• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

What is the point in this Caledonian sleeper move?

Status
Not open for further replies.

Zander trains

Member
Joined
19 Sep 2023
Messages
184
Location
Inverness
So today I went to see a new WTT movement of the Caledonian sleeper which goes from Inverness to aberdeen on Saturday and back to Inverness on Sunday, I expected it to maybe a be a swap of some sort but no. It was the exact same Inverness consist coming back on the Sunday.
Does anyone know why the purpose of this move is?
Links to them here: https://www.realtimetrains.co.uk/service/gb-nr:C05005/2024-11-17/detailed#allox_id=0

 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Zander trains

Member
Joined
19 Sep 2023
Messages
184
Location
Inverness
I don't know but was there lack of capacity in Inverness for servicing this weekend because of the Highland Main Line engineering work?
I’m not sure, that is possible but it’s also planned to run each weekend which is odd, although it could just be easier for servicing in Aberdeen
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,251
I’m not sure, that is possible but it’s also planned to run each weekend which is odd, although as you say it might be easier for them to service it in Aberdeen.
Could also be driver route refreshing if there are a series of diversions coming up.
 

TimboM

Established Member
Joined
12 Apr 2016
Messages
3,734
There is a (ScotRail) shore supply in Inverness, but CS aren’t able to use it - more due to politics than practicalities I believe.

Last couple of winters CS have had the Mk3 (ex-Nightstar) generator coach on hire from ERS in the yard at Inverness to provide stock heating over the weekend if temperatures dropped too low.

This year the solution is to have the option of running the stock over to Aberdeen to put it on the shore supply there.

The paths and crews are planned in each weekend, but will only be used depending on the weather / temperatures forecast in Inverness.

So that’s the point of these CS moves… thread answered!
 

Zander trains

Member
Joined
19 Sep 2023
Messages
184
Location
Inverness
There is a (ScotRail) shore supply in Inverness, but CS aren’t able to use it - more due to politics than practicalities I believe.

Last couple of winters CS have had the Mk3 (ex-Nightstar) generator coach on hire from ERS in the yard at Inverness to provide stock heating over the weekend if temperatures dropped too low.

This year the solution is to have the option of running the stock over to Aberdeen to put it on the shore supply there.

The paths and crews are planned in each weekend, but will only be used depending on the weather / temperatures forecast in Inverness.

So that’s the point of these CS moves… thread answered!
Thank you, this was really helpful and also helped me figure out when it will be running, guessing it won’t run over the summer then
 
Joined
3 Aug 2021
Messages
820
Location
Glasgow
There is a (ScotRail) shore supply in Inverness, but CS aren’t able to use it - more due to politics than practicalities I believe.

Last couple of winters CS have had the Mk3 (ex-Nightstar) generator coach on hire from ERS in the yard at Inverness to provide stock heating over the weekend if temperatures dropped too low.

This year the solution is to have the option of running the stock over to Aberdeen to put it on the shore supply there.

The paths and crews are planned in each weekend, but will only be used depending on the weather / temperatures forecast in Inverness.

So that’s the point of these CS moves… thread answered!

The CS set stables on the MotorRail sidings in In Inverness where the shore supply is not compatible with the CS stock.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,609
Location
Hampshire
There is a (ScotRail) shore supply in Inverness, but CS aren’t able to use it - more due to politics than practicalities I believe.

Last couple of winters CS have had the Mk3 (ex-Nightstar) generator coach on hire from ERS in the yard at Inverness to provide stock heating over the weekend if temperatures dropped too low.

This year the solution is to have the option of running the stock over to Aberdeen to put it on the shore supply there.

The paths and crews are planned in each weekend, but will only be used depending on the weather / temperatures forecast in Inverness.

So that’s the point of these CS moves… thread answered!
Just to add to this, Eastern Rail Services Generator Van 96371 has since moved back to Yarmouth so isn’t easily at hand as a backup.
 

TheWierdOne

Member
Joined
30 Oct 2020
Messages
386
Location
Yorkshire
There is a (ScotRail) shore supply in Inverness, but CS aren’t able to use it - more due to politics than practicalities I believe.

Last couple of winters CS have had the Mk3 (ex-Nightstar) generator coach on hire from ERS in the yard at Inverness to provide stock heating over the weekend if temperatures dropped too low.

This year the solution is to have the option of running the stock over to Aberdeen to put it on the shore supply there.

The paths and crews are planned in each weekend, but will only be used depending on the weather / temperatures forecast in Inverness.

So that’s the point of these CS moves… thread answered!
What politics are involved? They’re both run by the Scottish OLR who surely should slam heads together
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
584
Location
Hull
What politics are involved? They’re both run by the Scottish OLR who surely should slam heads together
Aberdeen Clayhills is LNER operated so presumably Cally Sleeper (Scottish Gov) are paying LNER (UK Gov) for the extra stabling/shore supply usage and additional track access charges to Network Rail (UK Gov) for the ECS moves? There's some politics for you :lol:.
 
Status
Not open for further replies.

Top