[CH] Gotthard Base tunnel repairs finished

Status
Not open for further replies.

bahnause

Member
Joined
30 Dec 2016
Messages
1,010
Location
bülach (switzerland)
The repair works in the Gotthard Base Tunnel were completed on time. Full operation of the entire system was resumed on September 2, 2024. A temporary speed restriction of 160 km/h remains in place at both tunnel portals on the north and south access. The speed restriction will remain in force until the accident investigations have been completed, resulting in an additional journey time of approximately 40 seconds for passenger trains. Driver assistance systems such as ADL and vPRO have been calibrated to the new situation, allowing compensation for the time loss by using the maximum permitted speed in the tunnel and on the open lines north and south.

The journey time between Ticino and German-speaking Switzerland has been further reduced by 60 minutes. Passenger trains now run every half hour throughout the day, and all direct connections beyond Milan are once again offered.

SBB Press release (German)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
That's good news all round, and seemingly well handled by SBB and its contractors.
Now we just need the Fréjus route closure to make the same kind of progress.]
This is obviously not SBB's direct problem, but it must still be causing a lot of disruption across the region, especially for freight.
 