Nottingham59
Established Member
Only P7+11 (542m) is on the south side of the station. Unfortunately P2+19 (595m) and P1+20 (385m) are on the north side, so would mean crossing the western throat to be usable by long HS2 trains.Waverley already has two 400m+ platforms - 1/19 and 10/11. You'd probably want to renumber, though, as "the train now arriving at platforms 1 and 19" might confuse people.
See also this thread:
400m platforms at Edinburgh Waverley
Could Waverley handle 400m HS2 trains? When HS2 phase 1 opens in 2033, it seems to me that HS2 will become the main route between London and Edinburgh, with journey times from Old Oak Common to Waverley likely to be under four hours. Edinburgh-London flows (at 2700 passengers / day) are much...
True but, even with phase 2a and the new tunnel to Slateford, London-Edinburgh journey times will still be around 3h30. So the attractiveness of high frequency will be less than it would be for shorter journeys.The idea of splitting/joining on the "Scotland superfasts" was more I think because 2tph at 200m has more value to people than 1tph at 400m
And I understand that the London-Edinburgh market is three times the size of London-Glasgow. So it really makes sense to be able to send full length HS2 trains non-stop to Edinburgh. 1tph would be plenty.
I think you could extend P1 and P2 to 400m by building out over the river Clyde, as shown here:(plus there's far less scope to extend Glasgow Central).
400m platforms at Glasgow Central?
[Crayon alert!] Could space be found for 400m long platforms at Glasgow Central? When HS2 phase 1 starts, the fastest route from London to Edinburgh will be via HS2 phase 1 and Carlisle. So I'm expecting England-Scotland passenger traffic via Carlisle to grow strongly over the next twenty...
That would have the advantage of being able to run a 400m shuttle between Waverley and Central (but I don't know enough about the rail usage in Scotland to know if that would be worthwhile)