There was a Drax one a few days ago.Also very colourful, so far I have seen Freightliner Green and Yellow, DB red, DRS blue and even an old EWS maroon
What’s the location here? I commuted from Hairmyres for 17 years and I’m having trouble placing this.Colas Rail Freight too.View attachment 174361
Sorry, I should have captioned my photograph.What’s the location here? I commuted from Hairmyres for 17 years and I’m having trouble placing this.
Ah! Got it now, thanks.Sorry, I should have captioned my photograph.
A Colas Rail Freight class 66 locomotive hauling a rake of ballast hopper wagons southbound through the site of the former Pollokshaws Goods Yard between Haggs Road and the viaduct over the White Cart Water. Part of the former goods yard was redeveloped for the Arnold Clark car sales and service branch on Pollokshaws Road, which you can see behind the train.
The tactile paving and almost all the station furniture have been removed, so i seriously doubt itInteresting that the photo of the new double track passing the Old Hairmyers Station shows the platform edging still intact, has the station officially been closed or is the platform being left in a usable condition just incase the new station isn't ready once trains resume in May?
Also, Strawhill Road will be shut for two weeks from Monday 17 February and Clarkston Road from Friday 7 March, presumably for track lowering to take place. Materials have been deposited at Church Road so lowering is required there I assume.



Add the Pink ONE livery loco present todayThere was a Drax one a few days ago.
It’s difficult to tell but comparing before and after, it doesn’t look like it’s lowered very much. It does look like the track is further away from the bridge abutment which would tie in with the need to keep the pantograph away from the arch. Possibly a combination of both.Clarkston View on Tue 18-02-25 Showing the Track Lowering. Telephoto Lens so don't know how much Distortion of lowering or not
Old track and sleepers removed, ballast dug out and taken away, new layout from formation up, drainage etc and new track put in. Old stuff goes for recycling.just wondering if the sleepers and track are reused after a lowering or whether it is replaced. I guess it depends on the condition...?
How is signalling handled when a line is under possession like this, and also being physically altered?. Do they just rely on token working in the area?