Would electrifying the WEML, Marshlink, North Downs and Uckfield lines with third rail be possible under the ORR's current policy?

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
36,015
If only the powers that be had listened to you then, we would have some nice BEMUs going up and down over the North Downs Line, to Uckfield and over the Marshlink.

I wasn’t telling the powers that be.

All I was saying is that in response to the calls on these pages to electrify Uckfield, N Downs and Ashford - Ore, my response here has always been “it will be battery trains“.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
22,000
Location
Airedale
I am criticing the study for not considering the best options, rather than directly suggesting that such a service should exist. Their first option had 3tph Reading to Redhill with 2tph through to Gatwick.
First, did it conclude that 3tph to Redhill was practicable (bearing in mind the long-running level crossings saga?)?
EDIT: resolved by NR according to the study.
Second, would the increased traffic plus possible economies from running a Tonbridge-Guildford(-Reading) stopper make a significantly better business case for both parts of the route?
 
Last edited:

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,427
There was a fast and a slow service which left Reading 30 minutes apart, and the slow service would just would just miss the connection to Tonbridge, and the fast train would not be far behind it. The fastest service between Reading and Redhill is now slower than it used to be, because one train an hour is faster west of Guildford, and the other east.
It is a better timetable in many ways because it only uses 7 units and doesn't 'waste' any of those carrying fresh air between Guildford and Redhill. It is very apparent that a Gatwick train loads better than one terminating at Redhill even if the service has been slowed down by 10 minutes.

This option would also produce a saving since the number of trains on the Redhill-Tonbirdge could probably be reduced from 2 to 1 through inter working since the service takes 32 minutes end to end, which does not work well for stock utilation as an hourly shuttle.
There would still need to be five trains in cycle between Reading and Tonbridge because I don't think the round trip can reliably be brought under two hours if it is the stopper, so unlikely to save a unit.
 

WAO

Established Member
Joined
10 Mar 2019
Messages
1,245
I'm not that impressed by business plans as they seem to reflect the prejudices of their authors, with costs and benefits chosen to make the desired case. I'm surprised that this was even attempted for the ND line as there is no agreed understanding as yet of the acceptability or otherwise of more third rail. The ND line is probably always going to be a railway basket case; non-London, serving wayside stations with a few medium sized towns, without the speed, heavy patronage, high fares or long distance that justify railways economically. Historically, post-steam, it had those most penitential of units, the Tadpoles, 1.5 narrow ex-Hastings cars with an EPB DTSO locked out of use! The present Turbos are a vast improvement but can struggle with peak flows (school children) and airport passengers and luggage. If there is a lack of capacity then a longer consist is called for rather than a more frequent (and costly) service. One would hope that future EMU builders would provide universal passive battery provision (including in software) so that common user stock could fill in for juice-less gaps. That way, the choice of electrification could be made later on the basis of experience of cost and operation. My hunch is that only the Reading - Guildford section would be sparked as it seems to be much more densely inhabited and so heavily used, with the batteries in use for the rural section after Shalford Jn.

Electrification should be an engineering not a theological decision.

WAO
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,427
My hunch is that only the Reading - Guildford section would be sparked as it seems to be much more densely inhabited and so heavily used, with the batteries in use for the rural section after Shalford Jn.
As pointed out before there is a long stretch of route between Wokingham and Ash which has steel sleepers, increasing the cost of electrification.
 

JamesRowden

Established Member
Joined
31 Aug 2011
Messages
1,766
Location
Ilfracombe
There would still need to be five trains in cycle between Reading and Tonbridge because I don't think the round trip can reliably be brought under two hours if it is the stopper, so unlikely to save a unit.
Interwork with the Reading-Gatwick. There's presently a 27 minute turn around at Reading.

Select calling patterns that create an optimum compromise.

Not saying that this will be better than keeping things as they are. Just saying that the study didn't show that it wouldn't.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
36,015
Electrification should be an engineering not a theological decision.

Quite. And on this line, the engineering is clear - battery trains. Thats what the economics also says, when it come to the time the trains need replacing.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,616
Location
Taunton or Kent
Quite. And on this line, the engineering is clear - battery trains. That's what the economics also says, when it come to the time the trains need replacing.
The time they "need" replacing is now, however they haven't been because of a shambolic replacement attempt so far and an order that's still 5-7 years away, if it actually gets approved.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
22,000
Location
Airedale
Not saying that this will be better than keeping things as they are. Just saying that the study didn't show that it wouldn't.
Given that the 3rd tph Guildford-Redhill had a poor business case anyway even though it required only 1 extra unit compared with just Reading-Guildford, extending it to Tonbridge wouldn't have been worth pursuing.
 

WAO

Established Member
Joined
10 Mar 2019
Messages
1,245
Quite. And on this line, the engineering is clear - battery trains. Thats what the economics also says, when it come to the time the trains need replacing.
...that's what it says on paper/computer model but has it been proved yet, physically and commercially, in a UK environment?

I can think of four separate (disjointed?) applications/trials at the moment (five if the 400 group at the East Kent is counted!). UK industry has a habit of doing its R&D on the customer rather than offering a proven working product.

The BEMU project really must be taken forward to its natural limit.

WAO
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
36,015
that's what it says on paper/computer model but has it been proved yet, physically and commercially, in a UK environment?


yes. Merseyrail, Birmingham trams. Coming soon to the valleys and the ECML.


Terrible idea. Its better to fill the holes we have on the railway with whatever electrification makes sense so we can get a more standardized fleet.

Your opinion. Perhaps ask Merseyrail how on earth they cope with their units that have traction batteries on.
(All EMUs already have batteries on board, incidentally).
 

WAO

Established Member
Joined
10 Mar 2019
Messages
1,245
yes. Merseyrail, Birmingham trams. Coming soon to the valleys and the ECML.
A mile in Lancashire and some LRT, with a "coming soon" is not yet a basis for a large UK network wide capital spend.

Better get it right first, know its limits, then you can bury all the peripheral fixed electrification schemes for good.

WAO
 

Bikeman78

Established Member
Joined
26 Apr 2018
Messages
6,205
yes. Merseyrail, Birmingham trams. Coming soon to the valleys and the ECML.
Already up and running on the valleys.


Your opinion. Perhaps ask Merseyrail how on earth they cope with their units that have traction batteries on.
(All EMUs already have batteries on board, incidentally).
Maybe hold off on using the class 777s as an example until they cease to be the least reliable fleet on the network.
 

Mgameing123

Member
Joined
29 Apr 2023
Messages
1,070
Location
Denmark
yes. Merseyrail, Birmingham trams. Coming soon to the valleys and the ECML.




Your opinion. Perhaps ask Merseyrail how on earth they cope with their units that have traction batteries on.
(All EMUs already have batteries on board, incidentally).
Its also huge waste of money that they DIDN'T electrify Headbolt Lane. We all know Overhead Wires isn't coming on the third rail network for a good 100 years so there is no point in being hesitant to not use third rail if its the best option.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,686
Location
Northampton
Its also huge waste of money that they DIDN'T electrify Headbolt Lane. We all know Overhead Wires isn't coming on the third rail network for a good 100 years so there is no point in being hesitant to not use third rail if its the best option.
Batteries are a better option than third rail in most applications where third rail might be considered, although I am on the third rail side for Headbolt Lane.

As I have said before short extensions of c.1-2km 'around the corner' at the North Downs (Wokingham Jn, Ash Jn, Shalford Jn), Hurst Green, Ashford, etc., should be permitted to give battery stock just a little bit more margin, but ultimately battery technology in other vehicles is fairly proven stuff, it's used in trains internationally and the sooner it is scaled up in the UK so people say 'oh it works fine, huh' the better.

I am also in favour of ALL EMUs being fitted with batteries capable of providing traction power for an emergency scenario to allow trains to be platform in the event of the power being turned off, and therefore the electric train fleet would consist entirely or BEMUs, some of which were simply a 'long range' variant having more batteries.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
36,015
Its also huge waste of money that they DIDN'T electrify Headbolt Lane. We all know Overhead Wires isn't coming on the third rail network for a good 100 years so there is no point in being hesitant to not use third rail if its the best option.

and what about where it isn’t the brst option - such as North Downs, Uckield etc?

== Doublepost prevention - post automatically merged: ==

A mile in Lancashire and some LRT, with a "coming soon" is not yet a basis for a large UK network wide capital spend.

No one is auggesting large UK network wide capital spend.

But you can assume that traction batteries will be fitted to most if not all new EMUs ordered from now on. It is so chepa compared to the cost of the train, and offera many benefits, not least in disruption.
 

Mgameing123

Member
Joined
29 Apr 2023
Messages
1,070
Location
Denmark
and what about where it isn’t the brst option - such as North Downs, Uckield etc?

== Doublepost prevention - post automatically merged: ==



No one is auggesting large UK network wide capital spend.

But you can assume that traction batteries will be fitted to most if not all new EMUs ordered from now on. It is so chepa compared to the cost of the train, and offera many benefits, not least in disruption.
North Downs should be either third rail or overhead wires with dual electrification between Wokingham and Reading.

Uckfield and Marshlink line should be third rail as it would remove the need to have diesels in the Southern fleet.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,686
Location
Northampton
North Downs should be either third rail or overhead wires with dual electrification between Wokingham and Reading.
Dual systems over a sustained distance is a really bad idea. Conversion of Wokingham to Reading to OLE isn't very sensible as it'll trigger a need for a dual-voltage fleet on the Windsor lines, so you'd have third rail from Reading to Wokingham, then OLE from Wokingham to Ash, then third rail to Shalford Jn, then OLE to Reigate, then 3rd rail to Redhill/Gatwick. This doesn't seem very efficient to install such short elements of OLE. Whereas the frequent sections of 3rd rail would suit topping up batteries very nicely.
Uckfield and Marshlink line should be third rail as it would remove the need to have diesels in the Southern fleet.
But it's not the only way to achieve that goal.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
36,015
North Downs should be either third rail or overhead wires with dual electrification between Wokingham and Reading.

But why, when either of those electirifcations would cost substantially more in capital cost and ongoing operation, maintenance and renewals costs, than the incremental cost of some batteries on a handful of trains?


Uckfield and Marshlink line should be third rail as it would remove the need to have diesels in the Southern fleet.

Same question - and battery trains would remove the need for diesels in the ‘Southern’ fleet.
 

JamesRowden

Established Member
Joined
31 Aug 2011
Messages
1,766
Location
Ilfracombe
Given that the 3rd tph Guildford-Redhill had a poor business case anyway even though it required only 1 extra unit compared with just Reading-Guildford, extending it to Tonbridge wouldn't have been worth pursuing.
But I've shown that for the same number of units as the Reading-Guildford 3tph option, clever timetabling should allow an additional service per hour between Guildford and Redhill, and a through service to Tonbridge. The only additional costs are the crew, additional unit mileage/energy, and the difference between the costs of running 2 battery trains compared to 2 EMUs.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,427
But I've shown that for the same number of units as the Reading-Guildford 3tph option, clever timetabling should allow an additional service per hour between Guildford and Redhill, and a through service to Tonbridge.
I don't think you have. Remember that the line has some very long headways which somewhat prevent 'clever timetabling'.

The 3tph service proposed in 2020 had some terrible compromises, including the nonsense of the stopper being overtaken at Guildford, an uneven timetable pattern for the stations between Reading and Guildford, and tight turnarounds at Reading. It also didn't actually improve services in the Blackwater Valley.

I know people don't like the idea of the Reading to Gatwick train having been slowed down but it really is a much more efficient service.

Reading to Gatwick currently needs 7 units on a 3.5 hour cycle. Historically Reading to Gatwick did fit in a 3 hour cycle, but that broke down in the peaks with the need to provide additional stopping capacity
 

WAO

Established Member
Joined
10 Mar 2019
Messages
1,245
No one is suggesting large UK network wide capital spend.

But you can assume that traction batteries will be fitted to most if not all new EMUs ordered from now on. It is so cheaper compared to the cost of the train, and offers many benefits, not least in disruption.

I, for one, would actually like a network spend on BEMU's to get rid of some of the DMU fleet and give customers an experience equivalent (almost) to EMU travel. I'm on your side.

I just want secure, successful development, like the PEP and HST programs, so that we don't end up with battery electric Tadpoles, grabbing defeat out of the jaws of victory.

I live near the ND route so know the strangling effect poor transport has on East Berks and North Surrey.

WAO
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
22,000
Location
Airedale
But I've shown that for the same number of units as the Reading-Guildford 3tph option, clever timetabling should allow an additional service per hour between Guildford and Redhill, and a through service to Tonbridge.
That 's heroically optimistic: even if you run the Gatwicks fast with 6 units and tight turnarounds both ends, 4 units won't do Reading-Tonbridge hourly (GW say 10 units for Redhill only, so 11 minimum for Tonbridge even with no peak extras.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
The class 756 are planned to run from Heath to Bridgend and back on battery. That's a similar distance to the Uckfield line.
They aren’t planned to do that are they, otherwise why the diesels? Seem to remember some official saying they were hoping they might be able to.
you are aware that power supplies can be upgraded if/where necessary right?
Sure, though it’s expensive and are there practical limits on 3rd rail (after all they haven’t been upgraded such that trains aren’t power restricted)?
The ND line is probably always going to be a railway basket case; non-London, serving wayside stations with a few medium sized towns, without the speed, heavy patronage, high fares or long distance that justify railways economically.
They are very busy in the peaks - hordes of people get off them at Guildford. It serves busy prosperous towns (and Reading should be a city by now) which are linked by poor and very congested roads.

Reaching for the crayons I think it really needs a new chord so that a Farnham/Aldershot to Reading stopper can run.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,427
Reaching for the crayons I think it really needs a new chord so that a Farnham/Aldershot to Reading stopper can run.
Sounds like a lot of effort to avoid some people having to change at Ash, or walk from North Camp to Ash Vale.

Did the Wokingham area resignalling leave the headway margins unchanged on the line, in particular the issue that a northbound following train can't leave Blackwater until the train in front has reached Wokingham?
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,686
A third Reading-Guildford sounds like a good idea.

And I'm excited for a battery order... given the stock in question (turbos) - it might well come as part of a larger order. The Southern / SE region needs stock and hopefully things like this can piggyback the units needed.

Slightl adjacent - but I wonder if this would also be a viable for Reading-Basingstoke (might need 3rd rail at Reading 'Newbury' bays, or can it take from AC too?)
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Sounds like a lot of effort to avoid some people having to change at Ash, or walk from North Camp to Ash Vale.
Neither of those options are attractive enough to get people out of their cars as they would add much time and weather to the journey.
 