Its a good point that there is disruption for people who don't benefit or could not see how they would benefit. It doesn't help that the government have been on and off about associated works that would have benefitted them. For example, Aylesbury would benefit from the connection to EWR and to OOC, but the government has not committed and even pulled Aylesbury out saying its not value for money (plus it needs hs2 phase 1 to start to have the capacity to get to MK/Northampton).
Kenilworth was expected to be doubled on the back of the capacity release Coventry-Birmingham, but again no commitment. Haul roads were going to converted to a route long cycleway at one point which would have been a fantastic idea and likely bring some visitors along the route and be useful for locals, but has gone.
The problem with these projected benefits is that they are detached from the scheme being pushed.
The cynical public will come to the conclusion that these projects will be quietly axed once HS2 gets what it wants.
Which turns out to be exactly what happened.
In order for people to believe the benefits will be delivered, they have to be an integral part of the scheme that the funder is proposing. As they were with Crossrail.
On the point of Luton though, it was already to gain from hs2 eastern branch, already has Thameslink. The route was more expensive, with fewer benefits. You can read about the considerations here
https://assets.publishing.service.g...c/hs2-review-of-route-selection-and-speed.doc. Any intermediate station between Birmingham and OOC would mean every service stopping there, increasing energy use and time, or would reduce the trains per hour. And what about the communities between Luton and Birmingham?
Well they would get stations too, if we follow the HS1 type of model.
A high speed train from London to Birmingham could stop at Luton, Milton Keynes, Northampton, Rugby and Coventry and still beat the WCML handily.
Also, does it matter if the trains stop multiple times if they are still faster than the alternative? A line that continued on that basis through Wolverhampton, Stafford, Stoke, Manchester, Huddersfield, Leeds and York would still beat the classic railway for essentially all journey combinations other than London-York, and even then it will get close.
The classic railway is pretty slow by modern HSR standards.
Not a supposed goal: the goal *IS* capacity. Capacity can be released not just on the wcml, which was the primary point, but also the cross country services and connecting TV/SW/South Wales to the north/scotland/east mids with additional speed to make hs2 via ooc more attractive for those journeys. Bypassing ecml via Birmingham would have also benefitted from that reduced journey time.
Unfortunately, given the collapse of the scheme, most of this capacity that has been provided will not be used.
That is another lesson - a scheme that defers the bulk of its benefits to the end of the scheme runs a serious risk of being cancelled before it can be realised.