LNWR class 350 failures increasing?

Status
Not open for further replies.

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,887
Location
Fenny Stratford
I have been a daily class 350 user for nearly 15 years. Until this month I experienced a grand total of 1 in service failure in that time. They have been rock solid reliable units. During September I experienced 3 failures in service.

Have I just been unlucky or has something changed reliability wise? All three trains included a 350/2 but I don't think in any of the cases the 350/2 was leading the combo. I don't keep records but try never to sit in a 350/2 if I can avoid it !
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
A few weeks back a driver told me in the lift at Bletchley (suspect he just wanted someone to rant to - anyone!) that a third of the fleet was on low-power mode, which might at least explain a lot of the sloppy few-minutes delays that seem to be very common at the moment. He seemed quite proud of having arrived on time, though, despite having such a unit. I wonder if the /2s are getting bare minimum work as they're soon off lease with no planned future?
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,887
Location
Fenny Stratford
A few weeks back a driver told me in the lift at Bletchley (suspect he just wanted someone to rant to - anyone!) that a third of the fleet was on low-power mode, which might at least explain a lot of the sloppy few-minutes delays that seems to be very common at the moment. He seemed quite proud of having arrived on time, though, despite having such a unit. I wonder if the /2s are getting bare minimum work as they're soon off lease with no planned future?
Interesting - also they can be quite ranty down at Bletcho ;)

( also thanks to the mods for moving this from the main thread. Brainless posting!)
 

alex17595

Member
Joined
15 Mar 2013
Messages
1,159
Location
Burton on Trent
It certainly seems that they are doing the bare minimum to the 350/2 to keep them running.

I recall seeing a notice somewhere that drivers should not exceed 50%(I think) power until over a certain speed and it was breaking something.
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,850
Location
Northampton
In answer to a query about the 350/2s going off lease raised on the 730 thread I made a post which might be more apposite on this one. It was that, last Saturday, both the 15.36 and 16.06 departures from New Street to respectively Euston and Northampton (cancelled beyond) were 4 cars. As LNw had kindly arranged ticket acceptance on the former for Avanti passengers intending to catch their cancelled 15.21 the short formations were particularly unfortunate.
But I have never heard the announcement 'due to a larger than normal number of trains requiring maintenance', or indeed any, explanation for the short formations.
Perhaps taking on maintenance of the 360s at King's Heath has overwhelmed them.

Presumably, if LNw do have a train that shows as running on TOPS there's no penalty, even though they may be impossible to physically board.
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,610
Location
Crewe
Yes, a large number of units are running in lower power modes currently due to poor maintenance (unknown if this is due to cost or planned phase out or simply waiting for next exams).

Bare minimum maintenance has been happening for at least 12-18 months now, though the toilet issues seem to be slightly better it seams like it's come at the expense of other areas.

Also there is again notices regarding driving styles, in particular pulling away using notch 2 and no higher as this is causing failures despite it being the style of driving for many years to use notch 3 above 10mph
 

Tram203

Member
Joined
15 Jun 2024
Messages
150
Location
Always Changing
Could just be idle platform gossip, but I have heard 350236 has been stood down from service.

Can anyone confirm or deny this?
 

778

Member
Joined
4 May 2020
Messages
699
Location
Hemel Hempstead
if the state of the interiors of the 350/2 is a marker the run down has started!
If that is the case then that is not really acceptable for LNWR (or any TOC) to do that. The highest possible standards should be maintained until the day they go off lease.

Bare minimum maintenance has been happening for at least 12-18 months now, though the toilet issues seem to be slightly better it seams like it's come at the expense of other areas.
If a class is getting unreliable because it is very old like the 455s and 465s that is understandable, but doing the bare minimum to keep a train running shows a lack of respect for passengers.
 

BucksBones

Member
Joined
18 Jul 2017
Messages
340
The 350/2s are indeed horrible and stink to high heaven.

But I've noticed this past summer that the air con has been broken in at least some of the carriages of just about every unit I've been on (whether /1, /2, /3 or /4) - having to wander through the train to find a cool area. Perhaps another symptom of a poorly maintained fleet.
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,610
Location
Crewe
The 350/2s are indeed horrible and stink to high heaven.

But I've noticed this past summer that the air con has been broken in at least some of the carriages of just about every unit I've been on (whether /1, /2, /3 or /4) - having to wander through the train to find a cool area. Perhaps another symptom of a poorly maintained fleet.
Indeed, there's only so much effluent the carpets can soak up before it's permanently damaged!

Regarding temperature, most of that could be achieved by having it as part of prep in depots as it seems more like a temperature setting issue as the HVAC systems all seem to work (1 has a very noisy fan though).

Speaking to the customer experience team, they have stated it's something they are looking to get on top of, along with the no longer working PIS systems. Something like 30% of toilets are currently unusable due to parts/repairs needed, to put it into context.

I can't think of any other genuine reason other than shortfall in budgets for such a sorry state of affairs.
 