swrfanatic
On Moderation
Isn't something that i've been used to is all almost showing the door for the guards.
Can you elaborate, because I don't understand? Which door? On the train?Isn't something that i've been used to is all almost showing the door for the guards.
I haven't got a clue what he's trying to say eitherCan you elaborate, because I don't understand? Which door? On the train?
On top of that, we already know that the words 'build quality issues' and Derby seem to go hand in hand. This being on top of the somewhat odd approach of nearly completing a unit, sending it away to release space in Derby to complete more units, only to drag it back again at a later date for completion and final testing.It’s not all down to Alstom; there’s a number of modifications required to make each unit ”fit for service”. Responsibility for each modification ’package’ is agreed between Alstom and SWR.
No different to the 700s and 707s. I agree that the facing bay seats are too close, but it's the same across all those units.I've now had the misfortune of sitting on a busy 701 twice. The seats are so tight that two people side by side is uncomfortable when one has a thick coat on. The facing seats in the 4 seat bays also seem nearer than on other modern units given the amount of knee touching going on.
Unfortunately they are people movers, I've noticed they look much busier due to a lack of seating compared with other stock but can certainly fit more people on them.I've now had the misfortune of sitting on a busy 701 twice. The seats are so tight that two people side by side is uncomfortable when one has a thick coat on. The facing seats in the 4 seat bays also seem nearer than on other modern units given the amount of knee touching going on.
A poor & short sighted decision by those in charge, particularly as the time, money & effort invested in obtaining the agreements, hardware, training & additional staff flexibility all appear to have been wasted.
As an SWR user I'm personally very happy that it looks like introduction is going to sped up. The need for the increased capacity that will be brought by these trains is getting critical. This no doubt had a significant influence on the decision.I’d suggest this particular decision (to change course) seems pragmatic and sensible, given what a debacle the whole introduction had become. I’m sure most SWR users will be pleased to just get these trains into service, regardless of method of operation.
It should have been abandoned at a much earlier stage once it was clear it wasn’t going to be possible to implement within a realistic time period. Throwing money away leasing brand new stock sitting idle in sidings was a scandalous waste of money, and I suspect will have exceeded the cost of training etc. (much of which will be required anyway upon a new fleet introduction, irrespective of DCO or guarded operation).
Imagine sitting on it all the way to Bracknell or WokinghamI've now had the misfortune of sitting on a busy 701 twice. The seats are so tight that two people side by side is uncomfortable when one has a thick coat on. The facing seats in the 4 seat bays also seem nearer than on other modern units given the amount of knee touching going on.
There are trade offs made for a more comfortable standing experience. For example, the larger than usual gap between the vestibule and where the seats start allows for significantly more standing room and less crush. If you’re on one in rush hour they feel a lot less crammed, as some others have commented on here and on youtube. However this comes with the downside of less room in the seats and window alignment. No more so than similar offerings like the Desiro City though, and personally I find the seats themselves a lot more comfortable too, so it’s still an upgrade from the comparable competition imoUnfortunately they are people movers, I've noticed they look much busier due to a lack of seating compared with other stock but can certainly fit more people on them.
It does seem that at various stages of the class 701 project unrealistic demands/expectations have been forced upon reality.On top of that, we already know that the words 'build quality issues' and Derby seem to go hand in hand. This being on top of the somewhat odd approach of nearly completing a unit, sending it away to release space in Derby to complete more units, only to drag it back again at a later date for completion and final testing.
I've now had the misfortune of sitting on a busy 701 twice. The seats are so tight that two people side by side is uncomfortable when one has a thick coat on. The facing seats in the 4 seat bays also seem nearer than on other modern units given the amount of knee touching going on.
I don't get that - face-to-face passengers are sharing the same footspace - even four adult feet are not as wide as a seatAnd yes - zero leg room if a bay has four in it.
Doubt it, so many of the trained drivers are going out of competency as so few units to drive that many will need retraining.So with 600 drivers left to do, all done by the end of next year. Which publicly-owned SWR will take credit for.![]()
Nope, the 707s were fine.No different to the 700s and 707s. I agree that the facing bay seats are too close, but it's the same across all those units.
**speedAs an SWR user I'm personally very happy that it looks like introduction is going to sped up. The need for the increased capacity that will be brought by these trains is getting critical. This no doubt had a significant influence on the decision.
Some of us won't have to (imagine it)come this time next yearImagine sitting on it all the way to Bracknell or Wokingham
You’re correct. These 701s are seeming worse by the day!Nope, the 707s were fine.
You can clearly see there is more legroom with the Siemens, looks like the seats are a bit bigger too.You’re correct. These 701s are seeming worse by the day!
There’s definitely more legroom, although I can’t really agree with the seats being bigger as it’s the exact same frame just with different paddingYou can clearly see there is more legroom with the Siemens, looks like the seats are a bit bigger too.
It should have been abandoned at a much earlier stage once it was clear it wasn’t going to be possible to implement within a realistic time period. Throwing money away leasing brand new stock sitting idle in sidings was a scandalous waste of money,
Maybe your right or perhaps it was managed poorly by all parties in full knowledge the new government preoccupied with its major nationalisation plan was willing to pull the plug if things were tough, who knows?, we are where we are![]()
There’s definitely more legroom, although I can’t really agree with the seats being bigger as it’s the exact same frame just with different padding
== Doublepost prevention - post automatically merged: ==
Here’s hoping these trains aren’t around very long, if they ever are around that is![]()
Yeeeeeeah, the railway gets that a lot honestly.It sounds like the comments are also falling into the U Turn trap.
A decision is made.
It is not popular/it has problems.
You barrel away at it anyway, you are seen as arrogant/inflexible/out of touch/etc
You change plan after trying the first way, you are seen as indecisive/wasteful/etc
It sounds like the comments are also falling into the U Turn trap.
A decision is made.
It is not popular/it has problems.
You barrel away at it anyway, you are seen as arrogant/inflexible/out of touch/etc
You change plan after trying the first way, you are seen as indecisive/wasteful/etc
or even the previous one................The problems go back well before the last election, though,
True but haven’t those type of shenanigans long been a problem & have more to do with how the railways are funded, Regional Eurostar comes to mind in BR timesThat’s true of course but, with the delays as extensive as they are, the failure to change course earlier starts to feel a little ideological, with a generous of dollop of “it’s not our money, so who cares if we waste it”, mixed in.
Oh where, oh where is the 'like' button!or even the previous one................