Woodhead was seen as a particularly egregious closure because it wasn't some little backwater of a route, it was an electrified main line complete with a whole new tunnel for the electrification that in tunnel terms was still brand new. All that work upgrading the route and now they destroy it; this is silly. The Hope Valley on the other hand
was something of a backwater, and still had a service that felt like it was just going through the motions even after Woodhead had shut. It was there, but it wasn't much noticed and it wasn't "iconic" like the Woodhead route was.
(Or the Peak route, come to that; cue digression on "what if the Peak route had gone up the Hope Valley like they wanted to"...)
I can imagine, though, that calls might have arisen to reopen at least as much of the Hope Valley as would be required to provide a route to the cement works, to get the lorries off the roads, and then you might as well run a passenger service as well while you're at it. We would then end up with another of these crappy "stub" reopenings that don't go all the way through to where they used to go to, and repeated suggestions to finish the job and do it properly while Totley tunnel progressively mouldered.
In the case of Woodhead, I think there is a feeling it is faster than the Hope Valley. That may, or may not, be true.
Well, it was an
electrified main line, so of course it must have been dead whizzy... Also, it is seen as more direct; it isn't really, it's about the same. It has more curvature than the Hope Valley, but less severe gradients. All else being equal, I don't think there'd be a whole lot in it. Woodhead reopening gets denigrated on here for not being fit for some ridiculous three-figure line speed, but you don't need that to run a usefully fast service; what you do need is to be able to stick to the line speed you do have, and not keep slowing down for signal checks or speed restrictions in lieu of maintenance.
For this reason I
feel that Woodhead
ought to be faster. The Hope Valley service always seems to spend an interminable time crawling along the slow lines from one single yellow to another at 15mph to Stockport and beyond, with a depressing view out of the window of a rubbish-strewn cutting side and an appropriately-named cess, giving the impression to the impatient passenger that the train is indeed going to be late and the railway doesn't care; a Woodhead service would not encounter this congestion, so wouldn't need to have its schedule padded to allow for it.
a west facing curve could have been built at Nunnery to route the service into Sheffield Midland. All the necessary land was then in railway ownership, housing various redundant pre-grouping goods depots - now it under the Derek Dooley Way.
I rather think you still could do it; you'd not be doing it at ground level anyway, so all you have to find room for is the piers of the viaduct. I think there is a reasonable spot to pierce the side of the northern approach to Midland and come out at a suitable level.