Phase one of our long-term rolling stock strategy is to replace our oldest trains - the Class 150, 155 and 156 fleets. They’ve served us well but new trains will bring many benefits, including reduced maintenance costs and reducing the complexity that comes with so many different train types.

‌We’ve been working hard on the lengthy process to appoint a company, or companies, that will manufacture our new trains and have achieved a major milestone. Earlier this week we notified five prospective train manufacturers – Alstom, CAF, Hitachi, Siemens and Stadler – asking them to bid for the supply of new trains for Northern.
New train types and a phased approach

Our programme has three lots for the manufacturers to consider - Electric Multiple Units (EMU), Battery-Electric Multiple Units (BEMU), and Multi-mode Multiple Units (MMU) capable of conversion to BEMU or EMU during their life.

And we will bring new trains forward in three phases. The first will replace our oldest trains - Class 150, 155 and 156 fleets – and will also support the early stages of the Transpennine Route Upgrade. Phase two will cover the next phase of older trains and diesel-powered trains in the fleet.

Nothing particularly surprising in the announcement, but the shortlist is confirmed as:
Alstom
CAF
Hitachi
Siemens
Stadler

(I am unable to post a direct link to the source).
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Russel

Established Member
Joined
30 Jun 2022
Messages
5,463
Location
Lichfield
Nothing particularly surprising in the announcement, but the shortlist is confirmed as:
Alstom
CAF
Hitachi
Siemens
Stadler

(I am unable to post a direct link to the source).

Probably easier to list the manufacturers with UK factories that haven't been shortlisted!
 

Danfilm007

Member
Joined
5 Jul 2015
Messages
330
Since Vivarail are gone, isn't that literally no-one?

I'm hoping for Stadler.
Do they do gangway'd FLIRTs? If not, I'm sure a mix of 3, 4 and ideally 6 car units would work well, especially at places like the Mid Cheshire where 4x20m is too long for some platforms.
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,088
For God's sake please make them, a) compatible b) easy to add on orders c) a standard bodyshell d) comfortable seats.
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,088
Since Vivarail are gone, isn't that literally no-one?

I'm hoping for Stadler.
They'll use that faux pa that they will be built in the UK when in fact they will just be assembled like a flat pack. TBF at least the Alstom or Hitachi orders would see UK jobs secure with more created
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,915
Location
Mold, Clwyd
The original notice for the procurement (Aug 2023) indicated one supplier for all phases.
The text above mentions "companies", so I imagine that means more than one manufacturer may win an order.
But they will need to be convertible to EMU/BEMU.

We need to see the ITT for an assessment of the likely designs.
They are starting with the hardest tranche (DMU replacement) first.
 

wickham

Member
Joined
3 Feb 2021
Messages
699
Location
Knaphill
There is confliction in this announcement: First they state that they want to "eliminate complexities" which come with dirrerent train types, then they state they are working to appoint "a company or companies" to manufacture the new trains ! Surely only one bid winner will provide a standard or compatible fleet - if more than one company wins, they will be stuck with the "complexities" they say they want to eliminate !!
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,463
Location
Lichfield
Do they do gangway'd FLIRTs? If not, I'm sure a mix of 3, 4 and ideally 6 car units would work well, especially at places like the Mid Cheshire where 4x20m is too long for some platforms.

Will gangways be a consideration, given the CAF stock was delivered without them?

On the double 350's on the Trent Valley, I see no end of people who are hesitant to pass through the cab area into the other set, so I'm wondering from a passenger point of view, how important it actually is?
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,352
Location
Yorkshire
Since Vivarail are gone, isn't that literally no-one?

I'm hoping for Stadler.
Weren't Talgo looking at building an assembly plant in the UK a while back? Though it's all gone quiet on that front so maybe it was dependent on winning the HS2 contract?
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,633
Location
Hampshire
They'll use that faux pa that they will be built in the UK when in fact they will just be assembled like a flat pack. TBF at least the Alstom or Hitachi orders would see UK jobs secure with more created
So would Siemens. I mean, at one point they had more British assembled components in a Desiro City than the equivalent unit from Bombardier.

Siemens will also tick the local element - Goole, and can be a Desiro derivative.
 

Trainman40083

Established Member
Joined
29 Jan 2024
Messages
4,591
Location
Derby
Weren't Talgo looking at building an assembly plant in the UK a while back? Though it's all gone quiet on that front so maybe it was dependent on winning the HS2 contract?
Yes, Talgo were looking at a site at Longannet on the old Power Station site (north bank of the River Forth). No HS2 order, probably scuppered that
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,859
Location
west yorkshire
To me only Siemens and possibly Stradler and Hitachi trains seem to work out of the box. The rest seem to take literally years to reach service and acceptable reliability.
K
 

Trainman40083

Established Member
Joined
29 Jan 2024
Messages
4,591
Location
Derby
But will they take the opportunity for level boarding? Probably find the platforms are all at different heights.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
My understanding, unless things have changed, is that level boarding is preferred. If that’s still the case then with that in mind, CAF probably won’t last long on the shortlist and Hitachi might struggle too. Stadler do level boarding as standard and Alstom have confirmed that it’ll be available on the Adessia platform too. Siemens have just made changes to the Desiro Verve so possible that they might also now offer level boarding.

Good to see that the 150s, 155s and 156s are going first. They’re all overdue replacement.
 

Trainman40083

Established Member
Joined
29 Jan 2024
Messages
4,591
Location
Derby
My understanding, unless things have changed, is that level boarding is preferred. If that’s still the case then with that in mind, CAF probably won’t last long on the shortlist and Hitachi might struggle too. Stadler do level boarding as standard and Alstom have confirmed that it’ll be available on the Adessia platform too. Siemens have just made changes to the Desiro Verve so possible that they might also now offer level boarding.

Good to see that the 150s, 155s and 156s are going first. They’re all overdue replacement.
Was it 1985/1986, when the 150s started service?
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,088
So would Siemens. I mean, at one point they had more British assembled components in a Desiro City than the equivalent unit from Bombardier.

Siemens will also tick the local element - Goole, and can be a Desiro derivative.
Cool... forgot about the Goole/Siemens plant
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,176
To me only Siemens and possibly Stradler and Hitachi trains seem to work out of the box. The rest seem to take literally years to reach service and acceptable reliability.
Class 555, 777, 810 say otherwise. But this is all said entirely on a speculative basis - and I don’t imagine that Northern would be tendering for ‘metro’ or InterCity units.
 

wickham

Member
Joined
3 Feb 2021
Messages
699
Location
Knaphill
It was announced some time ago that Talgo had pulled out of the UK market. They did have a presence at Barrow Hill for a time, which included one (old) Talgo trailer car. I think this has been relocated or given away but can not recall who or where to.
 

flyer

Member
Joined
4 Nov 2024
Messages
19
Location
leeds
Can’t wait for this new rolling stock to arrive and get rid of the old wrecks we’ve had to put up with for so long.
I just hope they order more longer trains, 2 and 3 car just aren’t long enough for a lot of the routes they’ve been serving.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
There is confliction in this announcement: First they state that they want to "eliminate complexities" which come with dirrerent train types, then they state they are working to appoint "a company or companies" to manufacture the new trains ! Surely only one bid winner will provide a standard or compatible fleet - if more than one company wins, they will be stuck with the "complexities" they say they want to eliminate !!
The framework is divided into 3 lots. Orders from the framework are done in phases, with 2 phases detailed as part of the framework award. These lots can be awarded to separate manufacturers.

Lot 1 - EMU
Phase 1

11 x 3 car
Phase 2
34 x 3 car
16 x 4 car

These may be ordered under Lot 2 or Lot 3 as direct built to EMUs.
Lot 2 - Multimode Multiple Unit (Diesel + Battery + Electric with potential to convert or direct build to Electric + Battery Electric)
Phase 1

44 x 3 car
66 x 4 car
Phase 2
30 x 3 car
20 x 4 car
Lot 3 - Battery EMU (Battery + Electric with poential to convert or direct build to Electric)
Phase 1

6 x 4 car
Phase 2
26 x 4 car

These may be ordered under Lot 2 as direct built to BEMUs.

It is possible that all lots are awarded to the same manufacturer but it isn't unlikely that a mix is chosen. For example, CAF could offer a class 331 compatible EMU for Lot 1 which would make a lot of sense.
My understanding, unless things have changed, is that level boarding is preferred. If that’s still the case then with that in mind, CAF probably won’t last long on the shortlist and Hitachi might struggle too.
Northern has previously stated a preference toward level boarding, but since all units are 3+ vehicles all CAF would need to do is engineer a new centre car with a central lower section.
 
Last edited:

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,325
Location
"Marston Vale mafia"
My understanding, unless things have changed, is that level boarding is preferred. If that’s still the case then with that in mind, CAF probably won’t last long on the shortlist and Hitachi might struggle too. Stadler do level boarding as standard and Alstom have confirmed that it’ll be available on the Adessia platform too. Siemens have just made changes to the Desiro Verve so possible that they might also now offer level boarding.

Can't remember where I read it but I understand the Desiro Verve does now offer level boarding as an option.

== Doublepost prevention - post automatically merged: ==

Can’t wait for this new rolling stock to arrive and get rid of the old wrecks we’ve had to put up with for so long.
I just hope they order more longer trains, 2 and 3 car just aren’t long enough for a lot of the routes they’ve been serving.

I believe 3 and 4 are the intention. There aren't any UK 25kV 2 car EMUs, there's not enough underfloor space for all the gubbins I believe. There are enough 2 car 195s to cascade to secondary lines, which was the main reason, I understand, why the 195 fleet isn't all 3 car.
 
Status
Not open for further replies.

Top