TT-ONR-NRN
Veteran Member
Well said.Utterly pathetic, basically. Bunch of "adults" who should hang their heads in shame.
Well said.Utterly pathetic, basically. Bunch of "adults" who should hang their heads in shame.
Unfortunately I can't find the post I referred to, so maybe my recollection of it is faulty.The overhauls will be spread over a few years. Even if they did two per month, that's only 24 per year. So the remaining fleet will be spread over at least three years.
So is it confirmed that the 455s will be going through overhauls?The overhauls will be spread over a few years. Even if they did two per month, that's only 24 per year. So the remaining fleet will be spread over at least three years.
No, not at all. C4 are mileage based and C6 are date based, assuming that class 455 are the same as class 150. My point is that the last run of overhauls will have taken place over a period of a few years. So it stands to reason that they will run out of miles or time over a similar period of years. They won't all drop dead on, for example, 31/12/25. It might be that the leases all expire around the same time but extending a lease for something that will otherwise go for scrap ought to be simple enough. Introducing 40 class 701 to replace 40 pairs (give or take) of 455s by the end of the year will be a tall order.So is it confirmed that the 455s will be going through overhauls?
Ah right, thanks. Sorry, I'm being a bit slow today!No, not at all. C4 are mileage based and C6 are date based, assuming that class 455 are the same as class 150. My point is that the last run of overhauls will have taken place over a period of a few years. So it stands to reason that they will run out of miles or time over a similar period of years. They won't all drop dead on, for example, 31/12/25. It might be that the leases all expire around the same time but extending a lease for something that will otherwise go for scrap ought to be simple enough. Introducing 40 class 701 to replace 40 pairs (give or take) of 455s by the end of the year will be a tall order.
GTR is much larger and has been under a management contract since 2014.Could it just be that SWR is too big for a remote government department to manage?
Plenty of Labour seats, including new ones, on the Windsor lines.Once you’re outside Wandsworth, i dont think any SWR station is in a target Labour seat. Its entirely Conservative or floating Lib Dems for the entire region. Just milk the punters for their worth to fund Northern Rail.
Have always thought so. Harking back to 458 conversion first time around and subsequent re-introduction as 5 car, thence 456/707 introductions, the plan was worked out on the basis of a ramp up (the next pair of 458/5 etc and subsequent cascade of other types) once every fortnight. So in theory one might say one new 10 car 701 once every fortnight, but that is me thinking of past introductions, I could well be way out from my retired comfy chair!Introducing 40 class 701 to replace 40 pairs (give or take) of 455s by the end of the year will be a tall order.
Quite so. The former was a major problem with the above mentioned 458/0 to 458/5 conversion at Donny (for some vehicles) and the latter was the nail in the coffin for the 3 Cig's on the Lymmy branch in the end, much to the disdain of some in the enthusiast world. It was what it was, and the railway needs reliability, less it gets stung financially.Talking of which, in the latest issue of Modern Railways SWR have stated that "ideally" all 455s will be withdrawn by the end of this year due to increasing issues with corrosion and sourcing of parts
Could also do with toning it down quite a bit, lots of repeating information and does the calling pattern need to be announced in full after every station?Wish they’d change the announcements on the 701s… the Celia voice that has clearly been altered using some sort of computerised synthesis sounds so depressing
Here's the extract for those interestedTalking of which, in the latest issue of Modern Railways SWR have stated that "ideally" all 455s will be withdrawn by the end of this year due to increasing issues with corrosion and sourcing of parts. They will be withdrawn and sent for scrap as they become due for repair.


I just hope 455868 will be preserved.455s will be withdrawn and stripped of components before being sent to scrap"
View attachment 173433
As with TPE, SE, TfW and Scotrail it'll undoubtedly still be SWR. Just a change of owner and registered company name (currently First MTR South Western Trains Ltd).I mean, SWR is not going to be a thing possibly by May, but still.
The new temporary stop gap has been revealed...Ok, so what will the former SWR use as 455 replacements? Class 47s in push pull mode with 7 Mk 2s and a DVT ???? The mind boggles ...
I am surprised there has not been an incident like this yet to the 455's, it has happened to a 1996 Stock and I think a Class 321.The new temporary stop gap has been revealed...
View attachment 173457
it'll undoubtedly still be SWR. Just a change of owner and registered company name (currently First MTR South Western Trains Ltd).
As SWR is going going to be nationalised they could use the spare 465 MetCams in storage but it is not really realistic. Class 350/2's could be a good option and it could also send the 701/5's to SE who also really need new trains. The Class 350/2's are very similar to the 450's, its just that they don't have 3rd rail shoes. I think SWR has too many 701's anyway so the /5's going to SE would not really be a problem. - I hope...Ok, so what will the former SWR use as 455 replacements? Class 47s in push pull mode with 7 Mk 2s and a DVT ???? The mind boggles ...
It really doesn't.I think SWR has too many 701's anyway
Actually, if you compare the timetable before Covid (and the timetable they bid against) with what is run now, then they will have too many trains once the 701s enter service. There were a load of peak extras in the old world that no longer runa nd there is no sign of them being reinstated.It really doesn't.
As if SE need yet another microfleet.I think SWR has too many 701's anyway so the /5's going to SE would not really be a problem. - I hope...
Guessing that post I saw was misleading then.It really doesn't.
The SWR Engineering Director stated that there are too many. On balance I'd say that's sufficient evidence.Guessing that post I saw was misleading then.
Okay. I was right then.The SWR Engineering Director stated that there are too many. On balance I'd say that's sufficient evidence.
Where do they get that figure from? There are six in regular service, and have been since November."But as one Alstom product leaves the table, another enters. Despite umpteen Class 701 EMUs having been accepted, SWR is running just four.
It has too many for what they run now, because they no longer can be bothered to run 2tph to Dorking or Guildford via Bookham, nor the much needed 4tph peak Readings or even more than 2tph via Hounslow off peak…The SWR Engineering Director stated that there are too many. On balance I'd say that's sufficient evidence.
There has been a disagreement on wording, no specific information released.
So ASLEF and SWR are currently in the middle of a p**si*g contest basically...
Or 2tph stoppers via MortlakeIt has too many for what they run now, because they no longer can be bothered to run 2tph to Dorking or Guildford via Bookham, nor the much needed 4tph peak Readings or even more than 2tph via Hounslow off peak…
Exactly. And from the sounds of it they have no intention whatsoever of increasing service levels for the foreseeable future.It has too many for what they run now, because they no longer can be bothered to run 2tph to Dorking or Guildford via Bookham, nor the much needed 4tph peak Readings or even more than 2tph via Hounslow off peak…
The period 7 data covers October, when there were four units in service.Where do they get that figure from? There are six in regular service, and have been since November.
Something to do with guard avaliablity apparently. But of course this might change when nationalisation happens in May. Again, I believe SWR will be given a little more treatment as they're the first of the operators under Labour to be nationalised and therefore you'd expect them to want it to look like it's working so people are supportive of further franchise transfersIt has too many for what they run now, because they no longer can be bothered to run 2tph to Dorking or Guildford via Bookham, nor the much needed 4tph peak Readings or even more than 2tph via Hounslow off peak…
You were very lucky then, as there seems to be only one out today, working a Windsor diagramI got a taste of what the future might be like amongst all of the engineering work between Surbiton and Clapham this weekend and rode a 701 for the first time, completely by chance.
Looks to be 701 031?You were very lucky then, as there seems to be only one out today, working a Windsor diagram