Probably not, the jump happened post covid and their wasnt some big jump in SUV sales in 2020(and the numbers are going up as a result of heavier vehicles
Probably not, the jump happened post covid and their wasnt some big jump in SUV sales in 2020(and the numbers are going up as a result of heavier vehicles
There is also the argument that if a corridor is filled with traffic on an overloaded A-road, construction of a faster, safer motorway would not have serious environmental detriment.It's not overly clear what that is being compared for roads unlike the rail examples. and the author points out there are plenty of UK projects that are significantly more expensive e.g Newark Northern Bypass, LTC etc
This report suggests that the cost of road projets is closer to double the European average.
LTC clearly rivals the likes of HS2 and Crossrail for cost per km particularly when road schemes should be cheaper than highspeed and underground rail.
I'd be happy to support roads if there were plans to reduce road space elsewhere. For example i'd support bypass upgrades around York if it meant the city centre was made more bus and active travel friendly. There's not much joined up thinking though and it's not clear that building the LTC isn't just going to lead to other areas becoming even more congested and households buying more and more cars without space to store them.
There is also the argument that if a corridor is filled with traffic on an overloaded A-road, construction of a faster, safer motorway would not have serious environmental detriment.
In what way? The embedded carbon and environmental damage to the locality would be a serious environmental detriment.There is also the argument that if a corridor is filled with traffic on an overloaded A-road, construction of a faster, safer motorway would not have serious environmental detriment.
This never happened when the A21 was doubledIn the short term, until traffic volumes increase.
This never happened when the A21 was doubled
But is that more journeys actually being made, or more traffic on that route that relieves other routes and the total journeys hasn't changed much?It depends on if there's other limitations, for example the A303 hasn't seen significant growth west of Stonehenge, however if there were improvements at Stonehenge then it would almost certainly see significant growth.
Looking at the traffic surveys the A21 for Tonbridge to Pembury in 2013 the traffic on the A21 was 35,767 a "day" the dueling opened in 2017 by 2018 traffic had grown to 46,515 a "day" that's an increase of 30% (an increase of 10,000 ish vehicles) - so most definitely there's an increase in traffic.
Data (note I've used years which are actual surveys and not estimates) from here:
Count point 36259 - Road traffic statistics
roadtraffic.dft.gov.uk
You would have needed a lot of congestion to offset 10,000 vehicles per day.
A bit of both, I'd expect. There'll be local rerouting as people from the A26 try and avoid the horrendous traffic Tunbridge Wells and Southborough was known for although the route from the A26 to Pembury is either back lanes or the town centre (this will settle back down a bit as the traffic distributes with dynamic routing on satnavs), there'll be strategic routing from the A22 (Uckfield/Eastbourne/Hailsham) as people are now able to avoid having to go up to the M25 and along if they're heading for Dartford/SE London/Kent. And there'll be a bit of local rerouting between Tonbridge and Tunbridge Wells as people can now avoid Southborough.But is that more journeys actually being made, or more traffic on that route that relieves other routes and the total journeys hasn't changed much?
Have you ever been on the M25 on the west side of London?!Why would they want to want to use a Lower Thames Crossing for road transport when they can use the M25 on the West side of London?
Yes many times and it is congested but I got through eventually.Have you ever been on the M25 on the west side of London?!
Apart from the fact that the whole of the section from the M40 to the A3 is pretty notorious for congestion, it is both longer and normally slower than going via Dartford even from Birmingham, let alone from the East Midlands.
But is that more journeys actually being made, or more traffic on that route that relieves other routes and the total journeys hasn't changed much?
Is it, where have you read this? I understand the principle, but it’s so overwhelmed by an opposite, unnecessary use of cars for short journeys, that we hear so little about it.Regarding congestion, yes it will fill up, but it will fill up with useful journeys someone thought it worth while to make which aren't currently being made. This is generally held to be a good thing
That gets into an argument about what constitutes an 'unnecessary' use of a car.Is it, where have you read this? I understand the principle, but it’s so overwhelmed by an opposite, unnecessary use of cars for short journeys, that we hear so little about it.
Isn’t the M25 in general a fudging together of the two ringways?Is this new link effectively serving as the unplanned middle section of what could have been the eastern quadrant of ringway 4? Ringways 3 & 4 merged on their eastern quadrants to create a bottleneck at the Dartford crossing, where planners apparently though merging two motorways into one would be handled by reducing the speed to increase capacity...and we all know how well that worked out.
I mainly ponder as the M26 is the short residual eastern stub of the original ringway 4 plans, and I wonder if, in time, linking it up to the new crossing would make sense to give a motorway route throughout.
Isn’t the M25 in general a fudging together of the two ringways?
Does motorway status matter? There’s already the A228 and A229 which get you between the M20 and M2, which you could use if you wanted to avoid Dartford when the new crossing is built.
You don't have to do that for new motorways either, only if you upgrade an existing road - the right of way has to be maintainedIn road design you can have "near motorway" designs, which provide nearly all the benefits of a motorway but you don't have the down sides of needing an alternative route for traffic which can't use motorways.
That gets into an argument about what constitutes an 'unnecessary' use of a car.
Personally, I feel the whole argument is tied up in fundamental discussions of the nature of society.
Yes, in the north, R4 was considered too far from London so wouldn't be justified, and in the south, R3 was too slow to be built, leading to the alignment being lost under the post-war urban sprawl. The M25 thus gained a short section linking R3 & R4 between Sevenoaks and Swanley, with the remaining eastern stub being dubbed the M26.Isn’t the M25 in general a fudging together of the two ringways?
I think it does if you're going to pump loads more traffic down it. In the south, yes, you can use the A228 and the M20 to get you between the M26 and the new link (or upgrade the A2 and really overload that added link section of the M25 south of Dartford), but I suspect in time the M26 could get extended to meet the M2/A2 junction by paralleling the M20 for a short distance then skirting the outskirts of the built up area along the A228. Depends how overloaded it all gets, I guess.Does motorway status matter? There’s already the A228 and A229 which get you between the M20 and M2, which you could use if you wanted to avoid Dartford when the new crossing is built.
The northeastern section of the M25 between the M11 and A13 always seem pretty resilient to me, it was comprehensively upgraded to D4M (with hard shoulders) and flows well. The issues tend to be with the terrible A12 interchange (now being upgraded) and of of course the Dartford crossing.Yes, in the north, R4 was considered too far from London so wouldn't be justified, and in the south, R3 was too slow to be built, leading to the alignment being lost under the post-war urban sprawl. The M25 thus gained a short section linking R3 & R4 between Sevenoaks and Swanley, with the remaining eastern stub being dubbed the M26.
The new LTC appears to be rejoining the M25 in the north around Upminster. My concern is overloading that northeastern section of the M25 further. I haven't travelled it for several years, but it was always very busy when I did. It's an interesting curiosity to me that the spot where it rejoins the M25 is not too far from where R4 would have joined R3 near Brentwood.
As can be seen here.
So let's pick one of those:Automotive emissions are hugely significant outside of the exhaust emissions. Particulate emissions are getting worse as a result of heavier and electric cars and road run off is something the UK doesn't even bother to monitor. Thousands of people per year are killed or seriously injured (and the numbers are going up as a result of heavier vehicles). That's why car traffic needs to be reduced. Hopefully to zero in urban areas where public and active transport is the most efficient solution and to mainly essential journeys in rural areas. More roads destroy human scale towns and cities and encourage urban sprawl. Electrification of road transport is the latest wheeze of the the motor industry not a sustainable way to plan transport.
![]()
Toxic run-off from roads not monitored, BBC finds
River flowing past the famous white 'Bake Off' tent is among those polluted by chemicals and tyre particles.www.bbc.co.uk

A vehicle-pedestrian contact at 22mph transfers the same energy regardless of vehicle mass? That surprises me. Or does the speed they are accelerated to not usefully measure the impact?A 75kg person is hit by a 1200kg car or a 2000kg car doing 10m/s we can approximate the resultant velocity of the combined car/vehicle mass as the amount of KE transferred to the pedestrian. In first collision the person is accelerated to 9.41m/s in the second they are accelerated to 9.6m/s.
The premise of this thread and those talking points are based around a position of not liking cars and wanting to get rid of them. Ultimately that position won't work and will be counter productive.
when I started this thread, I was under the impression that this crossing would be further to the East, maybe connecting with the A130. That is why I’d be so opposed to it as it would make it so much easier to drive between centres such as Southend, Basildon, Chelmsford, Colchester etc to places in Kent such as Medway, Maidstone, Thanet, Canterbury etc. Which would destroy rail’s ability to compete. Now I know it is much further to the west and is essentially intended to make local journeys easier, it does make sense as it could potentially take a lot of local cross Thames traffic off the existing Dartford Crossing freeing up capacity for traffic undertaking longer distance journeys.
Having said that, I probably would prefer it to be rail. Or joint road & rail. At the risk of being accused of descending into crayon related fantasy, it could make sense as some local light railway for the area.
Or as an addition to the national railway system, linking the LTS line with the lines in Kent, creating potential for services such as say, a Shoeburness to Ramsgate service via Southend, Pitsea and Medway. Or Southend to Tonbridge via Maidstone West. Or even Southend to Brighton via Ebbsfleet, Ashford and Hastings. As not everyone wishes to go to London. And direct trains between these places would create an attractive alternative to driving. I’ll go and put my crayons away now.

I remember there was huge opposition to the M25 being built down the Darenth Valley to the South of the Dartford crossing.Yes, in the north, R4 was considered too far from London so wouldn't be justified, and in the south, R3 was too slow to be built, leading to the alignment being lost under the post-war urban sprawl. The M25 thus gained a short section linking R3 & R4 between Sevenoaks and Swanley, with the remaining eastern stub being dubbed the M26.
That is just the UK finding more and more use for an existing motorway and widening it later - or not.The new LTC appears to be rejoining the M25 in the north around Upminster. My concern is overloading that northeastern section of the M25 further. I haven't travelled it for several years, but it was always very busy when I did. It's an interesting curiosity to me that the spot where it rejoins the M25 is not too far from where R4 would have joined R3 near Brentwood.
As can be seen here.
I do not see the point in improving a link from South M25 to the new crossing.I think it does if you're going to pump loads more traffic down it. In the south, yes, you can use the A228 and the M20 to get you between the M26 and the new link (or upgrade the A2 and really overload that added link section of the M25 south of Dartford), but I suspect in time the M26 could get extended to meet the M2/A2 junction by paralleling the M20 for a short distance then skirting the outskirts of the built up area along the A228. Depends how overloaded it all gets, I guess.
Not really if people are forced into using their cars due to unreliable bus service caused by congestion from cars which shall undoubtedly happen with this and the dartford crossing.Carbon emissions will be reduced by electric vehicles/alternative fuels. Frustrated and delayed drivers cause accidents, so reducing congestion will hopefully reduce that. Pollution and noise will also be alleviated by reducing congestion.
I cannot understand why so many people seem to have this rail (and other public transport) vs. car mentality. They are complementary, not antagonistic. They are both useful. Most rail users drive.
Isn’t the point being made that any vehicle is so many times heavier than the pedestrian that a modest increase in vehicle weight will have less practical difference than (say) front end design?A vehicle-pedestrian contact at 22mph transfers the same energy regardless of vehicle mass? That surprises me. Or does the speed they are accelerated to not usefully measure the impact?
I don't want to derail this thread any further but do you have any evidence to back this claim up? The material requirements of EVs are orders of magnitude less ruinous than fossil fuel extraction. https://theicct.org/clearing-the-air-plenty-of-materials-for-evs-oct24/First point - not if everyone is trying to transition at the same time (which they are) and extracting the whole of the earth and ruining the world for humans and nature due to a severe lack of foresight and ambition.
I don’t dispute that, yes I do with regards to the sources.I don't want to derail this thread any further but do you have any evidence to back this claim up? The material requirements of EVs are orders of magnitude less ruinous than fossil fuel extraction. https://theicct.org/clearing-the-air-plenty-of-materials-for-evs-oct24/