North Downs Line upgarde works - some questions

Status
Not open for further replies.

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
They have now finished the two week closure of the North Downs Line between Guikdford and Reigate.

I have read that there will be less closures requires in future, as it will be more reliable. That is to be welcomed. This will be once all the level crossings go live in October, of course, as they will need closures to finish those.

Network Rail warned that further weekend closures will be required to fully install the crossings, which will be operational in October 2025

I was wondering, have any of the signals been moved as part of the works and have any additional signals been added or are such things not required?

Has any of the communications infrastructure been improved?

Finally are there more timing points compared to before. This could aid departure and arrival screens to see where trains are.

I am aware of the bridge works and the works near Gomshall.

As an aside, the 16:21 Reading to Gatwick Airport was 7 minutes late by the time it got to Redhill. This caused it to miss its platform slot at Redhill as a Tonbridge train had to arrive first onto platform 1A or it would be in the way of our departure from platform 1B. We should have departed before the Tonbridge train arrived. As we didn't, that was able to arrive a minute early.

So the train departed Redhill 10 minutes late, which caused the 17:52 to Reigate to be delayed and the 17:57 to Gatwick Airport to be delayed.

I don't know if these delays were infrastructure related and/or passenger. If it was infrastructure, hopefully by later in the year, things will have improved.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,861
As an aside, the 16:21 Reading to Gatwick Airport was 7 minutes late by the time it got to Redhill. This caused it to miss its platform slot at Redhill as a Tonbridge train had to arrive first onto platform 1A or it would be in the way of our departure from platform 1B. We should have departed before the Tonbridge train arrived. As we didn't, that was able to arrive a minute early.

So the train departed Redhill 10 minutes late, which caused the 17:52 to Reigate to be delayed and the 17:57 to Gatwick Airport to be delayed.

I don't know if these delays were infrastructure related and/or passenger. If it was infrastructure, hopefully by later in the year, things will have improved.

Looking at it, the train lost time progressively through the journey, being overtime at many stations or in betwen, which suggests overcrowding (or other station issues) extending dwell times, or a unit on low power, or a driver not driving to what the timetable requires.
 

Siemens Staines

Established Member
Joined
30 Jul 2015
Messages
1,527
Looking at it, the train lost time progressively through the journey, being overtime at many stations or in betwen, which suggests overcrowding (or other station issues) extending dwell times, or a unit on low power, or a driver not driving to what the timetable requires.

It was also a 2-car on a 3-car diagram in the evening peak which would not have helped. Reading only has 10 3-car 165s for 10 diagrams at present, so short forming on Basingstoke or North Downs diagrams is common.
 

AeM

Member
Joined
8 Feb 2021
Messages
18
Location
Berkshire
If only the Tri-mode 769s had been put into service to give more passenger capacity. There's nothing worse than a full platform at Reading trying to get onto a 2 car train.......!
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,017
Location
Surrey
Came back across NDL from Reading this afternoon and have to say that there isn't a lot to show for a 16 day closure. The bridge over the Wey has its new wheeltimbers and has been rerailed with gathering rails installed. That was a tricky job and best done in one go rather than doing it in piecemeal fashion but five days should have been sufficient with 24/7 working.There are new signals erected between Dorking West and Shalford but not commissioned and new kit has appeared around the level crossings but existing barriers are still in place. They are renewing the troughing route although not sure why existing one is completely usable. They've done some soil nailing about a mile West of Gomshall. Much of this could have been done in normal possessions. Im not against blockades but given the longer periods of uninterrupted working the reward should be a decent period then with any further possessions but the NDL is being blocked at weekends still for months. This Sunday (23/2), then Sat/Sun (8-9/3), then Sun 13 and 27th April. Thats as far as GWR have published so lets see how many more appear. They also had extended access last year which could have been used to do much of the work I've observed..
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
It was also a 2-car on a 3-car diagram in the evening peak which would not have helped. Reading only has 10 3-car 165s for 10 diagrams at present, so short forming on Basingstoke or North Downs diagrams is common.
That explains why it was busy and further down the platform than usual. I didn't notice it was only 2 cars and there wasn't any announcemts about it being short formed.

However, I am interested in the other points, which I was going to raise anyway. This just happened to occur at the same time.

== Doublepost prevention - post automatically merged: ==

Came back across NDL from Reading this afternoon and have to say that there isn't a lot to show for a 16 day closure. The bridge over the Wey has its new wheeltimbers and has been rerailed with gathering rails installed. That was a tricky job and best done in one go rather than doing it in piecemeal fashion but five days should have been sufficient with 24/7 working.There are new signals erected between Dorking West and Shalford but not commissioned and new kit has appeared around the level crossings but existing barriers are still in place. They are renewing the troughing route although not sure why existing one is completely usable. They've done some soil nailing about a mile West of Gomshall. Much of this could have been done in normal possessions. Im not against blockades but given the longer periods of uninterrupted working the reward should be a decent period then with any further possessions but the NDL is being blocked at weekends still for months. This Sunday (23/2), then Sat/Sun (8-9/3), then Sun 13 and 27th April. Thats as far as GWR have published so lets see how many more appear. They also had extended access last year which could have been used to do much of the work I've observed..
I hadn't realised the new signalling wasn't commissioned yet but may be it makes sense if the level crossings are not.

They did say the level crossings will be completed in October, so I think it's unfair to complain to much about an increase in closures before then, as the railway can't be more reliable until the stuff goes live, although I'm sure what has been completed so far will help. Just that it won't reduce the engineering works processions just yet.

It's only another 7 months, all being well.

I don't know if much work needs to be done west of Guildford for future reliablity or whether that has had work done, making it more reliable already. Obviously, any unreliability west of Gulidford can impact on trains running east of Guildford. Less so for planned engineering works, depending on the length of closure west of Guildford.
 
Last edited:

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,017
Location
Surrey
That explains why it was busy and further down the platform than usual. I didn't notice it was only 2 cars and there wasn't any announcemts about it being short formed.

However, I am interested in the other points, which I was going to raise anyway. This just happened to occur at the same time.

== Doublepost prevention - post automatically merged: ==


I hadn't realised the new signalling wasn't commissioned yet but may be it makes sense if the level crossings are not.
Its replacement signals there is no change to the signalling on the line and thus headways will remain as is.
They did say the level crossings will be completed in October, so I think it's unfair to complain to much about an increase in closures before then, as the railway can't be more reliable until the stuff goes live, although I'm sure what has been completed so far will help. Just that it won't reduce the engineering works processions just yet.
Sorry but the point of blockades is to blitz work and as a result of uninterrupted working you get significantly improved productivity over short midweek nights and even 27hr Sunday possessions.
It's only another 7 months, all being well.

I don't know if much work needs to be done west of Guildford for future reliablity or whether that has had work done, making it more reliable already. Obviously, any unreliability west of Gulidford can impact on trains running east of Guildford. Less so for planned engineering works, depending on the length of closure west of Guildford.
Its all been resignalled now West of Guildford.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
Its replacement signals there is no change to the signalling on the line and thus headways will remain as is.

Sorry but the point of blockades is to blitz work and as a result of uninterrupted working you get significantly improved productivity over short midweek nights and even 27hr Sunday possessions.

Its all been resignalled now West of Guildford.
So in other words there will likely be Sunday processions in similar amounts to now but less Saturday ones.
 

louis97

Established Member
Joined
14 May 2008
Messages
2,153
Location
Derby
Its replacement signals there is no change to the signalling on the line and thus headways will remain as is.
The signalling is changing as part of the level crossing upgrades, between Gomshall and Shalford it will deliver an improvement in the headway. As an example, at present it is only possible to have one train between Chilworth and Gomshall in each direction, this will increase to allow multiple trains between the two. The Timetable Planning Rules have been updated to take this into account in the appropriately dated documents.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
The signalling is changing as part of the level crossing upgrades, between Gomshall and Shalford it will deliver an improvement in the headway. As an example, at present it is only possible to have one train between Chilworth and Gomshall in each direction, this will increase to allow multiple trains between the two. The Timetable Planning Rules have been updated to take this into account in the appropriately dated documents.
Thanks. I was kind of hoping this might be the case but I couldn't be sure.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,295
Location
Bolton
A longer closure may also be the only way to dovetail the railway closures with the highway ones, which is usually what's needed for a large new crossing from scratch. Unfortunately any road other than the most minor track can't just be closed for a day whenever is convenient.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,017
Location
Surrey
The signalling is changing as part of the level crossing upgrades, between Gomshall and Shalford it will deliver an improvement in the headway. As an example, at present it is only possible to have one train between Chilworth and Gomshall in each direction, this will increase to allow multiple trains between the two. The Timetable Planning Rules have been updated to take this into account in the appropriately dated documents.
OK thanks for clarifying that but as no change back towards Reigate wont help overall route headway though?
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Are Chilworth and Tangley LCs to be protected by the same signals or will there be ones between the two?
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
The signalling is changing as part of the level crossing upgrades, between Gomshall and Shalford it will deliver an improvement in the headway. As an example, at present it is only possible to have one train between Chilworth and Gomshall in each direction, this will increase to allow multiple trains between the two. The Timetable Planning Rules have been updated to take this into account in the appropriately dated documents.
Chilworth and Gomshall Stations are only 3 miles 74 chains apart. How many trains are likely to be in that section at one time?
 

louis97

Established Member
Joined
14 May 2008
Messages
2,153
Location
Derby
Chilworth and Gomshall Stations are only 3 miles 74 chains apart. How many trains are likely to be in that section at one time?
If everything is on time, and there isn't any additional non GWR trains running, it is unlikely to be more than one at a time. Potential performance benefits during disruption however.

== Doublepost prevention - post automatically merged: ==

Are Chilworth and Tangley LCs to be protected by the same signals or will there be ones between the two?
In the down direction (towards Guildford) one signal protects them both. In the up direction (towards Redhill) they each have a protecting signal.
 
Last edited:

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
In the down direction (towards Guildford) one signal protects them both. In the up direction (towards Redhill) they each have a protecting signal.
I hope that’s at the west end of the platform! Even so that’s going to make the barriers come down pretty early (on a busy road) as a stopping train chugs slowly away.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,017
Location
Surrey
If everything is on time, and there isn't any additional non GWR trains running, it is unlikely to be more than one at a time. Potential performance benefits during disruption however.
Anytime there is late running trains get turned at Redhill to keep the service even. I suspect this scheme was designed when it was going to be three trains per hour which would have made them more useful.
 

louis97

Established Member
Joined
14 May 2008
Messages
2,153
Location
Derby
I hope that’s at the west end of the platform! Even so that’s going to make the barriers come down pretty early (on a busy road) as a stopping train chugs slowly away.
Yes it is, same location as where the signal is now.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
6,018
I hope that’s at the west end of the platform! Even so that’s going to make the barriers come down pretty early (on a busy road) as a stopping train chugs slowly away.
When I used to commute along the A248 a few years ago, it was noticeable that the full barriers near the station went down well before the automatic half barriers on the main road crossing did, even when the train was coming from the Guildford direction (so reaching the AHB crossing first). So it seems likely that road delays on the A248 will increase considerably.

Anytime there is late running trains get turned at Redhill to keep the service even. I suspect this scheme was designed when it was going to be three trains per hour which would have made them more useful.
It does seem very unlikely that we'll see any increase in North Downs services for a good many years to come. IIRC under the now abandoned 3tph scheme a fast train would have overtaken a stopper at Guildford, so they'd have been running relatively close together around Chilworth.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
If everything is on time, and there isn't any additional non GWR trains running, it is unlikely to be more than one at a time. Potential performance benefits during disruption however.

== Doublepost prevention - post automatically merged: ==


In the down direction (towards Guildford) one signal protects them both. In the up direction (towards Redhill) they each have a protecting signal.
What is the reason there is just one single in one direction but two in the other?
Anytime there is late running trains get turned at Redhill to keep the service even. I suspect this scheme was designed when it was going to be three trains per hour which would have made them more useful.
Whilst that use to be the case, I find more frequently now they don't get turned at Redhill.

So now we have two trains an hour to Gatwick Airport, most hours, they turn the trains early less often and when we only had one train an hour to Gatwick Airport they turned them early more often during disruption.
 

zoneking

Member
Joined
3 Jul 2009
Messages
283
This is all academic as the service is down to a very poor level with multiple cancellations due to trains needing repairs.
 

louis97

Established Member
Joined
14 May 2008
Messages
2,153
Location
Derby
What is the reason there is just one single in one direction but two in the other?
It will be because of the location of Chilworth station, Chilworth station barriers will come down later for a stopping train but you won't be able to have that if you have a signal for each. An alternative would be using four aspect signalling, but that would have increased the cost for limited benefit given how close together they are.

With the planned 3 aspect signalling if you have a signal for each in that direction the signal for Chilworth would have to be the other side of the station as it would be too close to a signal protecting Tangley. This would mean the down time at Chilworth would significantly increase for a stopping train in that direction.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
It will be because of the location of Chilworth station, Chilworth station barriers will come down later for a stopping train but you won't be able to have that if you have a signal for each. An alternative would be using four aspect signalling, but that would have increased the cost for limited benefit given how close together they are.

With the planned 3 aspect signalling if you have a signal for each in that direction the signal for Chilworth would have to be the other side of the station as it would be too close to a signal protecting Tangley. This would mean the down time at Chilworth would significantly increase for a stopping train in that direction.
Thanks for the info. I find it interesting.
 

Wilts Wanderer

Established Member
Joined
21 Nov 2016
Messages
3,199
The signalling is changing as part of the level crossing upgrades, between Gomshall and Shalford it will deliver an improvement in the headway. As an example, at present it is only possible to have one train between Chilworth and Gomshall in each direction, this will increase to allow multiple trains between the two. The Timetable Planning Rules have been updated to take this into account in the appropriately dated documents.

This is technically true but the change to the planning headways is incredibly marginal. For all intents and purposes the capacity of the route remains unchanged.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
This is technically true but the change to the planning headways is incredibly marginal. For all intents and purposes the capacity of the route remains unchanged.
Do is it only useful during disruption or of no use at all in your opinion?
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
I notice for today's engineering works there is only 1 bus an hour to Redhill stopping everywhere, as opposed to the usual 2 trains an hour to Gatwick Airport.

I assume they couldn't find any bus company who wanted to run direct buses from Guildford to Gatwick Airport, unlike during the two week blockade.

It's the same again on the 9 March too and 13 April.

I assume all the works are related to the level crossing works. I've not checked beyond 13 April and I assume the works are only on Sunday's, based on what I've read on here, so I didn't check the Saturday's.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
6,018
I notice for today's engineering works there is only 1 bus an hour to Redhill stopping everywhere, as opposed to the usual 2 trains an hour to Gatwick Airport.

I assume they couldn't find any bus company who wanted to run direct buses from Guildford to Gatwick Airport, unlike during the two week blockade.

It's the same again on the 9 March too and 13 April.
I'd expect that a lot of the through traffic from west of Reading (and Reading area itself) to Gatwick would switch to travelling via London. So the NDL RRBs are only likely to be carrying local passengers not the usual overhead traffic.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
I'd expect that a lot of the through traffic from west of Reading (and Reading area itself) to Gatwick would switch to travelling via London. So the NDL RRBs are only likely to be carrying local passengers not the usual overhead traffic.
If that is the case why did they run direct Guildford to Gatwick Airport services during the last 2 week blockade.

Or is it only on Sundays people switch to travelling via London?
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
If that is the case why did they run direct Guildford to Gatwick Airport services during the last 2 week blockade.

Or is it only on Sundays people switch to travelling via London?
I would hazard a guess its the way NR compensate GW for the disruption of the engineering access. GW get their money back for the blockade but not neccessarily the Sunday only / weekend only closures.
 