Maintenance in the Wimbledon area will affect services across the SWR network, with long-distance services between London Waterloo and Exeter St Davids, Portsmouth Harbour and Weymouth revised and diverted on:
- Saturday 18 and Sunday 19 January
- Saturday 25 and Sunday 26 January
Network Rail engineers will renew approximately 800 metres of track, ballast, and sleepers between Wimbledon and Earlsfield. They will also replace points (moveable sections of track that allow trains to move from one line to another) and install 100 metres of conductor rail, which powers trains.
This work will improve the reliability of the track in the area, reducing the number of faults caused by rail and wheel wear and provide customers with a smoother ride as the layout of the track is improved.
Direct trains will run to and from London Waterloo on these dates, however, they will take longer than usual. Customers are advised to allow extra time to complete their journeys.
This coming weekend (25/26 Jan), as well as last (and possibly earlier), engineering work in the Wimbledon area sees SW long distance services diverted via Staines, Virginia Water, and Byfleet Junction.
As I understand it, the services diverted are two Weymouths, two Portsmouths, and one Exeter every hour. Together with normal services over the route (2 TPH Waterloo to Bracknell, 2 TPH Waterloo to Woking, and 2 TPH Waterloo to Windsor), this gives 11 TPH each way over the double track Barnes to Staines section.
Presumably, this is having a significant effect on the level crossings at White Hart Lane, Mortlake and North Sheen?
The barrier downtime must be significant. And, with only 2 TPH fewer west of Staines, the position can't be much better at Egham.