Something else I've noticed - there seem to be an awfully large number of proposed power line diversions throughout the scheme, including existing sections and Oxford-Bletchley (which is currently being rebuilt). These diversions are presumably due to proposed electrification? Which would imply full electrification across the entire line.
Alternatively, if these diversions are not due to electrification, what are they for? For example, the 4 high-voltage transmission lines heading north from East Claydon substation (3x132kV, 1x400kV) are all listed as being proposed for diversion. Yet they weren't diverted for the current rebuilding works, so the only reasonable explanation is electrical clearances if the line is electrified.
However, have diversions of every electricity grid power line along an electrification scheme been required previously, such as the MML? If not, why are they required for EWR? Are they just being overly pessimistic?
Taking the 400kV transmission line north of East Claydon, there is a pylon immediately south of EWR (which, remember, has just been rebuilt and didn't need diversion for that). Therefore, the wires will be at their highest point; there is a huge amount of vertical clearance, compared to the (newly-constructed) bridge next to it (
as shown here).
Transmission line diversions are not cheap. Is there an element of gold-plating going on here?