Seaton Delaval station last month - but beware this is a 2.5mile walk from Seaton Delaval Hall !
Safety standards inflation gone berserk.Quick question: Why does a basic single platform need 4 separate emergency exits?
One under each if the completely redundant platform number signs, and one for the contractors to escape through with all their profitsQuick question: Why does a basic single platform need 4 separate emergency exits?
Not really, if all the normal exits are also emergency exits.Safety standards inflation gone berserk.
You can get the X7 bus from the station direct to the hall through New Hartley, takes about 10 mins.Seaton Delaval station last month - but beware this is a 2.5mile walk from Seaton Delaval Hall !
But why would a short single platform need four separate exits in the first place? For some reason they seem to have designed a separate platform behind the real platform with four sort of bridges across? And 3 sets of maintenance steps to access inaccessible areas. To me that’s over complicating things, it could be much simpler.Not really, if all the normal exits are also emergency exits.

Ive noticed on Apple maps, they label a line by it’s toc if it is the only one running services on that line, and ‘national rail’ if the line is used by multiple companiesI wonder why they’ve labelled it “Northern” rather than the usual “National Rail”?
CheersSeaton Delaval station last month - but beware this is a 2.5mile walk from Seaton Delaval Hall !
ThanksNewsham on 9th September
View attachment 166955
On the same date Bebside looked a lot further from completion so didn't try going any closer.
View attachment 166956
I guess that’s at least a logical way of doing it, thanks for checking it out.Ive noticed on Apple maps, they label a line by it’s toc if it is the only one running services on that line, and ‘national rail’ if the line is used by multiple companies
I've noticed google haven't updated their maps eiher, the ghost of the bridge over Newsham is there, but the road still shows as open though the level crossing along with the bus stops being in their old positionsI know this maybe a bit irrelevant but noticed Apple maps has got the line in place (hasn't got the stations marked in yet).
I've noticed google haven't updated their maps eiher, the ghost of the bridge over Newsham is there, but the road still shows as open though the level crossing along with the bus stops being in their old positions
That'll be due to the fact Northern are the only operators for the Northumberland LineI wonder why they’ve labelled it “Northern” rather than the usual “National Rail”?
The oddity appears to be (from the photo) that the steps down from the left go further down than platform level.But why would a short single platform need four separate exits in the first place? For some reason they seem to have designed a separate platform behind the real platform with four sort of bridges across? And 3 sets of maintenance steps to access inaccessible areas. To me that’s over complicating things, it could be much simpler.
The steps down from the left (AIUI) are for maintenance access to the non-tarmacked bits between each ramp.The oddity appears to be (from the photo) that the steps down from the left go further down than platform level.
It’s called a press launch. Not really unusual and hardly secretive.Is there an opening date yet? Also, they rather secretively opened Ashley Down a day earlier than publicly announced to "public officials" and presumably pre vetted press, so might be worth considering that could happen too.
Interesting. What’s the purpose of the large sidings in bedlington?User "West Blyth Shed" has posted on youtube a cab view of the line from Benton Junction and into the new bay at Ashington showing all the signalling and infrastructure improvements. I would say it was taken late summer this year as the Newsham level crossing is gone but the platforms at Bedlington hadn't been started yet. You can see progress at all the Stations and how much the line has changed if you are familiar with the old Blyth and Tyne.
I think the post you're quoting was referring to the trains other than the one featured on the press launch.It’s called a press launch. Not really unusual and hardly secretive.
That's not how I read it, and being very local, I don't think there was any ambiguity in what day trains started. But hey, it's wildly off topic, so probably leave it there.I think the post you're quoting was referring to the trains other than the one featured on the press launch.
They were reinstated so that the Alumina trains from North Blyth to Fort William could be reversed (with a loco run round), off the mainline. The services head north via the Bedlington to Morpeth single line.Interesting. What’s the purpose of the large sidings in bedlington?
Man I’ve been looking for an easy route to Ben Nevis… shame they don’t take passengers, and I don’t have a death wishThey were reinstated so that the Alumina trains from North Blyth to Fort William could be reversed (with a loco run round), off the mainline. The services head north via the Bedlington to Morpeth single line.
I don't think anyone would think a press launch is either secretive or unusual though would they? However, running trains either side of it unadvertised certainly is to both.That's not how I read it, and being very local, I don't think there was any ambiguity in what day trains started. But hey, it's wildly off topic, so probably leave it there.
Reasons for the proposed phased opening
It is not possible to complete all construction activities until Spring 2025. However, central Government
requires that passenger rail services commence at the earliest opportunity. Whilst most of the eastern car
park will be complete in time for passenger services, the western car park will not be available, and neither
will some of the permanent drainage. Therefore, this application seeks to consent what will be provided upon
commencement of passenger services and how the site will be managed thereafter prior to concluding
construction activities.
Details of proposed opening
It is proposed that on the day of opening, the full extent of the eastern car park will be operational, with the
exception of a row of 8 bays on the eastern flank of the car park. Temporary footpaths, pedestrian crossing
arrangements and traffic management measures are proposed and indicated on the submitted plans
Great video to see the transformation. Have to say the transit time across Benton Jcn looks time consuming and see its going to be a source of delays for Dn traffic.User "West Blyth Shed" has posted on youtube a cab view of the line from Benton Junction and into the new bay at Ashington showing all the signalling and infrastructure improvements. I would say it was taken late summer this year as the Newsham level crossing is gone but the platforms at Bedlington hadn't been started yet. You can see progress at all the Stations and how much the line has changed if you are familiar with the old Blyth and Tyne.
I was watching Plessy Road, Bebside and Bedlington Level Crossings (all after one another), both massive choke points at peak times for road traffic, even with nothing on the line, have a feeling a few road users are going to be miffed for a couple months after it opens/they get used to it lolGreat video to see the transformation. Have to say the transit time across Benton Jcn looks time consuming and see its going to be a source of delays for Dn traffic.