There was a debate in the Commons yesterday on railway performance, kicked off by a statement by SoS Louise Haigh.
It was the ideal opportunity for her to tell us how GBR will be organised and what its business model would be.
Instead she reeled off some improved performance statistics for the DOHL (pubic sector) contracts (punctuality, cancellations) and put off any detail on GBR to the future.
TOC performance data will be posted at stations (didn't this used to happen in the franchise era?).
She said the return of private TOCs to the public sector would start as soon as the Passenger Services Bill had royal assent, when a timescale would be published.
She also said DOHL/OLR would be renamed "soon" as the public sector operator.

For once there was no bashing of delinquent TOCs like Avanti.
She said Southeastern would be running 44 (?) extra services from December, and that XC had resumed its full timetable "today" (but it definitely isn't the 2019 timetable).
LNER was praised for reducing its cancellations to "zero".
Several times she said working practices must be improved and exampled better driver training as a current engagement with the unions.
No detail on what other working practices needed to be changed.
Louise did finish by saying (with some relish) she was going to abolish Network Rail.
The changes at Euston were mentioned (as in she was able to "move fast and fix things").
HS2 was hardly mentioned.

After this largely non-statement, the Commons went into its usual local lobbying by MPs for their pet services, usually involving more stops to slow down services and extend journey times.
You can follow the debate on BBC iPlayer: https://www.bbc.co.uk/iplayer/episode/m00253w7/house-of-commons-rail-performance-statement

We are obviously going to have to wait a while before any more detail on GBR and its workings are announced.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,339
Location
Yorks
Local MP's calling for improvements to their local train services ?

Heaven forfend !
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,494
Location
Preston Lancs
It will be well into next year before we hear anything meaningful from the House of Commons on railways.
 

185

On Moderation
Joined
29 Aug 2010
Messages
5,709
Have to mostly agree with the above, that all the usual faces turned up to complain about their own local train on their little rural branch line, with few addressing the network-wide performance issues, pinchpoints and strategies for Network Rail to tackle the biggest delay-minute causers.

Some nonsense from the newly appointed shadow minister about performance falling on the Transpennine north route - figures I believe fell partly due to engineering works. Many Tories & Lib Dems went further in criticising 'outdated working practices' ...Aslef et al want Sunday in the working week, thus it seems the Commons is not immune to the misinformation coming from the Daily Mail & Shapps, totally missing the point that this requires 18% more staff and the status quo is more business efficient.

Good to see one SNP member raising the non-performance issue of leasing costs, however seems that will not be challenged by this government. (well, yet.)
 

AF91

Member
Joined
21 Jun 2022
Messages
98
Location
Watford
Local MP's calling for improvements to their local train services ?

Heaven forfend !
It's rather aggravating when they don't give any consideration to how changes would affect the service as a whole or disregard the advice from planners who do have an overview of the service as a whole.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,916
Location
Mold, Clwyd
Which makes one wonder, who does she think will maintain the railway, or signal trains, among other things, in future?
I think this is a PR matter really.
Combining TOCs and NR ("re-integrating track and train") means she can have a clean sheet going forward.
What happens on the ground might well stay the same, though I think the way NR does business and is regulated may well change.
TOC, NR and DfT managers will be vying for the top jobs in GBR.
 

twpsaesneg

Member
Joined
21 Jul 2009
Messages
480
Which makes one wonder, who does she think will maintain the railway, or signal trains, among other things, in future?
I suspect it's all smoke and mirrors, I expect to see exactly the same people and organisation, but rebranded to be one arm of GBR with another layer of management added at the top. Maybe I am overly cynical.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
Which makes one wonder, who does she think will maintain the railway, or signal trains, among other things, in future?
She's made it clear before that she believes Network Rail engineers hold the industry to Ransome with their requirements and were named alongside shareholders and private companies as one the three things the railway should not answer to.

I wrote to my MP about her disgraceful divisive language and alas received no reply.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,999
Location
London
Which makes one wonder, who does she think will maintain the railway, or signal trains, among other things, in future?

It will just be one larger organisation with either a vertical approach (e.g. an “Infrastructure” division of GBR) or route-based (e.g. “GBR Eastern: Infrastructure”).

In reality, most of the maintenance will remain broadly the same.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,494
Location
Preston Lancs
It will just be one larger organisation with either a vertical approach (e.g. an “Infrastructure” division of GBR) or route-based (e.g. “GBR Eastern: Infrastructure”).

In reality, most of the maintenance will remain broadly the same.
I think that too. Surely nobody is going to want change for change sake?
 

NickBucks

Member
Joined
17 May 2013
Messages
250
The local MP raised the subject of the fiasco in Oxford Botley Road and all the SoS did was to repeat Network Rails Statement about how complicated it was and how NR were working as fast as possible which somewhat contradicts her views on Network Rail and it's imminent demise.
 

DJ_K666

Member
Joined
5 May 2009
Messages
918
Location
Way too far north of 75A
The local MP raised the subject of the fiasco in Oxford Botley Road and all the SoS did was to repeat Network Rails Statement about how complicated it was and how NR were working as fast as possible which somewhat contradicts her views on Network Rail and it's imminent demise.
Go Slow And Break Things was what she said ought to be NR's motto.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,999
Location
London
Plenty of debate about Public v Private, as you would expect, but it compares apples & oranges.

And of course a good deal of the "railway" is already 'nationalised' although I'm sure several MPs would like to make a political point even if it's not based in reality.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,327
And of course a good deal of the "railway" is already 'nationalised' although I'm sure several MPs would like to make a political point even if it's not based in reality.
MPs will be able to claim that issues are a legacy of the period of privatisation and that it take time to put things right for a good long while after nationalisation.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,999
Location
London
MPs will be able to claim that issues are a legacy of the period of privatisation and that it take time to put things right for a good long while after nationalisation.

Of course. But I think maybe 90% of the things passengers care about won't change that much, even with full blown nationalisation. It will take longer than a term of government, for sure.

Using Network Rail - as an example - this has been nationalised (and infrastructure pretty much always has been with the exception of the short Railtrack period) for over 20 years.
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,619
Location
South Staffordshire
Many Tories & Lib Dems went further in criticising 'outdated working practices' ...Aslef et al want Sunday in the working week, thus it seems the Commons is not immune to the misinformation coming from the Daily Mail & Shapps, totally missing the point that this requires 18% more staff and the status quo is more business efficient.
Which suggests the Shapps (Williams) report never really achieved anything meaningful !!! Funny that
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,916
Location
Mold, Clwyd
Of course. But I think maybe 90% of the things passengers care about won't change that much, even with full blown nationalisation. It will take longer than a term of government, for sure.
Using Network Rail - as an example - this has been nationalised (and infrastructure pretty much always has been with the exception of the short Railtrack period) for over 20 years.
But they were able to borrow money on the open market until DfT cut up their credit card up in 2014.
Quite a lot of projects were delivered under the "regulated asset base" regime (WCRM, Evergreen, Thameslink 2000 etc).
.
 

Adrian1980uk

Member
Joined
24 May 2016
Messages
839
Under the current constraints, financial and political, I actually the railways do a reasonable job, the challenge is when things go wrong they're not good at handling it and things go very wrong
 
Last edited:

jayah

On Moderation
Joined
18 Apr 2011
Messages
2,056
Which suggests the Shapps (Williams) report never really achieved anything meaningful !!! Funny that
It joins McNulty in the dusty filing cabinet.

Shadow GBR has shades of the Shadow SRA. The SRA didn't achieve much, let alone the shadow version of it.

The bar is so low you'd only trip over it on purpose.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,916
Location
Mold, Clwyd
The SRA did get control of the WCRM project, and did some constructive remapping of the then franchise boundaries.
It was abolished by Labour, or rather taken in-house by the DfT, because it was part of the arms-length regime which forced money out of the Treasury to fund Network Rail.
GBR, shadow or otherwise, will have the same problem with government.
 