So we can't have anymore rail services essentially? That's going to help growth and modal shift.
No, we can't expect a blank cheque to chase that objective.
Yes fares could be changed but its tinkering around the edges. HS2 is about the future and delivering a better railway not just maintaing the status quo.
Then we have to get into a discussion about what a "better" railway is.
I would argue that we have to deliver the most transport services we can, at the lowest possible cost to society (be that be obtained through farepayers or taxpayers).
HS2 does not seem to aid this objective, as it does little to reduce the enormous cost base issues that the conventional railway has.
I really don't want to relitigate this, but if we look at to Japan as an example, they utilise high speed rail to achieve reductions in the cost of the overall railway system by replacing old infrastructure.
I don't see the WCML remaining empty. Milton Keynes is likely to see significant growth and the government is looking to build houses. A capacity relieved WCML is a great way to facilitate that.
The WCML won't remain empty.
It is HS2 that will remain half empty, because without the sprawling system included in Phase 2, it can't possibly be filled.
Meanwhile the WCML will have to retain the bulk of its existing timetable for connectivity reasons.
We will end up with a half full HS2, next to a WCML that remains heavily loaded (so no reduction in fixed costs will be possible), but will have lost a huge portion of its revenue.
HS2 will siphon off the lucrative flows and leave the associated costs with the classic railway.
The result will likely be a net worsening of the railway's financial position.
If we want to provide capacity to Milton Keynes or other cities on the southern WCML,
we should serve them.
Time and again, it has been shown that railways that want to be succesful have to go where the customers are.
HS2 decides to ignore all the establish load centres (one of which, MK, is the biggest single flow by passenger count out of Euston) on the southern WCML to go cut through an AONB instead.
Of course it needs phase 2a to make the most of the capacity and allow services to carry on to Stoke and Crewe for onward connections.
Well yes, but thats mostly because the phasing on HS2 has been really badly done.
There seems to have been very little consideration given to what happens if the government doesn't fund the later phases.
For an example, Phase 1 deciding to randomly terminate <20km short of Colwich, creating a bottleneck that could have been avoided for comparatively little additional spending.
Then again, Phase 2A didn't even exist until later. In the original plans it was Handsacre or Golborne!