No, it’s the section opening times. Have a look at 1H42 (2016 off Euston) for last Saturday night, add an hour and you will see what we mean.

Usually there is a bit of leeway built into the EAS times, to cater for late running trains (which is why NR don’t like to timetable any passenger train past 2300 at Stoke on a Saturday night) but the real problem here is the presentation time at Colwich. By the time any 2116 would turn up, the route is shut. It would be shut for a 2046 too.
Thanks. That makes sense.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,710
Location
UK
That is a classic case of the tail wagging the dog though. It is perfectly normal for "rules of the route" possession times to be shortened or even given up entirely when there is disruptive work happening on other routes.

Of course there is little incentive under the current structure to make later trains work. Even 20:15 is laughably early for the last train between the capital and the second/third (delete as per your view) city.
 

Blackpool boy

On Moderation
Joined
29 Apr 2024
Messages
197
Location
Blackpool
That is a classic case of the tail wagging the dog though. It is perfectly normal for "rules of the route" possession times to be shortened or even given up entirely when there is disruptive work happening on other routes.

Of course there is little incentive under the current structure to make later trains work. Even 20:15 is laughably early for the last train between the capital and the second/third (delete as per your view) city.
Its shockingly early and makes those of us who want to visit the capital for a day trip to have a not very l.ong day trip or be forced into staying over.. And with Sundays not much fun either in northernland we probably will not be visiting London much this year coming
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,145
Location
North London or Mildmay line
Its shockingly early and makes those of us who want to visit the capital for a day trip to have a not very l.ong day trip or be forced into staying over.. And with Sundays not much fun either in northernland we probably will not be visiting London much this year coming
To be fair the problem is really with Northern - as long as your destination is accessible via other operators Sundays are probably just about doable.
 

Blackpool boy

On Moderation
Joined
29 Apr 2024
Messages
197
Location
Blackpool
To be fair the problem is really with Northern - as long as your destination is accessible via other operators Sundays are probably just about doable.
You miss the point - we cant really have a day trip due to the early times for the last service to Manchester.
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,710
Location
UK
I’m well aware of that - I was questioning your statement about Sundays.
On Sundays the first train is 3 hours later than on other days of the week and to add insult to injury, the journey time is about 45 mins longer (2h55m vs ~2h10m usually) as you're crawling along the Slow Lines once south of Rugby.

The result is that you can't get to London much before lunchtime, so again it's tricky to have much of a day out. And the last train back is also earlier on a Sunday than on a weekday.
 

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,595
I don't think it's unfair for Network Rail to schedule maintenance on a Saturday night - yes it will affect people who want to go from Manchester to London and back in a single day on a Saturday, and stay out past 8pm, but that's a fairly small number compared to those using the network at other times. I certainly wouldn't want to be doing six hours of travel (even if there are no delays!) in one day if I could avoid it!

Granted once HS2 opens it will be a quicker journey and you'd have more people making the trip, but then again you would be able to leave London later and still make the cut off for going past Stoke!
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
I don't think it's unfair for Network Rail to schedule maintenance on a Saturday night - yes it will affect people who want to go from Manchester to London and back in a single day on a Saturday, and stay out past 8pm, but that's a fairly small number compared to those using the network at other times. I certainly wouldn't want to be doing six hours of travel (even if there are no delays!) in one day if I could avoid it!
Based on current schedules it would seem unreasonable not to expect a something like a 20:53 from Euston following the standard hour pattern of 1H39 (attached below)


This would be ahead of what looks like the current last Intercity) train (see below) through Stoke and Macclesfield.

Granted once HS2 opens it will be a quicker journey and you'd have more people making the trip, but then again you would be able to leave London later and still make the cut off for going past Stoke!
Depends if / when HS2 gets past Phase 1 including Euston
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,268
Based on current schedules it would seem unreasonable not to expect a something like a 20:53 from Euston following the standard hour pattern of 1H39 (attached below)

Not when you are on a two track railway (the slow lines) all the way from Euston to Hanslope. That adds about 30 minutes into your schedule and then you can’t get further than Colwich.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Not when you are on a two track railway (the slow lines) all the way from Euston to Hanslope. That adds about 30 minutes into your schedule and then you can’t get further than Colwich.
Go via Stafford and then as per the XC route to Manchester surely?
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,710
Location
UK
Not when you are on a two track railway (the slow lines) all the way from Euston to Hanslope. That adds about 30 minutes into your schedule and then you can’t get further than Colwich.
Once again it seems like cakeism to both close down the railway early and have a two track evening railway. It should be one or the other.
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,268
Unfortunately, this is what trying to plan services between Xmas and the new year often entails. You have to deal with multiple blocks or restrictions as well as the usual engineering shutdown periods.

Having to plan for a two track railway isn’t that uncommon for Saturday evening but, if you are a predominately fast line operator, it can also add a little complication into your resource planning if everything has to go via the slows.
 

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,595
I don't think it's unfair for Network Rail to schedule maintenance on a Saturday night - yes it will affect people who want to go from Manchester to London and back in a single day on a Saturday, and stay out past 8pm, but that's a fairly small number compared to those using the network at other times. I certainly wouldn't want to be doing six hours of travel (even if there are no delays!) in one day if I could avoid it!

Granted once HS2 opens it will be a quicker journey and you'd have more people making the trip, but then again you would be able to leave London later and still make the cut off for going past Stoke!


Depends if / when HS2 gets past Phase 1 including Euston
Once Phase 1 opens, won't the service from Old Oak Common to Manchester be significantly quicker than it is now? I realise that it will travel more slowly from Handsacre to Manchester than currently, but surely going so much quicker over the first 2/3 of the route will outweigh that?
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Once Phase 1 opens, won't the service from Old Oak Common to Manchester be significantly quicker than it is now? I realise that it will travel more slowly from Handsacre to Manchester than currently, but surely going so much quicker over the first 2/3 of the route will outweigh that?
Should be but whether it results in later services from London or just an earlier last arrival into Manchester who knows. We will have to wait and see.
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
Seems odd to use 222s on a route that is completely under the wires, is it not. Whilst Rail are speculating, it actually makes more sense, environmentally, for a refitted 350/2 (if they can be rated to 110)
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,268
The 350/2 units are not the kind of train that Lumo wants. They need end door stock for their business model and preferably something that could operate away from the wires.
 

Bill57p9

Member
Joined
1 Dec 2019
Messages
885
Location
Ayrshire
The 350/2 units are not the kind of train that Lumo wants. They need end door stock for their business model and preferably something that could operate away from the wires.
TPE ran their InterCity service between Manchester and Edinburgh/Glasgow with 350/4s quite happily for many years, though I do agree that end door stock is more appropriate for such routes (and Lumo have longer gaps between stops).
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
The 350/2 units are not the kind of train that Lumo wants. They need end door stock for their business model and preferably something that could operate away from the wires.
I get the "Long-Distance" style of train.... but LUMO currently only operate pure EMUs.
 

Blackpool boy

On Moderation
Joined
29 Apr 2024
Messages
197
Location
Blackpool
I certainly wouldn't want to be doing six hours of travel (even if there are no delays!) in one day if I could avoid it!
And yet we dont mind doing that - bit of breakfast and a nap on the train down - few beers and some food and a nap on the train home and if everything runs as it should we are home and in bed by 2330 ish.

Its not too bad a day out all round, apart from having to catch a matinee show
 