Amazing how reaching an agreement with everyone involved makes for an improved service, funny that.Things are looking up.
Amazing how reaching an agreement with everyone involved makes for an improved service, funny that.Things are looking up.
Also amazing that can sign off a purchase order (final spec details, not the general principle) without an agreement to use them as built.Amazing how reaching an agreement with everyone involved makes for an improved service, funny that.
It is well documented that the mockups built and shown to the unions to agree on weren't actually what was built and delivered. It's also the quality of the build that is preventing their use as designed alongside long term infrastructure issues.Also amazing that can sign off a purchase order (final spec details, not the general principle) without an agreement to use them as built.
Hoping you can negotiate it afterwards (in this case 7.5 years after ordering).
I’ve always found this so strange. You build a mockup, send it all parties involved, they agree, and then you just… completely change the design???? Did the chief engineer just go “you know what guys I can’t be bothered to set up the new blueprints so just make the cab a smaller version of the normal one, no one will care”It is well documented that the mockups built and shown to the unions to agree on weren't actually what was built and delivered.
Looks like four today -the Dorking is a 455 on Fridays.Have all the diagrams made it out today unscathed?
I count 5,Looks like four today -the Dorking is a 455 on Fridays.
Curiously RTT had 031 running one of them when I looked at 7am, but at 10 am my Mk1 eyeball detected 043 at Kingston instead
rtt has 017 and 031 operating the evening Windsor and Shepperton diagrams, so 036 is the only "regular" having the whole day off.I count 5,
034(All day Windsor)
037 (All day Windsor)
039 (Peak Windsor diagram)
043 (All day Shepperton
046 (Peak Shepperton diagram)
Yes, this thread. Basically 10 car first, then the 5 car setsHi I forgotten is there a thread that talks about what issues on the 701/5 which isn’t coming into service? Thanks
can send me?thanksYes, this thread. Basically 10 car first, then the 5 car sets
This thread that you are reading now, I’m not going to start looking for you: but discussion about 5 cars is amongst the many pages of this threadcan send me?thanks
I just mean is there a specially one talking or it just any postThis thread that you are reading now, I’m not going to start looking for you: but discussion about 5 cars is amongst the many pages of this thread
No, there isn't a specific thread for the 701/5 issues, it's covered within this threadI just mean is there a specially one talking or it just any post
From this forum, with a quick search. The main concern with 701/5 when 3 units were being tested in April was couplings? (unless there are more problems specifically with 701/5s?)I can only see coupling being an issue for the 5car 701s. This is because normally 10car 701s will never couple to another 701 but the 5car 701s will presumably do a lot of joining and splitting.
The discussion about 5car 701s is in this thread. It crops probably in more than one place but I know the latest discussion was going on around post 12,900. Otherwise use the search facility.can send me?thanks
Well exactly. With the majority of 10 car units not yet having entered service what's the urgency with the 5 car units unless there's a sudden pressing need identified for 5-car single units? If doubled up they'd form 15 10 car units which is probably close to the reduction in current requirements compared to what the stillborn 2019 timetable would have required.The discussion about 5car 701s is in this thread. It crops probably in more than one place but I know the latest discussion was going on around post 12,900. Otherwise use the search facility.
It is one of those things that is in my memory from reading this thread thoroughly (he says !) from way back. There is probably nothing specifically wrong with the 5car 701s. But there maybe unknown peculiarities that SWR are not desperate to unearth when there are plenty of 10car 701s available and needed. The 5car 701s are perhaps best described as not needed yet in the post Covid railway.
Because i was away from home yesterday I scribbled notes from RTT on yesterday's 701 workings. One of them reads 701031-1Y14, but I can't find a 1Y14 so I wonder what it shoukld have said. Did 031 work yesterday (Saturday)?
It's probably just running it due to the bank holidayI might be going completely insane here, but is this a new diagram? 039 seems to be doing this all day.
Realtime Trains | 2O43 1530 London Waterloo to London Waterloo | 05/05/2025
Real-time train running information for 2O43 1530 departure from London Waterloo to London Waterloo on 05/05/2025. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
It's run a Kingston rounder before on bank holidaysI might be going completely insane here, but is this a new diagram? 039 seems to be doing this all day.
Realtime Trains | 2O43 1530 London Waterloo to London Waterloo | 05/05/2025
Real-time train running information for 2O43 1530 departure from London Waterloo to London Waterloo on 05/05/2025. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
Ah okIt's probably just running it due to the bank holiday
Probably once the May TT change comes into effect. They probably want a bit more resillience on the diagrams that are already running. From tomorrow there will be 6 waterloo drivers being trained, i'm unsure about the other depotsAnyone know when enough trained drivers will allow the addition of a new diagram? Can’t be long now…..
036 did so on Easter Monday.It's run a Kingston rounder before on bank holidays
69008, 7010535Q76 1618 Bicester to Willesen WL Jcn (06.05.25) for 5Q66 Willesden WL Jcn to Wimbledon Park, appears to have departed Bicester early hauled by 69006 - anyone know what is being conveyed please?