolished (including the station) and the road bridge being reconstructed.
The slide showing the layout at Acton Wells Jn includes a signalling plan (drawn to scale) that clearly shows there simply isn't room for the alternative proposed set of platforms between the turnout ends.
And that's before we look at scheduling or performance.
The only likely option for any connectivity between WLO and the GWML would be to build out a platform on the westbound Goods Line and convert it into a reversible passenger platform.
"TfL, four west London boroughs and OPDC will invest up to £6.65m to advance plans for the West London Orbital rail line linking Hendon and Hounslow. The proposed Overground route would add four stations, improve connections and could support 25,000 homes and 11,500 jobs"
Major funding deal puts London Overground ‘missing link’ on track for next phase
PN-161 TfL, four west London boroughs and the Old Oak & Park Royal Development Corporation have agreed to commit up to £6.65m to progress the next phase of innovative rail scheme Proposals link Hendon and Hounslow with a fully accessible London Overground line that would provide ten new...tfl-newsroom.prgloo.com
My boldHow much of the Midland railway super outer circle stations still exist, (part of platforms, or buildings etc, even if closed up), if anything.
There were stations at Harlesden, Dudding Hill (long closed)
Lionel Road looks to be very close (maybe on site of) former Kew station on North and South Western junction railway. Old photographs (decades ago) suggest the third rail used to exist on this curve. Would Lionel Road station be a voltage changeover (to 25kv) point. Or will it be deemed not possible because it would mean extending third rail (even it is just reinstating it after decades)