• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Rail Freight Flows and News UK

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ploughman

Established Member
Joined
15 Jan 2010
Messages
3,103
Location
Near where the 3 ridings meet
That's a good picture of the loading process, stepladder included! Seeing it more clearly in that photo reveals there are two magnets suspended from a lifting beam, which probably has the battery pack built into it.

A bit of googling reveals these are known as "electromagnetic spreader beams" and the company providing the one used at Portbury is Magbat Europe. There's a 'case study' on their website with some close-up photos of the spreader beam with the magnets: https://www.magbat-europe.com/achie...ery-powered-electro-permanent-lifting-magnet/

I think this was mentioned already, but the KEAs now sport cut out squares in the sides and various white line markings, plus a yellow marking on the central strengthening rib on the side of the wagon. I think all this must be to help the loader centre the slabs within the wagon - from the GBRF shot it appears the cab of the reach stacker is not high enough to give a clear view down into the wagon.

VTG 3211 in the consist of 6C92 empties to Portbury:
https://www.flickr.com/photos/chrisperkins/54363892060/ (Photo: Chris Perkins)

Dramatic image of 6B92 Portbury - Margam in the Avon Gorge under Clifton Suspension Bridge:
https://www.flickr.com/photos/robmcrorie/54369559499/ (Photo: robmcrorie)
May be a silly question, but what happens to the slab in the event of a power cut mid lift?
 

Adrian Barr

Member
Joined
2 Jul 2020
Messages
788
Location
Doncaster
May be a silly question, but what happens to the slab in the event of a power cut mid lift?

They are advertised as "permanent" magnets (there's a more scientific explanation on the website) which only require power to turn the magnet on or off. So you could have a slab stuck to the magnet if the batteries failed but it wouldn't fall off!

  • Permanent magnets ensure a secure grip, even in case of power loss

MAGBAT-Electro Permanent Magnets (EPM) offer 95% energy savings
and superior safety compared to traditional electromagnets
.

They require power only during MAG and DEMAG phases, operating without power supply.
 

Tinsley 1976

On Moderation
Joined
3 Mar 2025
Messages
17
Location
Cardiff
I've been told gbrf av ad contract cancelled and dB will b taking it back over from 2day 66786 has already taken its wagons to tidal for storage this morning is there any truth in this anybody know
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,579
Location
Northampton
All the steel trains in Bristol and Cardiff recently have had DB locos on the front, so when did GBRf take over the contract?
 

Tinsley 1976

On Moderation
Joined
3 Mar 2025
Messages
17
Location
Cardiff
It finally happened! A dramatic view of the gorge, I like it.

After previous discussion of loading methods at Portbury (posts #1646 to #1648), I found this photo of the loading pad: https://www.flickr.com/photos/74165767@N05/53885536660/ (Photo: Driver 59)

In the background (zoom in) are a couple of heavy duty forklifts - too far away to make out attachments, but they must be using magnets to drop the slabs into KEAs; plus you couldn't stack slabs right on top of each other (which they do on a wagon) if you had to pull the fork lift tines out from between them.
I've been informed that gbrf have ad contract terminated and dB taking it back over from 2day ...66786 has already taking wagons to tidal cdf for storage this morning I ope this is not true anybody know ?
 

JKF

Established Member
Joined
29 May 2019
Messages
1,310
GBRF started Monday last week, with Biffa 66783 working all that week, it’s been 66786 so far this week - GBRF seem to be keeping the same loco on whereas DB seemed to change it daily most weeks and sometimes run two trains a day. 66786 also ran last Saturday scheduled from Margam-Portbury but went into East Depot then disappeared off Traksy, and the loco was working elsewhere on Monday so don’t know what happened there.

Picture below of a loaded KEA passing the end of the single line section signal at Ashton, some had two slabs loaded, others three, of varying width.

IMG_0455.jpeg

== Doublepost prevention - post automatically merged: ==

I've been told gbrf av ad contract cancelled and dB will b taking it back over from 2day 66786 has already taken its wagons to tidal for storage this morning is there any truth in this anybody know
There is a DB train running to Portbury today (6Z55 headed by frequent flyer on the line 66651) so perhaps some truth in this. I wonder what the issue could be?
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,471
I've been told gbrf av ad contract cancelled and dB will b taking it back over from 2day 66786 has already taken its wagons to tidal for storage this morning is there any truth in this anybody know
Partially true - the wagons are heading to Cardiff Docks to enable urgent repairs/maintenance to take place.


I wonder what the issue could be?
A couple of my subscribers in the Bristol area said that towards the end of the first week of operation,
many of the GB wagons could be seen to be visibly 'bent' in the middle, so presumably some sort of
strengthening will have to be added while they are at Cardiff?



MARK
 

JKF

Established Member
Joined
29 May 2019
Messages
1,310
A couple of my subscribers in the Bristol area said that towards the end of the first week of operation, many of the GB wagons could be seen to be visibly 'bent' in the middle, so presumably some sort of strengthening will have to be added while they are at Cardiff?

MARK
I checked my video from Tuesday and a couple of wagons might be showing signs of distortion, though not sure. Perhaps notable that there were only 12 in the rake whereas I think 19 were out the first day the service ran.
 
Joined
3 Mar 2020
Messages
673
Location
Furness
Read on Facebook that GBRF are due to start a new flow to Workington - not sure what of. Route learners running today: https://www.realtimetrains.co.uk/service/gb-nr:R59859/2025-03-13/detailed
There was something similar going on a couple of weeks ago. The route learner came south to Barrow ( I think from Carlisle) sat in the station for a while around 1400 waiting for the Lancaster to Carlisle all stations passing through and then returned north. It was GBRF I recall.
 

Adrian Barr

Member
Joined
2 Jul 2020
Messages
788
Location
Doncaster
66786 also ran last Saturday scheduled from Margam-Portbury but went into East Depot then disappeared off Traksy, and the loco was working elsewhere on Monday so don’t know what happened there.

That was a light engine move using the Portbury 6C92 path, running as 0C92 and then cancelled off at Bristol. The next GBRF slab working started up as 6Z92 from Margam to Portbury on Monday 10th, returning loaded as the usual 6B92.

A couple of my subscribers in the Bristol area said that towards the end of the first week of operation,
many of the GB wagons could be seen to be visibly 'bent' in the middle, so presumably some sort of
strengthening will have to be added while they are at Cardiff?

I think the slabs put a lot of stress on the frames as the load is not evenly distributed, and the weight is in the centre of the wagon rather than over the bogies. I think it was problems with the frames that led to a lot of the older BAA / BBA types being withdrawn (although there are the 60 BAAs being delivered from Stoke with new frames from Poland).

This photo of the venerable BTAs used on slab traffic has the comment "note the sagging" (particularly if you look at the wagons closer to the loco) - https://www.ltsv.com/rd/photo_view.php?id=9172

I'm not sure what kind of work other than light repairs could realistically be done to the wagons at Cardiff, unless they are going to take them back to Shirebrook for modification? Steel wagons are maintained at Tidal, but the facilities are basic "outstation repair" facilities from what I can tell - I think repairs (and wagon scrapping) are done in the area at the top left of this drone shot:
https://www.flickr.com/photos/andy_hoare/54013240049/ (Photo: Andy Hoare)

I've been informed that gbrf have ad contract terminated and dB taking it back over from 2day ...66786 has already taking wagons to tidal cdf for storage this morning I ope this is not true anybody know ?

I don't know anything about the contract (or the wagon issues for that matter) other than what I've read here, but there are schedules uploaded for DB to run 6Z55 / 6Z53 again tomorrow (Friday 14th):
https://www.realtimetrains.co.uk/se...4/0000-2359?stp=WVS&show=all&order=wtt&toc=ZZ
 

JKF

Established Member
Joined
29 May 2019
Messages
1,310
I don't know anything about the contract (or the wagon issues for that matter) other than what I've read here, but there are schedules uploaded for DB to run 6Z55 / 6Z53 again tomorrow (Friday 14th):
https://www.realtimetrains.co.uk/se...4/0000-2359?stp=WVS&show=all&order=wtt&toc=ZZ
This did run - and brought us a new HTE 66 to the line - 66659. Noted that it was running using the DB paths today (outbound working departing lunchtime) rather than yesterday which seemed to be working more to GBRF’s schedule of a mid-morning arrival and late afternoon departure. The bonus being that I could pop down the hill to see it in my lunch break!

IMG_0495.jpeg
(Picture shows DB red 66659 working in the Avon Gorge taken from boundary fence approaching Clifton Bridge Tunnel No.1, which is behind the camera)
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,153
Location
North London or Mildmay line
Seems that DRS are using Class 88 engines on both Tilbury/Daventry diagrams today, rather than previously when they worked 4M77/4L48 but with 66s still in charge of 4M07/4L27. Fantastic news if this stays this way longer term. DRS are making much better use of the 88s now, with Daventry to Trafford Park, Tilbury and Coatbridge being the services they are using them on now!
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,471

Rhinojerry

Member
Joined
2 Oct 2019
Messages
180
Location
Bamber Bridge

== Doublepost prevention - post automatically merged: ==

Apologies.previous post shows today's arrival at Weaste with the backdrop of the Imperial War Museum quite appropriately 66623 Lest We Forget has brought 16 JGA's up from Tunstead
It is booked again for tomorrow 24/03..out of interest what is in the wagons please.Thanks
 
Joined
19 Nov 2015
Messages
44
It is booked again for tomorrow 24/03..out of interest what is in the wagons please.Thanks
Cement....seems that there is a problem with the Centenary Bridge over the Ship Canal preventing the usual ships coming in from Ireland...until that is resolved the trains will probably continue to bring the cement in for distribution by road..usual load is 18 JGA's..4 trains have run so far.
 

Rhinojerry

Member
Joined
2 Oct 2019
Messages
180
Location
Bamber Bridge
Cement....seems that there is a problem with the Centenary Bridge over the Ship Canal preventing the usual ships coming in from Ireland...until that is resolved the trains will probably continue to bring the cement in for distribution by road..usual load is 18 JGA's..4 trains have run so far.
Thats great,thank you.
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,153
Location
North London or Mildmay line

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,471
Evidently the Maersk switch is starting to make an impact.
One of my subscribers visited Rainham (on the LTS) last Friday afternoon and saw
seven intermodal workings, most of which were running to/from London Gateway,
plus the West Thurrock cement empties in just under 70 minutes. o_O

And the line is expected to get even busier next month as yet more trains transfer
from Felixstowe to Gateway - the Thames Haven branch needs electrifying ASAP!




MARK
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,153
Location
North London or Mildmay line
One of my subscribers visited Rainham (on the LTS) last Friday afternoon and saw
seven intermodal workings, most of which were running to/from London Gateway,
plus the West Thurrock cement empties in just under 70 minutes. o_O
Wow - you do sometimes get that kind of traffic at Upper Holloway, but that is generally augmented by Dagenham Ford trains, the oddball 4M88 from Felixstowe and stone trains. Seven intermodals to/from Tilbury/Thames Haven in 70 minutes is incredible!
And the line is expected to get even busier next month as yet more trains transfer
from Felixstowe to Gateway - the Thames Haven branch needs electrifying ASAP!
Well I agree, but whether it ever gets done is another question!
 

DBS92042

Established Member
Joined
13 Apr 2019
Messages
1,798
It's the 'bent' KEA wagons that were used by GBRf for a week or so recently as part of
their ill fated attempt to take over the Portbury to Margam steel from DBS.



MARK
All 25 of the KEAs that were in South Wales have been moved to Exeter Riverside by 66772 today
 

Top