There's a difference between finding a path for a day/few days (where you can run in an unused path or cancel something else) and making a permanent slot in the timetable.And when Avanti divert, there's room for those diversions too.
There's a difference between finding a path for a day/few days (where you can run in an unused path or cancel something else) and making a permanent slot in the timetable.And when Avanti divert, there's room for those diversions too.
Like I said, will the new configuration add more "slots"? If not, then what's the point? If so, then can we have a direct service, even if it's only one or two per day?There's a difference between finding a path for a day/few days (where you can run in an unused path or cancel something else) and making a permanent slot in the timetable.
It's supposed to allow two more trains per hour so yes, I would expect that it would be possible to add services that call at both Bolton and London.Like I said, will the new configuration add more "slots"? If not, then what's the point? If so, then can we have a direct service, even if it's only one or two per day?
No one is going to accept dumping an 11 car Pendo out on 13/14 at Picc for a Bolton extension.It's a speculation thread! Yes they could, finding space and stock is another matter! But if Transpennine Express can run through trains from the Airport to Glasgow and Edinburgh via Bolton, then it's a question as to why not London? And when Avanti divert, there's room for those diversions too. As for removing trains, the new configuration in the next few years at Oxford Road should allow more to pass through - if not then isn't that a total waste of time and money?
I suppose I should just be grateful we can get to the airport direct.
Nine car??!No one is going to accept dumping an 11 car Pendo out on 13/14 at Picc for a Bolton extension.
Not even a 9 car. Ordsall sends 1tph to/from Castlefield. If that was removed the gap would put you behind the Blackpool North train which has called at Bolton. The other way creates a gap that is infront of the train back to Blackpool.Nine car??!
Be nice, speculatively, if "we'll make it work" trumped "it can't be done"! I just wonder if that Ordsall Chord hadn't been built whether Bolton/Chorley would have a far better service through to Piccadilly and all points south, as there would be more space on that darned corridor?
Split tickets, as you describe, are eligible for delay repay due to missed connections from the operator that caused the delayI think part of the connection problem is our fragmented operator and ticketing systems. I live in Newton-le-Willows and fairly regularly travel to London for work. This usually involves a change at Warrington Bank Quay (I have also used Manchester previously in disruption and could feasibly use Liverpool too). Because of the way ticketing is, I nearly always book advance fares on the Warrington<->Euston legs and buy a separate ticket for the Newton-le-Willows<->Warrington leg as this is more cost-effective. This ticket 'split' does mean I lose the ability to claim for missed connections which becomes a problem northbound, especially with Avanti's questionable punctuality. I have often arrived a few minutes after my connecting train has left faced with either waiting nearly an hour for the next one or hopping in a cab for the 15-minute journey home. Southbound I tend to give myself far more time to change than the journey planner does as it is also not unheard of for the Newton->Warrington services to be late or canceled as well.
Interestingly the Lumo open access Rochdale->Euston proposal does include a stop at Newton-le-Willows giving a direct service and I think it would be fairly well patroned.
Could they?
Which existing services through Castlefield would you remove to enable this, and where would you get the Rolling stock from?
In the spirit of speculation:It's a speculation thread! Yes they could, finding space and stock is another matter! But if Transpennine Express can run through trains from the Airport to Glasgow and Edinburgh via Bolton, then it's a question as to why not London? And when Avanti divert, there's room for those diversions too. As for removing trains, the new configuration in the next few years at Oxford Road should allow more to pass through - if not then isn't that a total waste of time and money?
I suppose I should just be grateful we can get to the airport direct.
The risk of missing a connection because your first train is delayed is a big factor. Round here, few trains run better than hourly and some are not even that (especially if you are travelling to a smaller station), so missing a connection can mean a long wait, potentially at a station without a lot of facilities, and a long delay in getting where you are going. Which if you are heading home, or going somewhere for an unspecified time, can be annoying, but if you need to be somewhere at a particular time it can be a lot worse than a wasted hour.A lot of people I know get very stressed about connections.
Personally, the number of connections is of very little concern to me when I plan a journey, but then again I do travel a lot in the South East where the impact of missing a connection tends to be less pronounced than it might be in much of the rest of the country as the frequencies are better.
The risk of missing a connection because your first train is delayed is a big factor. Round here, few trains run better than hourly and some are not even that (especially if you are travelling to a smaller station), so missing a connection can mean a long wait, potentially at a station without a lot of facilities, and a long delay in getting where you are going. Which if you are heading home, or going somewhere for an unspecified time, can be annoying, but if you need to be somewhere at a particular time it can be a lot worse than a wasted hour.
There's also extra hassle, especially if you are travelling with children and/or luggage, and if trains are busy then finding a seat and/or luggage space in each train can be an issue that people want to minimise, and people can be worried about getting lost at large stations and getting on the wrong train or not being able to find the right platform – for people who are infrequent travellers or who maybe have lower mobility those can be more serious problems.
So, instead of (made up numbers) one train per hour with 200 people running at a loss of £3K per train you have three trains carrying 66 each making a loss of £4K each.As I've said before, no one thinks twice about changing trains on the tube as the frequencies are so high.
If we're making up numbers, why not assume if the service were frequent enough to be usable, more people would use it?So, instead of (made up numbers) one train per hour with 200 people running at a loss of £3K per train you have three trains carrying 66 each making a loss of £4K each.
Yes, of course there's an always a certain amount of supply induced demand but that only goes so far. I doubt there are many places in the UK where there's enough supressed demand to go from an hourly service that isn't full to a 3tph service that is.If we're making up numbers, why not assume if the service were frequent enough to be usable, more people would use it?
So, instead of (made up numbers) one train per hour with 200 people running at a loss of £3K per train you have three trains carrying 66 each making a loss of £4K each.
No. But the direct cost to the TOC of operating two services is going to be at least twice that of one service. Likely more if the increased service means that additional units are required due to lack of turnaround time.Anyway, a lot of the costs (I know some will) of a railway line (infrastructure) aren't going to double because the frequency of trains using the line doubles.
For example, the cost of the monitoring of the lines (for example visual inspections) isn't going to change that much. Nor is the cost of the signaler.
It is very unlikely that doubling the frequency will cost more than double to run in terms of operational costs (although when you reach the limits of current infrastructure, there may well be increased costs to go further). If you currently need 4 trains to operate a service at 1tph then you will not need more than 8 trains to operate it at 2tph, and there are likely to be some routes where you would not even need as many as double, if you were able to reduce dead time at the terminus.No. But the direct cost to the TOC of operating two services is going to be at least twice that of one service. Likely more if the increased service means that additional units are required due to lack of turnaround time.
It's entirely possible for costs to more than double. In most cases train diagrams aren't a simple back and forth shuttle so it's not as simple as "four trains become eight", but rather they interact so 'stealing' a train to strengthen one service either means someone else loses out or more trains and drivers are needed - so four is more likely to become nine or ten. That's not to mention that staffing costs may more than double due to rest requirements.It is very unlikely that doubling the frequency will cost more than double to run in terms of operational costs (although when you reach the limits of current infrastructure, there may well be increased costs to go further). If you currently need 4 trains to operate a service at 1tph then you will not need more than 8 trains to operate it at 2tph, and there are likely to be some routes where you would not even need as many as double, if you were able to reduce dead time at the terminus.
That's possible but relatively unlikely.It's entirely possible for costs to more than double. In most cases train diagrams aren't a simple back and forth shuttle so it's not as simple as "four trains become eight", but rather they interact so 'stealing' a train to strengthen one service either means someone else loses out or more trains and drivers are needed - so four is more likely to become nine or ten. That's not to mention that staffing costs may more than double due to rest requirements.
Renember Operation Princess where no one seemed to have thought that running half-length trains twice as often would soon result in horrendous overcrowding?So, instead of (made up numbers) one train per hour with 200 people running at a loss of £3K per train you have three trains carrying 66 each making a loss of £4K each.
That depends entirely on if the TOC is [scheduling to maximise resource utilisation][sweating the assets]* or not, but I'd be amazed if doubling or tripling service provision isn't going to increase costs by *at least* two or three times and result in a loss at least in the short/medium term.That's possible but relatively unlikely.
Your maths doesn't math.It's entirely possible for costs to more than double. In most cases train diagrams aren't a simple back and forth shuttle so it's not as simple as "four trains become eight", but rather they interact so 'stealing' a train to strengthen one service either means someone else loses out or more trains and drivers are needed - so four is more likely to become nine or ten. That's not to mention that staffing costs may more than double due to rest requirements.
Welcome to TOCs that barely have enough trains to provide the service that they do while being able to cover maintenance requirements. Do you think that most TOCs aren't already operating as efficiently as they can?You would have to have a very complex arrangement of workings, and selectively upgrade only some of the frequencies, for that to happen, and the chances that across the network you wouldn't be able to rejig things to make the service more efficient rather than less is bonkers
There are plenty of examples of services that have long layovers because the running time for a round trip doesn't divide neatly into hours, as in the examples I gave. In most or all of those cases, it would be difficult to make more efficient use of vehicles without having an uneven timetable or messing things up elsewhere.Welcome to TOCs that barely have enough trains to provide the service that they do while being able to cover maintenance requirements. Do you think that most TOCs aren't already operating as efficiently as they can?
At most TOCs, having more than one or two units out of service unexpectedly results in short-forms or cancelled services across their network.
It's not just vehicles you need to consider, it's also crew. Those long layovers are also useful for crew rest breaks, so while there might be a train sitting idle there won't be crew available to operate it.There are plenty of examples of services that have long layovers because the running time for a round trip doesn't divide neatly into hours, as in the examples I gave. In most or all of those cases, it would be difficult to make more efficient use of vehicles without having an uneven timetable or messing things up elsewhere.
Sure, but (a) crew are cheaper than vehicles, and (ii) even if the crew need their breaks then, it still doesn't make sense for doubling of service to require more than doubling of resources. It should be more efficient to keep vehicles in service as much as possible and have crew swap between them instead of having vehicles sitting idle for long periods of time ... they don't need a PNB between journeys!It's not just vehicles you need to consider, it's also crew. Those long layovers are also useful for crew rest breaks, so while there might be a train sitting idle there won't be crew available to operate it.
If there's anything that the last couple of years has taught is it is that both physical and human assets are scheduled to within an inch of what is mechanically, legally and contractually allowable at many TOCs.
Absolutely correct. It would take an unusual set of circumstances to more than double the requirements.Sure, but (a) crew are cheaper than vehicles, and (ii) even if the crew need their breaks then, it still doesn't make sense for doubling of service to require more than doubling of resources. It should be more efficient to keep vehicles in service as much as possible and have crew swap between them instead of having vehicles sitting idle for long periods of time ... they don't need a PNB between journeys!