• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Could the Class 99 be used on the Caledonian Sleeper to replace the Class 92s?

Status
Not open for further replies.

Bertie the bus

Established Member
Joined
15 Aug 2014
Messages
3,216
Unless GBRf think they will be winning a lot of new work in the next few years they don’t need 30 additional locomotives. As they have stated they will be looking at using 99s on the sleepers and someone posted a link to a document showing they are also considering using them on Rylstone stone trains and biomass from Tyne Dock it isn’t a great leap of the imagination to suggest their Class 60 and 92’s days are probably numbered. They are both complex loco’s, presumably expensive to keep in traffic and have limited uses.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,376
Location
belfast
Unless GBRf think they will be winning a lot of new work in the next few years they don’t need 30 additional locomotives.
I think that winning a lot of new work might well be exactly what GBRf are planning.
The 99s are going to be phenomenally expensive to lease. Tying up six of them on two passenger workings a day each, run overnight, when there's a viable alternative that already works, seems unlikely. Switch to 99s, and either GBRf takes a hit on the profit margin for the contract, stop making a profit altogether, or CS increases their already high prices.
How would you ever need 6 99s for the sleeper?

If only using them north of Edinburgh, you would only need 3 99s
If using them for all sleeper services, you would need 10 99s
 

Bertie the bus

Established Member
Joined
15 Aug 2014
Messages
3,216
I think that winning a lot of new work might well be exactly what GBRf are planning.
Maybe you do but it doesn't mean it is going to happen, especially the type of work 60's and 92's could be used on. A project that would have guaranteed a lot of work for railfreight companies when the 99s were ordered (HS2 north of Brum) has since been cancelled and the amount of new to rail freight that ever materialises is minimal.
 

waverley47

Member
Joined
17 Apr 2015
Messages
856
I think that winning a lot of new work might well be exactly what GBRf are planning.

How would you ever need 6 99s for the sleeper?

If only using them north of Edinburgh, you would only need 3 99s
If using them for all sleeper services, you would need 10 99s

There are three based at Wembley: one for each northbound run, and an extra to take the stock into and out of Euston.

There are at least three based in Scotland: one for each of the southbound services, one that takes the Carstairs to Edinburgh portion, and I'm 99% sure there is an extra based at Polmadie.

I'm assuming using them for the south of Edinburgh services.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,376
Location
belfast
There are three based at Wembley: one for each northbound run, and an extra to take the stock into and out of Euston.

There are at least three based in Scotland: one for each of the southbound services, one that takes the Carstairs to Edinburgh portion, and I'm 99% sure there is an extra based at Polmadie.

I'm assuming using them for the south of Edinburgh services.
Why would you replace the 92s but retain the 5/6 diesel locomotives?
 

waverley47

Member
Joined
17 Apr 2015
Messages
856
Why would you replace the 92s but retain the 5/6 diesel locomotives?

Because it's a waste of a brand new, expensive bimode asset having it shuttle six coaches from Aberdeen to Edinburgh twelve times a week, especially when they invested a lot of money into a fleet of rebuilt locos to do exactly that.

If you want to replace the 92s for maintenance reasons then fair enough but there is no way that a loco that costs upwards of fifteen million a pop spends it's life north of Edinburgh, entirely running on diesel. What's the point of that?
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
I think it's likely that they'll be capable of hauling the sleeper, but initially at least it'll be very rare.
 

MontyP

Member
Joined
18 Nov 2015
Messages
539
Agreed. Can't actually use Mark 5A DTs, but order some extra Mark 5s, including DTs, split the Lowlander into two completely separate services, I believe would be cost neutral against complexity of splitting it at Carstairs and all the pilot locos moving about.


You might well be right, only future will tell what GBRf work out is most efficient
Very much doubt there is the demand to run an entire separate train for Glasgow.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,794
Location
Somewhere, not in London
The Class 92s have mountains of obsolete electronics with the expertise to maintain them very much dwindling.
The 73/9s aren’t doing much better given they’re from the same era as everyone’s favorate hybrid units (769 FLEX)

Anyone who thinks these locos are bulletproof reliable is very much well… not correct. There’s a lot to go wrong in them and a lot will be in the next 5 - 10 years as the Brush Traction workforce gets further thrown to the winds.

Given the timescales of the 99s, using them on the sleepers makes absolute perfect sense.
 
Last edited:

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,646
Location
Greater Manchester
So, in total that is 5/6 diesel locos and 7 electric locos across both services in both direction. I'd appreciate if someone with more knowledge could confirm whether I got that right!
The 08 at Inveness also helps move the sleeper around, although that's not part of the actual service.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,195
The Class 92s have mountains of obsolete electronics with the expertise to maintain them very much dwindling.
Given that this is the case, I’m very, very surprised that nobody has thought to set up a Class 92 preservation group… ;)
 

TheWierdOne

Member
Joined
30 Oct 2020
Messages
417
Location
Yorkshire
Presumably a bit of rewiring of redundant DTs would be cheaper than new build. But lack of walk through a somewhat bigger issue!
Could they not use the DTs as end carriages on the carriage consists? Avoids the walk-through issue and could make operations easier in a pinch if the train can be driven from either end.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
The problem is inefficient use of locomotives, and the DTs which already exist might go some way to providing a solution.
Though if they're only to be used for shunt moves that means they would need to be on there Euston end of the train northbound and the Glasgow end southbound, which means that portion would need turning at either end. A trip round Cathcart would do the job in Scotland, but there's no obvious place to wye a train on the Southern WCML.
 

Richard Scott

Established Member
Associate Staff
International Transport
Railtours & Preservation
Joined
13 Dec 2018
Messages
4,583
I believe class 73s use standard voltage for train supply, not 1500v. Thus are limited to a half rake.
I'd be surprised, the working supply to the coaches is 1500V, half a rake reduces the current requirement not the voltage. I know some continental coaches are able to take different supplies but though sleepers were 1500V only. Happy to be corrected

== Doublepost prevention - post automatically merged: ==

This feels a lot more like a solution looking for a problem.
Exactly and I can't see how using a DVT actually helps? Could someone please explain their rationale behind this thinking?
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,376
Location
belfast
I'd be surprised, the working supply to the coaches is 1500V, half a rake reduces the current requirement not the voltage. I know some continental coaches are able to take different supplies but though sleepers were 1500V only. Happy to be corrected
I have seen it reported that the diesel locos use 750V, and that it would not be possible to supply all 16 coaches when connecting at that voltage.

== Doublepost prevention - post automatically merged: ==


Exactly and I can't see how using a DVT actually helps? Could someone please explain their rationale behind this thinking?
Currently there is a heavy use of pilot locomotives, leading to the sleeper operation using 7 cl92s in total. If you were to use DVTs instead of the pilot loco, you would need less locomotives, though by my count you would likely only be able save about 2 92s.
 

172007

Member
Joined
2 Jan 2021
Messages
1,167
Location
West Mids
A thought.

Should a follow on order be made, especially if an ETS version is ordered, that they be designed with minature Snow Plough fittings and the ploughs.

We can't rely on the class 37's and alike for ever and if 99's were to work the Sleeper they may be able to keep a train from being stranded or at least used during the day to clear the lines up north.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,867
I have seen it reported that the diesel locos use 750V, and that it would not be possible to supply all 16 coaches when connecting at that voltage.

Currently there is a heavy use of pilot locomotives, leading to the sleeper operation using 7 cl92s in total. If you were to use DVTs instead of the pilot loco, you would need less locomotives, though by my count you would likely only be able save about 2 92s.
If you use DVTs, you lose passenger carrying vehicles on what is already a service that is an utter basket-case financially. And where are those DVTs coming from?

And it is not as simple as adding a DVT to one end of the set as you have each 8-car portion also splitting as it works round the Aberdeen/Fort William portion.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,646
Location
Greater Manchester
least used during the day to clear the lines up north.
What's the route avaliability of the Far North lines, could a 99 go up there.
I'm guessing by the 68s going up there the answer is yes.

The loco would just barely have enough time to go to Wick and back, depending on where it can pass other trains (if they're operational).
If it has to operate at a reduced speed due to the snow it wouldn't be able to go all the way.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,454
Location
Somerset
Very much doubt there is the demand to run an entire separate train for Glasgow.
No but in the summer at least there might be for two Edinburghs -one going on to Glasgow (and the other possibly even running on down to Newcastle if regularly going north via the ECML is still a no-goer)
 

TheWierdOne

Member
Joined
30 Oct 2020
Messages
417
Location
Yorkshire
What's the route avaliability of the Far North lines, could a 99 go up there.
I'm guessing by the 68s going up there the answer is yes.

The loco would just barely have enough time to go to Wick and back, depending on where it can pass other trains (if they're operational).
If it has to operate at a reduced speed due to the snow it wouldn't be able to go all the way.
Presumably you would have standby by locos that could be used on “day release”, with an understanding that they may have to be returned to Inverness before the whole line to Wick is cleared, if the rostered sleeper loco needs to be taken off service.
 
Status
Not open for further replies.

Top