Trainman40083
Established Member
Moderator note: Split from
www.railforums.co.uk
Hope Valley Capacity Scheme updates
I imagine freight trains have timetables just like passenger trains, and only get changed at certain times, else the trains could conflict along the route. Maybe the new loop allows for extra trains that are yet to run. Indeed. There has of course been such a change and is another in a few...
You sum it up perfectly... Add in lack of capacity at Manchester Piccadilly and Sheffield. If only fast trains, that do not stop had another route.I still, bringing this thread back to life a bit, can't imagine the idea that anyone would ever think a 4th passenger train per hour with the current set up is a good idea.
The Chinley junctions are an absolute nightmare with their slow line speeds and the absolute block to/from Edale and the freight rarely actually manages to achieve it's scheduled running times, usually because the Northern stopper running late causes it to stop/start on the gradients.
I cannot remember the last time I worked a train that wasn't 15 minutes late into Stockport because it left Sheffield on time and then got stuck at Edale waiting for something to crawl round to Peak Forest, usually itself been delayed by the Northern stopper either having been held for TPE or lost time itself, then setting off the chain of getting stuck at Hazel Grove behind the train from Buxton, Slade Lane behind the Chester and the Barrow/Windermere and then messing up the CLC local train as well as that gets held at Oxford Road or Glazebrook.
It's deeply tedious and if I never had to work a train on the route with the current schedule again it would be a delight - for a perfect working example check out 2S81 1214 Sheffield - Man Picc today losing time en route with apparently slow station work, delaying the following freight bound for Tunstead and trashing the EMR 1R66 0856 Norwich - Liverpool which left Sheffield on time.
Last edited by a moderator: