I highly doubt entry into service will be 2030 based on the way northerns has worded it. Iam going so guess as long as training and testing goes well then 2031 will probably see them into passenger service?Ok possible misunderstood, maybe delivery is 2028 and entry into service 2030 or is 2028 way too optimistic?
== Doublepost prevention - post automatically merged: ==
Where does it say on Northerns annoucements that 769 are going in phase 1? They have only specified 150, 155 and 156s so far?It looks like it. The rest of phase 1 is 150,155,156,769 replacements. It's unclear whether the 158s are getting replaced in phase 2 or sooner.
They pretty much are, phase one is TRU EMUs + 150/155/156/769 replacement, phase two is 323/333 replacement. This way allows for a common design between fleets.