• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Does anyone know where things are at with electrification and increased service recommendations for the North Downs line?

Status
Not open for further replies.

CAB

New Member
Joined
6 Oct 2024
Messages
3
Location
Guildford
Does anyone know where things are at with electrification and increased service recommendations for the North Downs line? There is much online, documenting strategies for increasing services on this line as well as infill electrification but has this/is this actually going to happen? I'm confused also that the plan seems to be to increase services from 2tph to 3tph (which has supposedly already happened) in the medium term and then 4tph in the longer term but it looks like there are still 2tph currently. Any enlightenment from those in the know much appreciated.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,334
I'm confused also that the plan seems to be to increase services from 2tph to 3tph (which has supposedly already happened) in the medium term and then 4tph in the longer term but it looks like there are still 2tph currently.
3tph was ditched. The recently introduced timetable delivers 2tph to Gatwick, which was one of the primary objective of the 3tph plans, in a considerably more efficient manner.

Does anyone know where things are at with electrification and increased service recommendations for the North Downs line?
There doesn't appear to be any plan for electrification, and the recently introduced timetable is the increased service.

The next step would appear to revolve around whoever takes forward replacement of Turbos in the 2030s.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,274
No sign of infill electrification whatsoever. Also, as it’s bang in the middle of a third rail area, short lengths of overheads are highly unlikely, they might use some sort of battery/DC EMU in the future.

But I suspect if taken across the country this is a very low priority.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,779
Location
West of Andover
In a crayonist world the gaps would be an easy infill with new 3rd rail (afterall it's not like the network rail workers wouldn't have interfaced with 3rd rail track before). But sadly the ORR seems against infilling of diesel islands preferring to waste money on battery trains.

The only improvement for the line might come when GWR orders new stock to replace the aging Turbos.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,334
In a crayonist world the gaps would be an easy infill with new 3rd rail (afterall it's not like the network rail workers wouldn't have interfaced with 3rd rail track before). But sadly the ORR seems against infilling of diesel islands preferring to waste money on battery trains.
This isn't a speculative thread. The fact is that there is nothing in the public domain to indicate that any changes to the traction arrangements are currently in the works.

The only improvement for the line might come when GWR orders new stock to replace the aging Turbos.
There has just been a significant improvement in the timetable for many of the line's users.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,983
The timetable was recently rewritten for two reasons: abandonment of the scheme to replace the existing trains with bi-mode (diesel and 3rd rail) class 769s; and as mentioned above, abandonment of the intention to run a third train per hour.

It's unlikely that the NDL will see any significant improvement for another decade or so. What might happen when the current Turbos expire is anyone's guess.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,779
Location
West of Andover
This isn't a speculative thread. The fact is that there is nothing in the public domain to indicate that any changes to the traction arrangements are currently in the works.


There has just been a significant improvement in the timetable for many of the line's users.
By extending the Redhill stopper to Gatwick and bringing back timings based on 16Xs rather than 769s? With the big improvement being the 'fast' service calling at more stations slowing the overall journey time for anybody doing Reading to Gatwick in full?

Significant improvement will be faster trains which have 2+2 seating rather than the sluggish Turbos with the suburban 3+2 seating layout.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,334
By extending the Redhill stopper to Gatwick and bringing back timings based on 16Xs rather than 769s? With the big improvement being the 'fast' service calling at more stations slowing the overall journey time for anybody doing Reading to Gatwick in full?
No longer having to wait an hour at Reading between trains to Gatwick, more stations having direct trains to Gatwick, and a more balanced timetable are improvements, even if some journey times are ten minutes longer.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,817
It will be battery trains rather than electrification. Electrification woudl not be cheap, as there’s a fair bit of track with steel sleepers between Ash and Wokingham.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,162
It will be battery trains rather than electrification. Electrification woudl not be cheap, as there’s a fair bit of track with steel sleepers between Ash and Wokingham.
So we need a unit with about 30-35 miles of battery capacity - since Wokingham to Ash station is around 13 miles (although the 3rd rail starts around a 3rd of a mile north of the station, if the unit can change over on the move) and Shalford Jcn to Reigate is around 17 miles. These sections are separated by a considerable length of 3rd rail, so 30 should surely be sufficient.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,817
So we need a unit with about 30-35 miles of battery capacity - since Wokingham to Ash station is around 13 miles (although the 3rd rail starts around a 3rd of a mile north of the station, if the unit can change over on the move) and Shalford Jcn to Reigate is around 17 miles. These sections are separated by a considerable length of 3rd rail, so 30 should surely be sufficient.

Personally I’d put more in, but yes. A battery for 30 miles range for a typical 4 car EMU on a North Downs duty cycle would be roughly that which you will find in 5 x Kia EV9s.
 

CAB

New Member
Joined
6 Oct 2024
Messages
3
Location
Guildford
These responses are all super helpful. FYI I have also heard back from Network Rail who echo the information you have all provided above.
Many thanks for your time.
 

CAB

New Member
Joined
6 Oct 2024
Messages
3
Location
Guildford
Oh, just one more question. Network rail have said that new level crossing upgrades will include new audible warnings and lights to alert users. Would this be at the separate pedestrian crossings too or just where the cars cross?
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,983
Oh, just one more question. Network rail have said that new level crossing upgrades will include new audible warnings and lights to alert users. Would this be at the separate pedestrian crossings too or just where the cars cross?
I'm not aware of those plans, but I suspect they refer to footpath crossings rather than roads, as I don't think any of the road crossings are substandard. Several foot crossings are being or have been replaced by bridges (e.g. Farnborough North, Gomshall station, Shere Heath), and possibly signage upgrades are the next phase for foot crossings which don't justify provision of a bridge.

The two most problematic road crossings (though more from a road traffic than a rail viewpoint) are Ash and Reigate. Ash is currently being replaced by a bridge, while Reigate is probably in the "too difficult to do anything" box for the foreseeable future.
 

Cowley

Forum Staff
Staff Member
Global Moderator
Joined
15 Apr 2016
Messages
18,919
Location
Devon
Some of the recent discussions around the 350/2s have been moved here now:
 
Status
Not open for further replies.

Top