• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

0929 Clapham Junction to Alton 17/09/24

Status
Not open for further replies.

74A

Member
Joined
27 Aug 2015
Messages
774
Waiting at Clapham Junction for this delayed train. Ran through non stop. I assume because it was running late ?

Unfortunately no one seems to have informed the people operating the info screens.

As a result it didn't display stand clear next train not stopping at this station.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,287
Waiting at Clapham Junction for this delayed train. Ran through non stop. I assume because it was running late ?

Unfortunately no one seems to have informed the people operating the info screens.

As a result it didn't display stand clear next train not stopping at this station.

Looks like Clapham Junction was indeed skip-stopped to try to catch up time. Looks like it left Waterloo maybe 15 minutes down, but is gradually now part clawing it back.


Presume you'll now be eligible for some 'Delay Repay'?
 

DynamicSpirit

Established Member
Joined
12 Apr 2012
Messages
9,213
Location
SE London
Looks like Clapham Junction was indeed skip-stopped to try to catch up time. Looks like it left Waterloo maybe 15 minutes down, but is gradually now part clawing it back.


Wow, looking at that, I can't help wondering whether the padding in the normal timetable is too excessive. The train made up 11 minutes between London and Woking just by skipping 2 stops (Clapham Junction and West Byfleet) and then a further 3 minutes between Woking and Alton, total 14 minutes of time made up. Seems hard to believe that 2 stops could make so much difference.
 

LAX54

Established Member
Joined
15 Jan 2008
Messages
3,906
Wow, looking at that, I can't help wondering whether the padding in the normal timetable is too excessive. The train made up 11 minutes between London and Woking just by skipping 2 stops (Clapham Junction and West Byfleet) and then a further 3 minutes between Woking and Alton, total 14 minutes of time made up. Seems hard to believe that 2 stops could make so much difference.
You would be surprised how much a couple of skipped stops can make up, no slowing down, no dwell time, no acceleration up to line speed needed, can easily make up 5+ on one stop, its also why trains dont always wait for late runners / connections, the knock on can add up to hours of delay.
 

Flange Squeal

Established Member
Joined
17 Jul 2012
Messages
1,860
Wow, looking at that, I can't help wondering whether the padding in the normal timetable is too excessive. The train made up 11 minutes between London and Woking just by skipping 2 stops (Clapham Junction and West Byfleet) and then a further 3 minutes between Woking and Alton, total 14 minutes of time made up. Seems hard to believe that 2 stops could make so much difference.
There’s a good few mins slack in the West Byfleet to Woking section alone, as the down Portsmouth services are generally booked to cross onto the slow in front of the down Alton in order to use Woking platform 5. I’ve noticed many drivers tend to take this section slower and keep the train rolling, rather than race up to the red and wait. On occasions where the Portsmouth goes into 4, or is delayed/cancelled, an on time Alton can arrive into Woking several minutes early.
 

DynamicSpirit

Established Member
Joined
12 Apr 2012
Messages
9,213
Location
SE London
You would be surprised how much a couple of skipped stops can make up, no slowing down, no dwell time, no acceleration up to line speed needed, can easily make up 5+ on one stop, its also why trains dont always wait for late runners / connections, the knock on can add up to hours of delay.

I can believe one stop could make 5 minute's difference if you're talking about - say - a Pendolino having to slow down from 125mph, and then having an extended dwell time because the end-carriage single doors don't allow quick boarding. But here we're talking about a commuter train with a pretty good acceleration, with the train designed for frequent stops on a line that doesn't have an exactly massive linespeed anyway. I'm struggling to see how 5 minutes for one stop in that context is reasonable.
 
Last edited:

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,481
Location
Gomshall, Surrey
Timetables are padded, without doubt. In today's compensation-based atmosphere, TOCs seek as much slack as they can get - very many journeys are now significantly slower than a few decades ago. Missing CJ here would I imagine recoup the dwell time (which should be a minute or so) plus the slowing from 60mph to 0mph to stop, rather than 60mph to 40mph for a non-stop, and the acceleration back to 60mph again. Estimate 100-120 seconds saving overall.
 
Status
Not open for further replies.

Top