Sunday 22 December and not one Class 756 out in service today - absolutely appalling. Why?
I guess that depends whether there are any cancellations (or short forms) on the Valley Lines due to lack of rolling stock. If not then I am not sure why you would get worked up about it.Sunday 22 December and not one Class 756 out in service today - absolutely appalling. Why?
Loads of the new 756’s have been sitting around in sidings since summer 2023. It is now 5 weeks since they first entered service with usually 2 out per day. So, in 5 weeks no progress has been made in getting the rest of these trains into service. That means that 150’s usually working as 2 cars are serving the Aberdare and Merthyr routes at half hourly intervals which often means overcrowding.I guess that depends whether there are any cancellations (or short forms) on the Valley Lines due to lack of rolling stock. If not then I am not sure why you would get worked up about it.
Sunday 22 December and not one Class 756 out in service today - absolutely appalling. Why?
You don’t know that no progress has been made. There are daily non-passenger workings of the stock between Cardiff and Aberdare. Presumably that is progress of some sort, even if it hasn’t translated into more passenger workings just yet.Loads of the new 756’s have been sitting around in sidings since summer 2023. It is now 5 weeks since they first entered service with usually 2 out per day. So, in 5 weeks no progress has been made in getting the rest of these trains into service.
I think pretty much every new fleet at every TOC nationwide when it's been in the early days of introduction has been weekday only at first.I seem to recall when the 231s were introduced they initially stayed at home on Sundays.
You don’t know that no progress has been made. There are daily non-passenger workings of the stock between Cardiff and Aberdare. Presumably that is progress of some sort, even if it hasn’t translated into more passenger workings just yet.
I think they’ve also been stung on previous PR announcements which have turned out to be untrue/ not deliverable. All these things together completely undermine confidence.It's true we don't know if there's been any progress.
And that's the problem with TfWs policy of a lack of transparency and generally limiting their announcements to things that are good PR.
Easy enough to assume incompetence in the absence of information to the contrary.
I think they’ve also been stung on previous PR announcements which have turned out to be untrue/ not deliverable. All these things together completely undermine confidence.
The reliability of the railway in Wales under TfW has also been appalling. You only have to look at the Ebbw Vale to Newport service as an example- it’s cancelled frequently. How can you expect to build a ridership when people can’t rely on a service actually turning up.
I very much suspect that the Stadler support engineers don't work Sundays.I seem to recall when the 231s were introduced they initially stayed at home on Sundays.
Rubbish and ridiculous.Sunday 22 December and not one Class 756 out in service today - absolutely appalling. Why?
It's not clear whether your comment applies to the post you've replied to, or to the situation it describes?Rubbish and ridiculous.
Apologies. I agree with the OP. The fact we’re a week away from January 2025 and all TAM services are 150s is laughable.It's not clear whether your comment applies to the post you've replied to, or to the situation it describes?
That would seem a very good reason.I very much suspect that the Stadler support engineers don't work Sundays.
I can imagine that Stadler have three roving engineers available weekdays so if they are travelling with the 756 then that limits operations to three 756s (or two if being a bit cutious about sick leave). Once an individual 756 has really done a lot of fault free miles and gained everyones trust then I can imagine a roving engineer can move on to babysitting a fourth 756 and so on. So are operations perhaps still building up confidence in each individual 756 ?.That would seem a very good reason.
Does not really justify a slow rollout on weekdays though. That is the more disappointing thing in terms of visible progress.
All electric, either directly from the wires or from battery during the sections where there are no overhead wires or they are permanently earthed.Where on the current Merthyr-Aberdare and Aberdare-Merthyr diagrams does the transition between diesel and electric occur?
That’s exactly the scenario I would expect. And if one engineer is not at work for any reason then the three drops to two.I can imagine that Stadler have three roving engineers available weekdays so if they are travelling with the 756 then that limits operations to three 756s (or two if being a bit cutious about sick leave). Once an individual 756 has really done a lot of fault free miles and gained everyones trust then I can imagine a roving engineer can move on to babysitting a fourth 756 and so on. So are operations perhaps still building up confidence in each individual 756 ?.
In the same way that “battle plans never survive first contact with the enemy”, new tra8ns never survive first contact with the general public! Hence why engineers are needed.I thought that the 756’s had been doing test runs on the electrified mainline between CDF & STJ and even Swindon. Surely, the Stadler engineers would have been on these test runs to sort out any issues? That being so, I would have thought they could have started to enter passenger service without the need for Stadler engineers to be in attendance?
So, we begin another week with again only two in service today (Monday 23 December). Perhaps the Swiss don’t have much confidence in their trains?
I thought that the 756’s had been doing test runs on the electrified mainline between CDF & STJ and even Swindon. Surely, the Stadler engineers would have been on these test runs to sort out any issues? That being so, I would have thought they could have started to enter passenger service without the need for Stadler engineers to be in attendance?
All electric, either directly from the wires or from battery during the sections where there are no overhead wires or they are permanently earthed.
== Doublepost prevention - post automatically merged: ==
Thanks. I phrased my question very poorly (and I believe that the diesel generators were definitely running when I rode 756111 from CDF to NNP on the 28th of November).
Given how they've been sat around since finishing their mileage accumulation runs it wouldn't surprise me that they'd want an engineer on hand in case of any niggles that may have appearedI thought that the 756’s had been doing test runs on the electrified mainline between CDF & STJ and even Swindon. Surely, the Stadler engineers would have been on these test runs to sort out any issues? That being so, I would have thought they could have started to enter passenger service without the need for Stadler engineers to be in attendance?
So, we begin another week with again only two in service today (Monday 23 December). Perhaps the Swiss don’t have much confidence in their trains?
They don’t use diesel at all on this route. When off overhead wire, they use electricity stored in the battery - although they do have a diesel for emergency use only.Where on the current Merthyr-Aberdare and Aberdare-Merthyr diagrams does the transition between diesel and electric occur?
I’d flip the narrative having lived and worked in Switzerland. I’d say the Stadler engineers are ensuring the customer is happy with the operation and quality of the build so that when in service the trains offer the quality and standard a passenger expects!
Once these are all in service I’m sure the passenger/customer will love them.
They’re lovely trains but have Stadler/TfW never heard of light diffusers? They make the 800s seem atmospheric. See Crossrail class 345s for how to light the interior of a train carriage.From what I've seen people have been very happy with the 231s.
By my count, nine different units have carried passengers. I've travelled on eight of them. They have all worked fine when I have been on them. But I'm inclined to agree with your point in general.I can imagine that Stadler have three roving engineers available weekdays so if they are travelling with the 756 then that limits operations to three 756s (or two if being a bit cutious about sick leave). Once an individual 756 has really done a lot of fault free miles and gained everyones trust then I can imagine a roving engineer can move on to babysitting a fourth 756 and so on. So are operations perhaps still building up confidence in each individual 756 ?.
Yes. My feeling is the Swiss don't rush into risky promises and i prefer that approach.I’d flip the narrative having lived and worked in Switzerland. I’d say the Stadler engineers are ensuring the customer is happy with the operation and quality of the build so that when in service the trains offer the quality and standard a passenger expects!
Once these are all in service I’m sure the passenger/customer will love them.