There’s actually now 3tph most hours between Bristol and Westbury, whereas it was previously 2tph. Some of these continue onto Warminster/Salisbury/Frome or Weymouth. The Weymouth line has a more normalised timetable now too, having previously been an erratic mix of hourly, two-hourly or three-hourly gaps between services.
- Bristol Temple Meads to Salisbury increasing to 3tph (partly replacing irregular SWR Bristol services)
- Gloucester to Bristol increased from 1tph to 2tph
- Worcester to Bristol increased from 1tp2h to 1tph
Back when I commuted people getting the Cambridge and Lowestoft services confused was not uncommon when they were both sat on Platform 1Absolutely. If only the direct Lowestoft train still ran! Don't think we'll ever see that again, though
That makes complete sense. It's the only time I tend to travel through Ipswich so I've only witnessed the odd 15:54 departures. The only real issue I have with the 17:17 is that it always displays "Ipswich" as the destination while sitting in the platform for 40 minutes. I understand that it's not necessarily the previous driver's job to change it, but combining the awkward placement of platform 1, the awkward placement of the only information screen (all the way down the buffer end), and the long turnaround, the result is people (usually elderly people) wandering around the train trying to figure out whether it is the one they want or not!
Thankfully there's little doubling up now, though it still happens on platform 4 (possibly platform 3, can't remember). It's much easier to figure out though, as it's usually a London stopper and a Peterborough/Cambridge service going in opposite directions. Norwich doesn't get the same luxury, though.Back when I commuted that people getting the Cambridge and Lowestoft services confused was not uncommon when they were both sat on Platform 1
Hedge end and Botley will fall off the limited gwr map with the may timetable but that was always an oddity
I think this is because of the 1822 Cambridge to Cambridge North service. There's also the 1922, and the 1919 from Cambridge to Ely doesn't stop at Cambridge North either
Happened in platform 2 today too. Cambridge on 2A, Felixstowe on 2B, closely followed by my Lowestoft on 2B.Thankfully there's little doubling up now, though it still happens on platform 4 (possibly platform 3, can't remember). It's much easier to figure out though, as it's usually a London stopper and a Peterborough/Cambridge service going in opposite directions. Norwich doesn't get the same luxury, though.
I know there's the 2A arrival somewhere in the middle of the day (can't remember much more about it), but I've never seen multiple in 2.Happened in platform 2 today too. Cambridge on 2A, Felixstowe on 2B, closely followed by my Lowestoft on 2B.
Coupled 3 together on 4 the other week.
Platform 2 is often used for multiple departures on weekends especially with engineering works.I know there's the 2A arrival somewhere in the middle of the day (can't remember much more about it), but I've never seen multiple in 2.
Was the triple traction on 4 due to some kind of fault? They're normally done at Crown Point right?
Ah I see. I rarely travel on weekends due to engineering so I haven't witnessed any of this. Thank you for the insight.Platform 2 is often used for multiple departures on weekends especially with engineering works.
We are booked to take x3 to Crown Point weeknights on 5P84.
Not needed now that 3 carriages vice 1 carriage trains operate.My ideal would be half-hourly peak Felixstowe services, as well as more in summer,
Happens at weekends but not possible due to Nuclear Flask traffic to / from Sizewell and Freight to / from Felixstoweconsistent hourly Lowestoft services
Platforms cannot take this7-8 coach Cambridge and Peterborough peak services,
Yes maybe someday was in GA's bid when they won the franchise in 2016 but not exactly happened yet, covid not helped eitherhourly Peterborough of course.
No Platform changes needed for thesePeterborough, Cambridge,
Hopefully won't cost that but it may help that Freightliner seem to have vacated their sidings on that side so everything may be able to move across and hopefully reduce platform sharing at Ipswich.and Ipswich platforms would all need upgrades for this though. Could theoretically replace the carriage sidings with two more bay platforms, though I doubt we will ever see that happening unless the government stumbles upon an extra trillion pounds...
You've contradicted yourself!Platforms cannot take this
No Platform changes needed for these
Freightliner don't use the sidings at all anymore as far as I can tell, it's just used for stabling 755s (and the occasional test train). The biggest and likely most expensive part of adding a platform 5 and 6 would be upgrading the signalling. Building the new platforms themselves wouldn't be a huge cost, but I imagine extending the footbridges (mainly the lifts) would be pretty expensive, especially as there's no level crossing alternative for step-free access.Hopefully won't cost that but it may help that Freightliner seem to have vacated their sidings on that side so everything may be able to move across and hopefully reduce platform sharing at Ipswich.
Nope Peterborough and Cambridge can, as well as Stowmarket and Ely, the remaining stations can't take longer than 4 carriages so its pointless.You've contradicted yourself!
Yes that would be a cost and probably only needs one lift as an island platform but probably only the newer footbridge would be extended as I cannot see how you would extend the older footbridge given the way it is constructed.Freightliner don't use the sidings at all anymore as far as I can tell, it's just used for stabling 755s (and the occasional test train). The biggest and likely most expensive part of adding a platform 5 and 6 would be upgrading the signalling. Building the new platforms themselves wouldn't be a huge cost, but I imagine extending the footbridges (mainly the lifts) would be pretty expensive, especially as there's no level crossing alternative for step-free access.
Cambridge platform 5 can't support longer trains and it would disrupt other services if it didn't use platform 5. I've heard something similar about Peterborough, but I don't know the station layout so I can't give any more details. Stopping with front X coaches at some stations, and rear Y coaches should suffice to fix capacity at the smaller stations, though it would always be best if at least one coach is available from each unit.Nope Peterborough and Cambridge can, as well as Stowmarket and Ely, the remaining stations can't take longer than 4 carriages so its pointless.
I can also see only the newer bridge being extended. The only problem is that it would require closing the new footbridge during works, cutting off lift access.Yes that would be a cost and probably only needs one lift as an island platform but probably only the newer footbridge would be extended as I cannot see how you would extend the older footbridge given the way it is constructed.
That is correct and the crossing is still there, but I highly doubt it will ever be used outside of an emergency. I'm not even sure if it is allowed to be used in emergencies.As I recall before the lifts were built there was a foot crossing at the tunnel end of the platforms.
The hourly x39 Waterloo to Southampton semis (at times further SW) - providing the second fast service to Farnborough are still cut.
This cuts Southampton from 3 to 2tph and Farnborough from 4 to 3tph.
You can see the gaps in the peaks too. There's no Woking fast service between 1730 and 1750 which leave the 1750 very full - and a 30 minute gap in the Farnborough to Basingstoke local stations.
Post 59.Has anyone mentioned South Ruislip to West Ealing? reduced from 1 train per week to nothing at all - last ran in December 2022