will be very well received. The X23 is like a sardine tin at peak time, so it will be a perfect fit, the DB250 Geminis were great for capacity at peak.One of Dundee’s new Yutong DDs (8610) is to be trialled here next week, operating from Inchinnan depot. It is intended to be used on the X23 between Erskine and Glasgow.
Be good to see a capacity increase on the X23, certainly needs itwill be very well received. The X23 is like a sardine tin at peak time, so it will be a perfect fit, the DB250 Geminis were great for capacity at peak.
When will the Renfrew Bridge service start? Since it’s open now.Interesting development from SPT. Service 307 is now running throughout the day Monday to Saturday from the 19th
There isn't going to be any services going over the bridgeWhen will the Renfrew Bridge service start? Since it’s open now.
The bridge has to open to let ships pass up or down river, and can be open for relatively lengthy periods when that happens, so it wouldn’t really be very practical as a regular bus route.When will the Renfrew Bridge service start? Since it’s open now.
Notably, I believe that the PS Waverley (which incidentally appears inside refurbished ClydeFlyer vehicles) will cause this to happen quite frequently during summer season. I can't remember how long in advance that ships have to give for passing through the bridge, but it certainly isn't the kind of notice that management - at any company - would consider altering driver's hours, bus schedules and interconnected bus rotas for, to serve what would be a useful connection, but that customers might shift the blame on the company for not being able to fit rocket engines for their buses and fly over the bridge when its open, as some of them seem to expect from this industry!!The bridge has to open to let ships pass up or down river, and can be open for relatively lengthy periods when that happens, so it wouldn’t really be very practical as a regular bus route.
Twice a day during daytime hours is still a significant interruption to a hypothetical bus service. Sure, you could try your best to timetable around this - either have your bus drive a completely different alternative route (that has been proven to be financially unsuccessful) during the time the bridge is open for any ship (which isn't at set times, so you'd have to largely plan it fairly ad hoc when notice is received) - or more likely just have the route not run during this time, likely resulting in your company paying the driver to sit around and have a long break. While I know certain bus drivers who would love that shift (who wouldn't!), that certainly wouldn't be worth the effort to run a single service.PS Waverley is covering the South Coast & Solent shortly, but even so it’ll only be twice a day and possibly 4 times in an 18 hour window - not quite the same as a level crossing! I’d suggest the main traffic would be from N to S and Braehead, not the reverse to Yoker.
Renfrewshire Council River Clyde Opening Bridge Scheme 2018 Confirmation Instrument 2019 said:How to request a bridge opening
...
Category 4 vessel (tugs without a tow)
Transit upstream:
1. Contact Bridge Control minimum of 2 hours prior (different than the 3 hours for other vessel types) to ETA at Rothesay Dock. Advise ETA at Rothesay Dock (bridge opening time).
Have Shuttle Buses stopped running that one?Interesting development from SPT. Service 307 is now running throughout the day Monday to Saturday from the 19th
yes.Have Shuttle Buses stopped running that one?
Yep! Having been at the opening as a guest, the chatter was that the Clyde pilots want the bridge to be open *3 HOURS* before a ship passes through. That's despite emergency berths being positioned at either side of the bridge. Compare with Tower Bridge, a Grade I listed national landmark, which opens on average twice a day, and requires a warning of 30 minutes and the average time for the bridge to be closed and a ship to pass through is less than 10 minutes.Edit: having now read the aptly named 'Renfrewshire Council River Clyde Opening Bridge Scheme 2018 Confirmation Instrument 2019', the minimum notice can be as short as 2 hours. Godspeed to any operator willing to work around *that* notice period!!
Nothing seems to imply that they aren't. No registration updates or cancellations either, they seem to take forever in updating that these days too. Probably wasn't making enough money to come from Kilwinning to do it.Are they still running the other local services around there.
Rumour was spreading around a few that Shuttle weren’t making enough money to run it at a profit, was going to happen eventually.Nothing seems to imply that they aren't. No registration updates or cancellations either, they seem to take forever in updating that these days too. Probably wasn't making enough money to come from Kilwinning to do it.
Yes, they are still running the routes where they have competition, but gave up this one, which didn’t!Are they still running the other local services around there.
bit backwards!Yes, they are still running the routes where they have competition, but gave up this one, which didn’t!
McGills have stated to being interested in running one though. But that’s all I’ve heard.There isn't going to be any services going over the bridge
Having an interest doesn’t mean they’ll be rushing to create a new commercial service over it.McGills have stated to being interested in running one though. But that’s all I’ve heard.
it goes forward over the junction, and loops around the new roundaboutDoes the 26B stop outside the Renfrew Bridge?
Because it has to turn back to go back to Braehead.
There are no bus stops along there, it simply goes along to the new roundabout as it’s an easy option to turn the bus round. The first/last stops are the ones at the west end of King’s Inch Road, normally served by the 26.Does the 26B stop outside the Renfrew Bridge?
Because it has to turn back to go back to Braehead.
I'm surprised it didn't use the old Renfrew Ferry turning circle, if I'm honestThere are no bus stops along there, it simply goes along to the new roundabout as it’s an easy option to turn the bus round. The first/last stops are the ones at the west end of King’s Inch Road, normally served by the 26.
I had premises close to where the bridge is and when the initial planning application was made I'm pretty sure that the closure time was stated to be less than 90 minutes.Yep! Having been at the opening as a guest, the chatter was that the Clyde pilots want the bridge to be open *3 HOURS* before a ship passes through. That's despite emergency berths being positioned at either side of the bridge. Compare with Tower Bridge, a Grade I listed national landmark, which opens on average twice a day, and requires a warning of 30 minutes and the average time for the bridge to be closed and a ship to pass through is less than 10 minutes.
It was considered but as no buses have terminated there for a long time, it now sees far more parked cars than when it was a regular turning point.I'm surprised it didn't use the old Renfrew Ferry turning circle, if I'm honest
Same. It would help people be able to get to the bridge quicker.I'm surprised it didn't use the old Renfrew Ferry turning circle, if I'm honest