Sure, I think people would be far more onboard with the project if there could at least have been a way to run SW-NW trains via the HS2 Eastern Arm. Building a new HSR system and terminating regional trains at Birmingham, disconnected from the rest of the network was a decision I don't think I could ever agree with.
Agreed; HS2 east never made sense to me unless XC's Plymouth-Edinburgh services were able to move onto it between Leeds and Birmingham without having to reverse anywhere between Plymouth and Edinburgh.
I actually dont have a problem with it as long as there is a 30 year plan and that random field in South Staffordshire is just a temporary terminating point. In our democratic system, sadly any incoming government can cancel any forward thinking plan.
We absolutely do need a longer term plan. The key thing in my view is to ensure that every section that does get built is designed to allow future extension onto the next bit. Old Oak Common on HS2 is like this - while not getting to Euston is crazy at least the design of Old Oak Common station accomodates a future extension into central London. While an incoming government could cancel it, the one after could bring it back again. What I really don't like about HS2 is the short-termist way that Curzon Street has been designed - it completely fails to recognise that (in 10, 20, 30, 40 or even 50 years time) we might want to knock down the buffer stops at the end of the platform and extend towards Bristol. There's nothing wrong with temporary terminating points - a next generation rail network for the whole of GB cannot be built overnight and you might as well open completed sections to start getting some use out of them rather than waiting decades, without seeing any of the benefits, just to allow a big bang grand openning of the whole system. The problem is dead-ends stubs that cannot be used as the starting point for a future extension - Euston is kinda understandable since Euston-Cross could well have been an insummountable challange (and perhaps not necessary if you take the view that London is big enough and development needs to be shifted to the regional cities (bridging the north-south divide and all that)) but everywhere else the planners need to be more forward-looking.
For this reason I think that, if we're ever going to want a new Liverpool-Manchester-Bradford-Leeds-York high speed line (NPR), then it should be built before HS2 reaches north of Crewe. This is so that the necessary through stations in Manchester, Bradford and Leeds get built; HS2 can then be extended northwards and make use of the NPR infrustructure into Liverpool, Manchester and Leeds.
I have always thought Birmingham being on a branch was dumb. The irony is the London centric services will terminate at Curzon street AGAIN !.
Going through Birmingham would have taken pressure of New Street to Wolverhampton.
Agreed. Unfortunately it doesn't appear to be practical to provide for both London-Birmingham-Manchester and Plymouth-Birmingham-Derby/Nottingham-Leeds with a through high-speed station on roughly the site of HS2's Curzon Street, but in my view they should have absolutely built in passive provision to do one or the other. Now that construction of phase 1 has started, and with Handsacre being rather further north than I assumed it was, I think the Plymouth-Birmingham-Derby/Nottingham-Leeds approach would be the better one. This makes the extension beyond Curzon Street a far lower priority than it would have been if the masterplan had been to go to Manchester via central Birmingham (not least because the Bristol-Birmingham line will need electrification first), but Curzon Street should really still be redesigned to be more like Old Oak Common (ie. allowing a future extension without forcing trains to reverse).
On names v. numbers etc ...
Does anyone know why we gave up the clear and to-the-point "CTRL" in favour of "HS1" — were we already expecting more high-speed lines at the time?
And why we went for the rather meaningless "High Speed One" (HS1) instead of following the pattern elsewhere of including "Line" (i.e HSL1 etc). (Compare French LGV1, LGV2, etc = "Ligne à grande vitesse", German SFS = "Schnellfahrstrecke", Belgian HSL = "Hogesnelheidslijn", etc.)
No idea on most of those questions but, although 'Channel Tunnel Rail Link' makes sense, I almost always read CTRL as 'Control' (ie. the keyboard keys) and get confused when I see it in a railway context. Perhaps London-Chunnel Primary Line (LCPL) would have been better, which would make HS2 phase 1 the London-Birmingham&Crewe Primary Line (LBCPL)?