I was thinking about the time when HS2 gets all the way to Manchester; Edinburgh and Glasgow are less than four hours from London via Carlisle; and at least Derby and Sheffield are served by HS2 services, if not Leeds.
I'd expect to see demand for 4tph to Birmingham and 4tph to Manchester; 1tph to Glasgow; 2tph to Edinburgh; 2tph to Liverpool; 1tph to an electrified Chester; 2tph to Derby and Sheffield; 1tph to Warrington and Preston. That's HS2 full, even without the eastern arm of the Y.
EDIT
Looking to the future, I'd propose that the standard speeds on GB mainlines should be:
- 110 mph, as this seems to be the fastest that trains can go without aerodynamic effects precluding end connections, as exemplified by 350s on the WCML.
- 155 mph (250kph). With ETCS giving in-cab signalling, there is no obvious reason to keep 125mph as a standard. It's not sufficiently different from 110mph to justify the complications of mixing linespeeds on a major railway. Many new trains in Europe are being designed for 250 kph running. I believe there are some technical standards in Europe which require additional costs for trains faster than 250 kph, but I don't know what these are.
- 225 mph (360 kph), which is the standard adopted by HS2. Their aspiration of 400 kph running seems to be impractical at the current state of technology, but I agree with their decision to build the line with a minimum curvature of 8250m which is compatible with 400 kph speeds. I don't know if the HS2 standard of 125 mph (200kph) speed limits for turnouts is a fundament constraint or not.
Looking at specific lines, I'd propose:
- Extensions to HS2 should be at the current standard (360 kph with scope for 400 kph). I'd choose a route to Manchester that allowed 400kph running right up to the edge of the conurbation, rather than the ridiculour S-bend at 125 mph around Tatton Park that is in the current plans.
- 155mph would be a good aspiration for the relatively straight East Coast and the Great Western routes, rather than 140mph.
- Any new line from Liverpool to Leeds should be at 110 mph. Distances between stations are not far enough to justify a high speed line, and it will be an intensively used commuter railway, rather than a long-distance route. Beyond Leeds, 155mph would be a good choice to join the ECML.
- Any new passing loops on the WCML north of Preston should be straight enough for 155 mph running, even though trains are likely to be limited to 110/125 mph for the lifetime of current HS2 stock.
Apart from the above, I don't see