Bletchleyite
Veteran Member
Not true. Class 309 says "hello".
Well I didn't know that! The Northern fleet is going to be 3s and 4s (or Stadler equivalent) in any case. This is specified in an excerpt from the tender documents above.
Not true. Class 309 says "hello".
I do wonder how many manufactuers would send in bids for lot 1 or 3 intead of just sending in 1 big bid for lot 2 including the other ones.It is possible that all lots are awarded to the same manufacturer but it isn't unlikely that a mix is chosen. For example, CAF could offer a class 331 compatible EMU for Lot 1 which would make a lot of sense.Lot 1 - EMU
Phase 1
11 x 3 car
Phase 2
34 x 3 car
16 x 4 car
These may be ordered under Lot 2 or Lot 3 as direct built to EMUs.
Lot 2 - Multimode Multiple Unit (Diesel + Battery + Electric with potential to convert or direct build to Electric + Battery Electric)
Phase 1
44 x 3 car
66 x 4 car
Phase 2
30 x 3 car
20 x 4 car
Lot 3 - Battery EMU (Battery + Electric with poential to convert or direct build to Electric)
Phase 1
6 x 4 car
Phase 2
26 x 4 car
These may be ordered under Lot 2 as direct built to BEMUs.
I'm sure a 2 Car AC EMU would be possible. One coach for Transformer (etc), the other for Motors + Motor/ Aux Equipment.Can't remember where I read it but I understand the Desiro Verve does now offer level boarding as an option.
== Doublepost prevention - post automatically merged: ==
I believe 3 and 4 are the intention. There aren't any UK 25kV 2 car EMUs, there's not enough underfloor space for all the gubbins I believe. There are enough 2 car 195s to cascade to secondary lines, which was the main reason, I understand, why the 195 fleet isn't all 3 car.
For some manufacturers, it will depend on what they can offer. All can do EMU and BEMU within their current offering but, aside from Stadler, diesel would require a clean sheet design. It's a large order, so I imagine most will be willing to take it on, but some manufacturers may see limited future work for diesel and aren't prepared to do a clean sheet design just for lot 2.I do wonder how many manufactuers would send in bids for lot 1 or 3 intead of just sending in 1 big bid for lot 2 including the other ones.
Not true. Class 309 says "hello".
Indeed. There were most certainly 2-car 309s. Definitely possible!
The additional equipment of today's requirements (accessible toilets and associated tanks, aircon kit, etc.) would probably make a 2-car unit more tricky. Though it's more a case of if a service could only justify 2 cars then there isn't much of a business case for putting the wires up in the first place. Even the 2-car 309s only really existed to allow 10-car formations... and were later extended to 4-car with the addition of 2 formerly loco-hauled coaches.I'm sure a 2 Car AC EMU would be possible. One coach for Transformer (etc), the other for Motors + Motor/ Aux Equipment.
One would suspect that sufficient funding was not available ~10 years ago to enable diesel-battery-electric vehicles to be procured.A shame the previous order for straight EMUs and DMUs (the 331s and 195s) wasn't for something more flexible and adaptable like this.
New here but have been watching these forums for a while.Nothing particularly surprising in the announcement, but the shortlist is confirmed as:
Alstom
CAF
Hitachi
Siemens
Stadler
(I am unable to post a direct link to the source).
I calculate Phase 1 to be 453 carriages (in 127 units), which while less than the 185 15x units with Northern, surpasses their 380 carriages.Just to back this up… see attached replies from Northern and the DfT although there does seem to be some confusion as Northern and DfT have previously stated all 15X units to go by 2028/29 but that seems to have been rolled back to 150-156.
I calculate Phase 1 to be 453 carriages (in 127 units), which while less than the 185 15x units with Northern, surpasses their 380 carriages.
This order ideally needs to be gangwayed stock as standard, for both the electric and diesel units. Plus also, they need to be a design already in service on the UK railways - such as the Class 730's or Class 196. No more of this lengthy delayed "testing" of yet more new types of stock that just delay and delay, hold up after hold up of entry into service and being of no benefit to anyone.
Definitely not the case in the North East. There’s the odd booked 4 car working, the vast majority however are 2 car.As the 15x these days mostly work in pairs
And the same goes for those in Cumbria.Definitely not the case in the North East. There’s the odd booked 4 car working, the vast majority however are 2 car.
Minimal.When are we expecting details of TPE's rolling stock? With northern and TPE under DOHL, what are the possibilities of joint orders of a uniform fleet? Or atleast as uniform as possible..
As the 15x these days mostly work in pairs I can't imagine that being a huge issue. A 3-car new unit would replace a pair of 150s (72m vs 80m, but less wasted space as no buried cabs) and a 4-car a pair of 155/156. The 2 car 195s remain for routes that genuinely only justify 2 car.
I heard they were told to seperate into a couple of manufacturers to stop whole fleet grounding like the CAF 195 yaw damper cracks and the Hitachi problemsThe original notice for the procurement (Aug 2023) indicated one supplier for all phases.
The text above mentions "companies", so I imagine that means more than one manufacturer may win an order.
But they will need to be convertible to EMU/BEMU.
We need to see the ITT for an assessment of the likely designs.
They are starting with the hardest tranche (DMU replacement) first.
The good news is it is 3car and 4car, the existing 2car DMUs don't really have the capacityThe framework is divided into 3 lots. Orders from the framework are done in phases, with 2 phases detailed as part of the framework award. These lots can be awarded to separate manufacturers.
Although this is a Northern led order, it would have been better in some ways if 2 manufacturers were chosen, but GWR and SouthEastern requirements were part of same design. Maybe follow on batches are possible for other soon to be nationalised areas.It is possible that all lots are awarded to the same manufacturer but it isn't unlikely that a mix is chosen. For example, CAF could offer a class 331 compatible EMU for Lot 1 which would make a lot of sense.
I think all the manufacturers have built vehicles with lower floors in centre of vehicle, and raised areas over bogies with slopes or steps. They also all have designs with HVAC (heating, ventilation, air conditioning) modules on roof, where there is insufficient under floor space.Northern has previously stated a preference toward level boarding, but since all units are 3+ vehicles all CAF would need to do is engineer a new centre car with a central lower section.
Do they do gangway'd FLIRTs? If not, I'm sure a mix of 3, 4 and ideally 6 car units would work well, especially at places like the Mid Cheshire where 4x20m is too long for some platforms.
For God's sake please make them, a) compatible b) easy to add on orders c) a standard bodyshell d) comfortable seats.
There is confliction in this announcement: First they state that they want to "eliminate complexities" which come with dirrerent train types, then they state they are working to appoint "a company or companies" to manufacture the new trains ! Surely only one bid winner will provide a standard or compatible fleet - if more than one company wins, they will be stuck with the "complexities" they say they want to eliminate !!
I hope gangway units are a requirement - ordering the CAF fleet without was an incredibly short-sighted decision, which will absolutely bite Northern in the future. Other operators with CAF gear have at least thought this through.
That’s one way of looking at it, the other is the infighting and blame games that could also result.It could always be a consortium - it's not something we've seen in the UK rolling stock market for a while, but is certainly more common on the continent. Recent examples that immediately spring to mind are the current DSB S-Tog fleet in Denmark (LHB/Siemens/Alstom), with their replacements being tenders for by a Siemens-Stadler consortium, which was also the combination who produced the latest Berlin S-Bahn units.
Might not be a bad direction to go, since each manufacturer will hold the other accountable since neither will get paid unless the project is successful!
Northern's new trains
Northern begin negations for new trains
Northern Trains has moved a step closer to the largest ever investment in its fleet which could eventually see up to 450 new trains.
Major train manufacturers have been invited to begin negotiations to supply new trains to operate across the North of England.
The new trains will be introduced on a phased basis, replacing the oldest units in Northern’s existing fleet, most of which have been in service since the 1980s and 90s. Approximately two thirds of existing fleet is targeted to be replaced in the next ten years.
The trains will feature a mix of electric, multi-modal (diesel/electric), and battery-powered models, ensuring greater efficiency and sustainability
Rollout will begin with replacing the oldest trains and introducing electric units for key routes, such as local services between York, Leeds, Huddersfield, and Manchester. These upgrades will enhance passenger comfort, reliability, and environmental performance, while simplifying operations.
Northern is working closely with leading train manufacturers to deliver these modern trains as soon as possible, marking a significant step forward for rail travel across the North of England.
The procurement process tends to have opposing parameters affecting timescales. A few countries keep it simple (needs to do A, B, C etc) and let manufacture just get on with it, so they just vary something that works and is cost effective.
But the British way seems to be to write a hideously long spec with all sorts of mins and maxs, then when manufacturers realise it requires lots of non standard parts, price goes up, then buyer starts faffing and paring bits back as too expensive (and wasting many months doing so). So end up with a procurement that started in 2023 which probably won't get to a signed contract until 2026.
Of course if the design is not made up of standard parts with simple variation, instead of having a new train delivered in 2027, will be lucky if it gets into service by 2030.
I have checked some European orders, and first trains are in service within 4 years of issuing tender, so it is unfortunate that Northern (probably under DfT meddling) has turned process into a 6-7 year wait.
Level boarding simply means the train will offer level boarding at the standard uk platform height of 915mmBut will they take the opportunity for level boarding? Probably find the platforms are all at different heights.
While preferred is better than nothing, it should be an absolute requirementMy understanding, unless things have changed, is that level boarding is preferred. If that’s still the case then with that in mind, CAF probably won’t last long on the shortlist and Hitachi might struggle too. Stadler do level boarding as standard and Alstom have confirmed that it’ll be available on the Adessia platform too. Siemens have just made changes to the Desiro Verve so possible that they might also now offer level boarding.
Good to see that the 150s, 155s and 156s are going first. They’re all overdue replacement.
I can't see any new DMU orders that would be sensible. Indeed, I would argue that there is going to be an excess of existing DMUs around the second half of the 2030s if the government acts remotely sensibly over the next 10 yearsDoes this mean, obviously, that there will be no more orders for 195s ? Indeed, across all TOCs, is that it for DMUs?
GWR is likely to have similar requirements but SouthEastern requires 20m vehicles. I can't see why GWR couldn't order from the same framework.Although this is a Northern led order, it would have been better in some ways if 2 manufacturers were chosen, but GWR and SouthEastern requirements were part of same design.
I believe so in other countries. At least the centre vehicles having a lower floor section should be possible.I think all the manufacturers have built vehicles with lower floors in centre of vehicle, and raised areas over bogies with slopes or steps.
Are they really needed between units based on additional cost, resulting compromise on cab layout against how much use they get? I am unconvinced they are needed.
If the trains don't offer level boarding, that would be a serious failure. Now that level boarding trains are operational, any further orders of inaccessible trains is utterly unacceptable.