This application is for the operation of three new Open Access Service Groups that will provide new high quality passenger train services between London Euston and:
• Greater Manchester and Northwest (Preston via Manchester Victoria - 5 daily services Monday – Sundays, and Rochdale via Manchester Victoria – 2 daily services Monday to
Sundays),
• Liverpool Lime Street (9 daily services Monday to Sundays);
• Birmingham New Street (4 daily services Mondays to Sundays);
This is an amendment to the Form P application submitted to ORR on 17th May and in line with the guidance issued by ORR in their letter to the industry on 1st November 2024
During the period between May 2024 and December 2025, the Virgin team held several sessions with key Stakeholders including Network Rail. Stakeholder discussions centred around the Virgin application, operational routings, train servicing management, several commercial factors and the likely customer proposition. The output of these discussions were positive albeit two important points were raised. In response, Virgin has modified its application to reflect those suggested changes; ensuring we meet our Stakeholder and user needs. The key changes include the following:
• The reduction of train services in the London Euston to Birmingham New Street service group.
The current Operator is seeking to reintroduce some services between London and Birmingham New Street; consequently, these services once reintroduced should adequately serve the market requirements on this corridor. In summary, the reduction is from - 9 to 4 train services between Birmingham New Street and London Euston; and 7 to 4 between London Euston and Birmingham New Street.
• Reduction in the passenger train service slots in the Euston – Liverpool Lime Street Services Group.
This has reduced from 15 Passenger Train Slots to 9 in both directions.
• Modifications to the Rochdale/Preston – London Euston Service Group
This service group has been amended to serve Manchester Victoria instead of Manchester Piccadilly. The services will now traverse the section between Stockport (Heaton Norris Jn) and Miles Platting Junction (via Reddish South) and call at Manchester Victoria (both directions). This option moves the services away from the congested Manchester Piccadilly station area. This change was notified to all parties in Virgin’s response to industry and stakeholder representations following it’s initial consultation, copies of which were issued to ORR on 23rd August 2024 by Network Rail.
• London Euston – Glasgow
As this present time, further analysis and detailed planning is needed on the Glasgow service proposition; therefore, this service group has be withdrawn.
These train services are in direct response to the strong Stakeholder and Customer aspirations for quality and dependable train services on the West Coast Mainline (WCML); providing customers with choice, improved service frequencies and new direct connectivity.
This proposal seeks to support the Governments ‘Levelling Up’ initiative through providing new rail connectivity opportunities from several key locations in the North-West to London. These new locations include linking Bolton, Rochdale and the TfGM operated Park and Ride Station at Horwich directly to London.
Proposed commencement date: December 2025
End date: December 2035
Date approval or directions wanted by: Earliest Opportunity