Hello all, I've been trying to investigate the history of electrification systems on GEML, LT&S and the Lea Valley routes. I have found pretty thorough sources for how these systems started out in 1960/1961 (and for the earlier DC system) and this includes feeder stations, TSCs and neutral sections. But the upgrading of these routes to 25kv (especially on LTS and Lea Valley lines) has been less well reported on so I'm asking for any relevant information and sources this forum might know about how those upgrades took place. Just so we're all on the same page I've included a diagrammatic and a geographic illustration for how the network stood at 1975 which is just before the first 25kv conversions took place.

The story for the GEML is clear enough but there are still many uncertainties:
  • Gidea Park to Shenfield was converted in Jan 1976 (Brook Street OHNS noted as removed in 1977)
  • Shenfield to Southend Victoria AND Liverpool Street to Gidea Park was converted in Oct 1980
    • Is this when Bow Junction Feeder Station was built replacing Bethnal Green FS?
    • How did this affect the line to Hackney Downs and Bow Curve? Is this when Hackney Downs MPTSC was installed so that the rest of the Southbury/Enfield and Chingford lines remained 6.25kv?
    • I've seen some mentions that Fenchurch Street to Bow Junction (and presumably to West Ham neutral section) went to 25kv at this time. Is this true?
  • Garry Keenor's book says "Hackney [Downs?] to Chingford" was upgraded in Jan 1984. Though I've also seen November 1983 as the date with the first class 315 going there in January 1984.
    • Was this actually from the Clapton area because the track connections between Chingford and Southbury routes are beyond Hackney Downs neutral section?
    • Perhaps this was when the big and quite complicated MPTSC at Clapton was put in place, meaning the Chingford branch becomes fed by Northumberland Park FS on the Tottenham Hale mainline.
  • Keenor's book also says "Bury Street [junction?] to Enfield Town" was converted at some point in 1984.
    • Not only is this quite vague but it's unclear how could have been fed unless the 25kv was extended southwards from Cheshunt neutral section with maybe Churchbury NS removed.
    • So what about the line south to Hackney through Stoke Newington
  • LTS is more unclear
    • The link to the GEML at Woodgrange Park was explicitly stated as upgraded to 25kv in 1988 because of a desire for electric freight traffic to Ripple Lane.
    • Did this include the line to Fenchurch Street too? Or was Fenchurch Street already 25kv since 1980? What about Gas Factory feeder station, when did West Ham feeder station come about?
    • What about Leigh to Shoeburyness?
    • I have heard that class 317s started to be used on some LTS routes from about this time but I've not seen a picture of one all the way in Southend in the late 80s or 90s.
    • Also any information on Pitsea Electrical Control Room would be appreciated. Its borders and when it ceased operation.
TLDR: what specific LTS and Lea Valley routes were upgraded to 25kv and at what points in time? And how did/does the feeding arrangement work?

Information on the present day system and the changes made when electrification was extended to Cambridge/Norwich is welcome too.

Sources I have so far consulted (though I may be missing something):
  • Garry Keenor, Overhead Line Electrification for Railways, 6th edition, 2021
  • J.C. Gillham, The Age of the Electric Train, 1987. (This is the main source for Keenor's dates for this topic)
  • John Glover, Eastern Electric, 2003.
  • Ian Cowley, Anglia East, 1988.
View attachment GE-LTS-Lvalley lines 1975 geographic_1975 geographic.jpgView attachment GE-LTS-Lvalley feeding 1975_1975 diagram.jpg
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,435
Location
The Fens
Liverpool Street to Gidea Park was converted in Oct 1980
Gidea Park-Liverpool Street was done in 3 separate stages.

01-02/03/80 Gidea Park-Forest Gate
13-14/09/80 Forest Gate-Bow Junction
11-12/10/80 Bow Junction/Hackney Downs-Liverpool Street

== Doublepost prevention - post automatically merged: ==

There was a 3 week closure of Hackney Downs-Tottenham/Walthamstow 30/07/83-21/08/83, which included lowering the trackbed in the tunnels. This seems the obvious time to do the 6.25kV to 25kV conversion for that section, and it may have been the last section to do on the "Jazz" side of Liverpool Street.

But I can't find anything yet on Hackney Downs-Enfield Town/Cheshunt or Walthamstow-Chingford.
 
Last edited:
Joined
5 Aug 2015
Messages
913
Location
Norfolk
Gidea Park-Liverpool Street was done in 3 separate stages.

01-02/03/80 Gidea Park-Forest Gate
13-14/09/80 Forest Gate-Bow Junction
11-12/10/80 Bow Junction/Hackney Downs-Liverpool Street

== Doublepost prevention - post automatically merged: ==

There was a 3 week closure of Hackney Downs-Tottenham/Walthamstow 30/07/83-21/08/83, which included lowering the trackbed in the tunnels. This seems the obvious time to do the 6.25kV to 25kV conversion for that section, and it may have been the last section to do on the "Jazz" side of Liverpool Street.

But I can't find anything yet on Hackney Downs-Enfield Town/Cheshunt or Walthamstow-Chingford.
Thanks for the insight!
It seems logical that the whole of the branch would be converted at once and Wikipedia gives the whole Chingford branch upgrading on 20 Nov 1983 (with no source) which is congruent with your blockade dates.
The other question mark would be the other side of Chingford branch since I don't think it could go all the way to Hackney Downs if the Enfield/Southbury lines were still 6.25kV at that time, as far as Clapton OHNS would make some sense. This would also mean feeds from the WAML route would have been used to power the Chingford branch (I can't imagine Wood Street FS could have been retained) which I believe is the situation at the moment where the WAML, Chingford Branch and Temple Mills line are all connected together at the rather complex 3-way MPTSC at Coppermill (making them all fed by Northumberland Park FS)
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,435
Location
The Fens
It seems logical that the whole of the branch would be converted at once and Wikipedia gives the whole Chingford branch upgrading on 20 Nov 1983 (with no source) which is congruent with your blockade dates.
Walthamstow-Chingford can't have been converted at the same time because there was a Walthamstow-Chingford shuttle during the Clapton blockade, but I don't know if it was 6.25kV or 25kV.

During the Clapton blockade electric trains were still running via Seven Sisters too. The power needed to be off almost immediately north of Hackney Downs going towards Clapton because of the work in the tunnels.
 
Joined
5 Aug 2015
Messages
913
Location
Norfolk
I assume this was Queens rd tunnel and Clacton tunnel. If the seven sisters line was open as usual, this would mean the OLE was isolated from Hackney Downs MPTSC to Clapton MPTSC but only on the Up+Dn Fasts (so platforms 1 & 2 would be out of use at Hackney). This would mean trains could run from Chingford to actually as far as St James St (Walthamstow Central is ofc a more sensible terminus to use operationally). I assume this would be still at 6.25kv because Wood Street FS would still have been available. In order for Hackney to Clapton to be energised at 25kv they must have also found the opportunity to re-spec Clapton OHNS with 25kv insulation. Alternatively, they could have actually dewired a section south of Walthamstow so that they could work on the neutral section.

== Doublepost prevention - post automatically merged: ==

I was also having a related conversation a few weeks ago with @bramling who might know some more on this topic. That was about Hythe, Colchester and Springfield substations. On that subject, I've found out that Hythe FS was substantially upgraded in 2011 (railcodes.org gives 17/10/2011 for the installation of an OHNS there). Miraculously it's visible on street view so I've attached screenshots from 2009 and 2018. To me, it looks a lot like the other substations on the 1980s extension to Norwich. Maybe you might be able to date the original Hythe feeder station more accurately than me. You were saying Springfield is probably early 1990s and indeed the OHNS is said to have been installed in November 1993 (from railcodes.org). Perhaps Springfield and Hythe came online together in the 1990s in order to replace Colchester FS?
 

Attachments

  • hythe FS 2009 streetview.PNG
    hythe FS 2009 streetview.PNG
    1.1 MB · Views: 10
  • hythe FS 2018.PNG
    hythe FS 2018.PNG
    1.9 MB · Views: 10
Last edited:
Status
Not open for further replies.

Top