Porterbrook Cl.769 'Flex' trains from 319s, initially for Northern

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,882
Location
Liverpool, UK
Well, the information about the two former TfW 769s being supplied by Porterbrook at no cost to Northern came from two Porterbrook engineering managers in the presence of severalbly cost more to send them to Sims than give them to Northern. Northern managers. That meeting was about a month ago and I have no further updates as to progress. I do know that it was planned that the two sets were expected to be with Northern by sometime in December and that they plan to have 6 sets in traffic each day after their arrival.
Makes sense. It would probably cost more to send them to Sims than give them to Northern.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Gricer99

Member
Joined
21 Jun 2020
Messages
327
Location
Hindley
Seems like the only ones out today are 431, 442, 448, 456.

Not seen 424 for ages. Has it been scrapped?
 

380101

Member
Joined
18 Feb 2015
Messages
1,141
Presumably still at Kilmarnock?

There's 2 ex TFW ones at Brodies now in what looks to be Northern base grey livery. They've been at Kilmarnock since late October/early November. No seats currently fitted, and they have been out on test runs daily for the last week or 2 coupled up to one of the ex GWR 769s that are in what looks to be ScotRail base blue livery.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,653
Location
Hampshire
There's 2 ex TFW ones at Brodies now in what looks to be Northern base grey livery. They've been at Kilmarnock since late October/early November. No seats currently fitted, and they have been out on test runs daily for the last week or 2 coupled up to one of the ex GWR 769s that are in what looks to be ScotRail base blue livery.
I believe the two ex TfW examples are destined for Varamis Rail. They, also being Diesel only, would be less useful for Northern than their ex GWR brothers which retain their AC capabilities.
 

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
There's 2 ex TFW ones at Brodies now in what looks to be Northern base grey livery. They've been at Kilmarnock since late October/early November. No seats currently fitted, and they have been out on test runs daily for the last week or 2 coupled up to one of the ex GWR 769s that are in what looks to be ScotRail base blue livery.
769s ran test runs to Southport with no seats fitted. Presumably the GWR unit is for rescue purposes, because they are running under wires and the TfW units had their pantographs removed. That blue is ScotRail base blue, because it was spare paint lying around at Brodies and they couldn’t stay green. They haven’t been leased by ScotRail, although that is obviously Porterbrook’s intention.
I believe the two ex TfW examples are destined for Varamis Rail. They, also being Diesel only, would be less useful for Northern than their ex GWR brothers which retain their AC capabilities.
Varamis Rail won’t take 769s. They make big of their all electric fleet and Diesel capability isn’t part of their business model. The TfW units are no less AC capable than the Northern units, minus a pantograph, which would need replacing anyway because they have never carried the Brecknell Willis type.

The GWR units aren’t suitable for Northern because of all the additional work done to make them 3rd rail immunised in Diesel mode, which makes them too different from the units already at Northern. This wouldn’t be an issue if they were leased by another operator e.g. ScotRail.
 

380101

Member
Joined
18 Feb 2015
Messages
1,141
769s ran test runs to Southport with no seats fitted. Presumably the GWR unit is for rescue purposes, because they are running under wires and the TfW units had their pantographs removed. That blue is ScotRail base blue, because it was spare paint lying around at Brodies and they couldn’t stay green. They haven’t been leased by ScotRail, although that is obviously Porterbrook’s intention.

Aye, the ex GWR unit will be for rescue purposes, but not because they have a pantograph, as they are being tested on the G&SW between Kilmarnock and Dumfries which is not wired, but more likely because the ex GWR ones have already been extensively tested after improvement works by Brodie Engineering over the last 12months and are deemed more reliable.

They have done limited tests on the Ayr line, but mostly on the Kilmarnock-Dumfries route due to more path availability.
 

diligentdave

Member
Joined
20 Oct 2007
Messages
444
The 2 units at Brodies are destined (so I'm told) for Scotrail. The ex-GWR one I'm not sure where it's going but it's not Northern. The 2 for Northern are currently at Long Marston (421 & 452 if I remember rightly) and will (eventually) move to Crewe Electric for works to refit the pantographs and carry out a transformer oil change (along with other AC related tasks) before delivery to Northern to cover for units in the C6 program. Although that has to happen fairly soon because the C6 program on Northern units begins in January (at Brodies).
 

GhostManDN91

Member
Joined
2 Oct 2022
Messages
147
Location
Wigan
Interesting. What does the C6 program involve? I'm not sure if it's been posted on here.
The 2 units at Brodies are destined (so I'm told) for Scotrail. The ex-GWR one I'm not sure where it's going but it's not Northern. The 2 for Northern are currently at Long Marston (421 & 452 if I remember rightly) and will (eventually) move to Crewe Electric for works to refit the pantographs and carry out a transformer oil change (along with other AC related tasks) before delivery to Northern to cover for units in the C6 program. Although that has to happen fairly soon because the C6 program on Northern units begins in January (at Brodies).
 

nightflyian

Member
Joined
12 Oct 2021
Messages
35
Location
Southport
Many thanks for the updates. Interesting reading. I assuming the reason for removing the 3rd rail power is because they can potentially use platform 3 at Southport which is primary used by Merseyrail for Liverpool bound trains and is 3rd rail enabled but is occasionally used by Northern for Wigan bound trains ?
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,195
Many thanks for the updates. Interesting reading. I assuming the reason for removing the 3rd rail power is because they can potentially use platform 3 at Southport which is primary used by Merseyrail for Liverpool bound trains and is 3rd rail enabled but is occasionally used by Northern for Wigan bound trains ?
Which units are having third rail pickup removed?
 

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
Aye, the ex GWR unit will be for rescue purposes, but not because they have a pantograph, as they are being tested on the G&SW between Kilmarnock and Dumfries which is not wired, but more likely because the ex GWR ones have already been extensively tested after improvement works by Brodie Engineering over the last 12months and are deemed more reliable.

They have done limited tests on the Ayr line, but mostly on the Kilmarnock-Dumfries route due to more path availability.
There are also wires north of Barrhead.

Apparently the GWR units have been tested in both modes on all of the G&SWR lines. It tends to be useful to run under the wires, so to solve any issues they can just raise the pantograph. It remains to be seen whether the TfW units at Kilmarnock, or the Northern units will receive the same improvements.
Many thanks for the updates. Interesting reading. I assuming the reason for removing the 3rd rail power is because they can potentially use platform 3 at Southport which is primary used by Merseyrail for Liverpool bound trains and is 3rd rail enabled but is occasionally used by Northern for Wigan bound trains ?
It’s nothing to do with that. All 319s had their 3rd rail shoes removed when they were returned to Porterbrook off lease by Thameslink, before any of them entered service with Northern and before the 769 conversion was devised. At that time they could not run to Southport and did not encounter any third rail.

The GWR 769s had additional work to reinstate DC equipment that the Northern and TfW units didn’t, because the line they were intended to run on, the North Downs line is a mixture of 3rd rail and unelectrified sections.

It would be nice on an integrated railway if the failed 769s that have been stranded at Southport for weeks at a time could have run back to Allerton the most direct route via Liverpool Central, under their own power using the 3rd rail, rather than having to wait to be dragged back to Springs Branch, although some have been able to be taken on the back of an in service train.

It seems to be standard to remove 3rd rail equipment from off lease fleets dual voltage that may be leased again outside the Southern Region. The same was done with 365s.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,882
It seems to be standard to remove 3rd rail equipment from off lease fleets dual voltage that may be leased again outside the Southern Region. The same was done with 365s.
Yes, because if you don't the shoes tend to get removed anyway as the permanent way (ballast shoulders etc) aren't maintained to be clear of where a third rail shoe would be.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,195
There are also wires north of Barrhead.

Apparently the GWR units have been tested in both modes on all of the G&SWR lines. It tends to be useful to run under the wires, so to solve any issues they can just raise the pantograph. It remains to be seen whether the TfW units at Kilmarnock, or the Northern units will receive the same improvements.

It’s nothing to do with that. All 319s had their 3rd rail shoes removed when they were returned to Porterbrook off lease by Thameslink, before any of them entered service with Northern and before the 769 conversion was devised. At that time they could not run to Southport and did not encounter any third rail.

The GWR 769s had additional work to reinstate DC equipment that the Northern and TfW units didn’t, because the line they were intended to run on, the North Downs line is a mixture of 3rd rail and unelectrified sections.

It would be nice on an integrated railway if the failed 769s that have been stranded at Southport for weeks at a time could have run back to Allerton the most direct route via Liverpool Central, under their own power using the 3rd rail, rather than having to wait to be dragged back to Springs Branch, although some have been able to be taken on the back of an in service train.

It seems to be standard to remove 3rd rail equipment from off lease fleets dual voltage that may be leased again outside the Southern Region. The same was done with 365s.
I don’t know what your comment about ”integrated railway” means.

As has been pointed out several times, the 769/9s have some significant technical differences to the ’original’ Northern 769s. I’m not aware of any intention to convert any further units to 769/9 spec.
 

nightflyian

Member
Joined
12 Oct 2021
Messages
35
Location
Southport
Thanks for the info on the removal of the 3rd rail power systems. And agree it would be nice if they could of run via the Liverpool line on the3rd rail for maintenance reasons as well as when the Wigan to Southport line is blokced or flooded like the other week.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,795
Location
Somewhere, not in London
As D365 has said several times now, it is not a simple job to even only add the 3rd rail capability "back" to a 769, let alone complete the full suite of work to create a 769/9.

The wiring just simply isn't there to do it, so a lot more cables and big switches need to be added to make them into a 'tri-mode' unit.
 

Bob Price

Established Member
Joined
8 Aug 2019
Messages
1,243
5Q42 headed today from Long Maston to Crewe Electric Traction Maintenance Depot. 37884 towing ex TfW 769421. Interesting.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,645
Location
Rochdale
5Q42 headed today from Long Maston to Crewe Electric Traction Maintenance Depot. 37884 towing ex TfW 769421. Interesting.

Keep an eye out for something coming south from Kilmarnock as presumably they have finished fettling 769006 and this is the second one to go have some love and care before it gets going with Northern.
 

david l

Member
Joined
27 Dec 2016
Messages
475
Location
Wigan
The cavalry are certainly needed as there are 0 (none, nothing, zilch, nowt, f*all) 769's in Northern service today of the 6 diagrams, with loads of (diesel 15X) short forms on Southports today. In the past diesel replacements have been mainly 4 car, with some 2's, but nearly all appear to be 2's today.
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
6,083
The cavalry are certainly needed as there are 0 (none, nothing, zilch, nowt, f*all) 769's in Northern service today of the 6 diagrams, with loads of (diesel 15X) short forms on Southports today. In the past diesel replacements have been mainly 4 car, with some 2's, but nearly all appear to be 2's today.

Yet Journey check is saying 0 train formation updates!
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,891
Location
Cambridge
The cavalry are certainly needed as there are 0 (none, nothing, zilch, nowt, f*all) 769's in Northern service today of the 6 diagrams, with loads of (diesel 15X) short forms on Southports today. In the past diesel replacements have been mainly 4 car, with some 2's, but nearly all appear to be 2's today.
The sooner the MK3 bodied stock replacements are ordered the better.
 

Class777

Member
Joined
18 Mar 2023
Messages
46
Location
Merseyside
769424 is out today, Southport - Stalybridge which is nice to see. It’s one I still need to tick off.

Does anyone know yet what is happening to 421? I’ve heard going to Northern for extra capacity but I’m unsure as it’s platform wibble.
 

50002Superb

Established Member
Joined
18 Aug 2021
Messages
2,132
Location
Nottingham
769424 is out today, Southport - Stalybridge which is nice to see. It’s one I still need to tick off.

Does anyone know yet what is happening to 421? I’ve heard going to Northern for extra capacity but I’m unsure as it’s platform wibble.
Read six posts above
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
651
Location
Hull
769424 is out today, Southport - Stalybridge which is nice to see. It’s one I still need to tick off.

Does anyone know yet what is happening to 421? I’ve heard going to Northern for extra capacity but I’m unsure as it’s platform wibble.
Post #6940 above indicates Northern are gaining two extra 769's but only as cover for C6 work on their existing units, so not extra capacity as such.
 