I understood the traffic outgrew the Masboro one (Tinsley being relatively recent - I photographed the opening train less than 10 years ago).Fascinating stuff.
I’m curious why Newell and Wright have two intermodal terminals so close too each other. Is rail stuff just too expensive to make the Tinsley one big enough to consolidate, there still seems to be space left?
Yes very sad , along with the imminent closure of Waltons modelshop in Altrincham a big part of my childhood coming to an end. Apparently issues with the plant have meant an early closure.It's been reported that the Brunner Mond 'Northwich' hoppers - limestone to Lostock works has finished. The last loaded train being on 24/01/25. The Soda Ash works has now started decommissioning. I'm not sure how long this freight has existed under various guises. But it is thought that it could be one of the oldest freight services in continous operation. Possibly over 100 years. Sad times..
Yes - the traffic flow is Shap to Drigg, staging at Sellafield.Is this a start of new regular flow?
In addition to the regular DRS-operated ballast flow to Crewe, there have been aReally interesting to see Shap Quarry going so well.
Apparently issues with the plant have meant an early closure.
Undoubtedly, same with our steel producers, thanks Maggie.As well as energy costs?
Undoubtedly, same with our steel producers, thanks Maggie.
I guess so, the one who tried to make sure we had no indigenous coal production (and had the Point of Ayr colliery shut down when it had just been refitted for fast efficient output to feed its on-site grid-feeding gas-making plant.) Money thrown away. https://en.wikipedia.org/wiki/Point_of_AyrWhich Maggie, the one that ceased to be PM 34 years ago?
The site was chosen in the early eighties for a demonstration "Oil from Coal" plant jointly funded by the government, the National Coal Board and others. Bench scale trials was carried out on site but the project became a victim of the miners strike and the subsequent cut back in research funding for this and clean burn technology. The plant never became operational and was scrapped.
Yes that Maggie, the one who started the sale of pretty much everything, ask Sid.Which Maggie, the one that ceased to be PM 34 years ago?
Excellent! Plus 4E58 04:30 Trafford Park Euro Term to South Bank Tees Dock, proving that we can still have more freight through the Castlefield Corridor.Monday 03.02.2025
68033
0Z68 0153 Crewe Gresty Bridge to South Bank Tees Dock
4Z59 1525 South Bank Tees Dock to Trafford Park Euro Term
First working of this new ‘Tesco train’.
Is this a start of new regular flow? I noticed it starts at Drigg a few weeks later. Really interesting to see Shap Quarry going so well.
Yes - the traffic flow is Shap to Drigg, staging at Sellafield.
DB are still working the Portbury Docks to Margam steel traffic. Currently two return trips daily. Not clear when/if gbrf are taking over.
The route learners were a couple of months back and the paths in the timetable since mid-December. The DB workings did seem to peter out a bit but I think that might have just been winding down for Xmas. I was expecting GBRF to appear in the new year.
Interesting that the two diagrams run so close to each other (4hrs apart)?Interesting to hear about this flow.
The wagons loaded at Shap Summit on Friday have been offloaded at Drigg today. Workings as follows:
68016 on 31st Jan
6C14 11:49 Carlisle Kingmoor DRS - Shap (10 empties)
6C14 15:48 Shap - Sellafield (10 loads)
68016 today (4th Feb)
6C11 07:06 Sellafield - Drigg (10 loads)
6C14 10:00 Drigg - Shap Summit (10 empties)
Next working should be 6C14 15:48 to Sellafield
68017 on 31st Jan
6C16 15:07 Carlisle Kingmoor DRS - Shap (10 empties)
6C16 19:56 Shap - Sellafield (10 loads)
68017 on 4th Feb (today)
6C12 10:19 Sellafield - Drigg (10 loads)
6C16 13:40 Drigg - Shap Summit (10 empties)
Next working should be 6C16 19:56 to Sellafield (schedules are set up to Sellafield North Siding).
Interesting that the two diagrams run so close to each other (4hrs apart)?
During the first campaign, DRS will operate two trains a day, four days a week, to Nuclear Waste Services’ (NWS) Low Level Waste (LLW) Repository site, in Cumbria. The trains will deliver aggregate for the Southern Trench Interim Membrane (STIM) project – a project to replace a protective barrier over the legacy disposal trenches at the site.
This is the first in a series of material deliveries as part of the project, delivering 46,400 tonnes of aggregate over 64 trains ...Further trains will be run in other stages over the project’s three-year duration
https://www.directrailservices.com/...missions-and-support-decommissioning-mission/
Monday 03.02.2025
68033
0Z68 0153 Crewe Gresty Bridge to South Bank Tees Dock
4Z59 1525 South Bank Tees Dock to Trafford Park Euro Term
First working of this new ‘Tesco train’.
This was the best I managed for a shot of one of the converted KEAs in the rather poor lighting. Appears they've just had the sides chopped down and some holes (for drainage?) cut into the sides. Interestingly it appeared all of the wagons besides the frontmost and rearmost KEA are 'inner' wagons without buffers so presumably these will have to run around in semi-fixed formations?GBRF ran a 6C92 09:45 Margam - Portbury today with 66787 and 9 KEA wagons (possibly for loading trials). The loco returned light engine as 0C92 to Cardiff Tidal.
I think these 9 KEAs are the only ones which have emerged from Shirebrook so far. I've not seen a close-up photo of them yet, but in this drone shot of Shirebrook you can see a couple of KEAs to the left of the fence which have been cut down in height compared to the ones being shunted: https://www.flickr.com/photos/robmcrorie/54119353681/ (Photo: robmcrorie)
DB also worked into Portbury earlier today with 6Z53 empties / 6Z55 loaded slab back to Margam. Some older BTA wagons are in this set alongside the BYA slab conversions (from covered coil wagons), but refurbished BAA wagons have started appearing from the DB facility at Stoke (formerly Marcroft), as mentioned here: https://www.railforums.co.uk/threads/wagon-fleet-news-and-discussion.278615/post-7140466
Some pictures of the re-bodied, re-bogied BAAs were posted by the National Wagon Preservation Group on Facebook (I don't "do" Facebook but you should be able to view one or two posts without logging in).
66652 at Portbury in October: https://www.flickr.com/photos/74165767@N05/54112254786/ (Photo: Driver 59)
Good view of the slabs on 6Z53 from Portbury in November: https://www.flickr.com/photos/58449051@N08/54153181891/ (Photo: Nigel Power)

Does anyone know what these trains look like - how many wagons/containers/customers? Yet to see any photos or videos.
This was the best I managed for a shot of one of the converted KEAs in the rather poor lighting. Appears they've just had the sides chopped down and some holes (for drainage?) cut into the sides
Just to add to the earlier replies regarding the new Tees-Trafford Park working:Does anyone know what these trains look like - how many wagons/containers/customers? Yet to see any photos or videos.
I would assume the holes are for visual inspection. No need to cut drainage holes in box wagons and certainly not at that height and size.This was the best I managed for a shot of one of the converted KEAs in the rather poor lighting. Appears they've just had the sides chopped down and some holes (for drainage?) cut into the sides. Interestingly it appeared all of the wagons besides the frontmost and rearmost KEA are 'inner' wagons without buffers so presumably these will have to run around in semi-fixed formations?
View attachment 174197
Visual inspection for part loading?I would assume the holes are for visual inspection. No need to cut drainage holes in box wagons and certainly not at that height and size.
I think they have always used electromagnets, which can apparently lift up to 40 Tonnes.Curious as to how they will load slab onto those cut down KEAd, I’ve assumed with the existing flat wagons they use something like a telehandler as the slabs sit on top, with these it looks like they are dropped into the body so I’m guessing some sort of crane, unless slung underneath a telehandler if that’s even possible? Though I am just guessing at methods here.
Curious as to how they will load slab onto those cut down KEAd, I’ve assumed with the existing flat wagons they use something like a telehandler as the slabs sit on top, with these it looks like they are dropped into the body so I’m guessing some sort of crane, unless slung underneath a telehandler if that’s even possible? Though I am just guessing at methods here.
I think they have always used electromagnets, which can apparently lift up to 40 Tonnes.
No 4L92 tonight, and since the most recent Freightliner reshuffle there hasn’t been a 4L92 at all. 4L02, the most similar headcode I can see, is happily cruising along the WCML South right now.Slightly off topic but 4L92 is reported to have derailed with at least 1 wagon down a bank. I know it's an intermodal train but does anyone know it's route and where it derailed?