• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Class 701 'Aventra' trains for South Western Railway: progress updates

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,235
I'm puzzled as to why, given that driver training started several weeks ago and PTI testing is ongoing, there is as much if not more negativity on this thread than when the trains were all sat in sidings with no visible progress being made.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

davews

Member
Joined
24 Apr 2021
Messages
1,018
Location
Bracknell
But with the training having started some weeks ago there is still no sign of any new diagrams. And ref my comment on the 458 thread I understand the introduction of 701s on the Reading line is now at the bottom of the list, PTIs or whatever (they did run successful test runs all along them some years ago, why have problems surfaced now?). We can understand why there is so much negativity and we seem to be talking more about trains being moved to storage rather than actual trains carrying passengers.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,235
But with the training having started some weeks ago there is still no sign of any new diagrams. And ref my comment on the 458 thread I understand the introduction of 701s on the Reading line is now at the bottom of the list, PTIs or whatever (they did run successful test runs all along them some years ago, why have problems surfaced now?). We can understand why there is so much negativity and we seem to be talking more about trains being moved to storage rather than actual trains carrying passengers.
Did you really expect additional diagrams after just 5-6 weeks training? Typically new trains start to appear in service very slowly 3-4 months after training starts. The logistics of getting enough staff trained to be able to start even a minimal service have been detailed on this thread by those in the know.

As for Reading, it's been stated all along by SWR that the order of introduction is fluid and will be dictated by where the additional capacity is needed most. If you travel on the Reading line regularly you'll know that peak hours travel is a shadow of its pre-Covid self. Local social media suggests that the post - Covid cuts have hampered recovery, making the service so unattractive that people who used to drive to Bracknell, Martins Heron or Sunningdale to go into London now go to Maidenhead or Slough instead.
 

stuu

Established Member
Joined
2 Sep 2011
Messages
3,774
In theory it is a binary decision, either bright enough or not, and either blind spots or not. It is not a many months drawn out thinking about it.
Of course it isn't, lighting changes every single day of the year. And a network where the lines head approximately east-west will be worse than north-south
 

sp503

Member
Joined
12 Jul 2023
Messages
53
Location
Reading
If you travel on the Reading line regularly you'll know that peak hours travel is a shadow of its pre-Covid self. Local social media suggests that the post - Covid cuts have hampered recovery, making the service so unattractive that people who used to drive to Bracknell, Martins Heron or Sunningdale to go into London now go to Maidenhead or Slough instead.
Thanks, not following the local media but this makes sense. There’s nothing that can be done to the Reading Line really, the line has over the years gained a lot non-London-going passengers in every segment along the line and is now impossible to speed up; while the 15-minute frequency of the Elizabeth Line plus the half hourly Didcot semi-fast makes the GWML much more attractive. Reading Line would only ‘need’ 701s when all other lines on the Windsor side are converted so as to improve timekeeping and not let the slow door operation of 450s blocking the line…
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,235
Thanks, not following the local media but this makes sense. There’s nothing that can be done to the Reading Line really, the line has over the years gained a lot non-London-going passengers in every segment along the line and is now impossible to speed up; while the 15-minute frequency of the Elizabeth Line plus the half hourly Didcot semi-fast makes the GWML much more attractive. Reading Line would only ‘need’ 701s when all other lines on the Windsor side are converted so as to improve timekeeping and not let the slow door operation of 450s blocking the line…
Personally I'm more than happy to retain the 450s. I just want rid of the pesky 455 interlopers! :lol:
 

MotCO

Established Member
Joined
25 Aug 2014
Messages
6,147
PTIs or whatever (they did run successful test runs all along them some years ago, why have problems surfaced now?).
But if it was done some time ago, I assume they need to check that nothing has changed since then - e.g. growth of foliage, new signs put up obscurring line of sight, location of stop signs, etc.
 

SWT_USER

Member
Joined
29 Aug 2010
Messages
1,183
Location
Ashford Middx
I'm puzzled as to why, given that driver training started several weeks ago and PTI testing is ongoing, there is as much if not more negativity on this thread than when the trains were all sat in sidings with no visible progress being made.
To be fair I can understand the negativity, particularly on a day like today where the 701 service was cancelled and at least one peak service on the Windsor side was a single 450. Passengers can see all the 701 units stabled at Clapham and will rightly be wondering why they can't be used in service yet.

Thanks, not following the local media but this makes sense. There’s nothing that can be done to the Reading Line really, the line has over the years gained a lot non-London-going passengers in every segment along the line and is now impossible to speed up; while the 15-minute frequency of the Elizabeth Line plus the half hourly Didcot semi-fast makes the GWML much more attractive. Reading Line would only ‘need’ 701s when all other lines on the Windsor side are converted so as to improve timekeeping and not let the slow door operation of 450s blocking the line…
I agree nothing can be done in terms of speeding it up but service frequency could definitely be improved. It's really unappealing to use now, especially in the evenings .
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,235
I agree nothing can be done in terms of speeding it up but service frequency could definitely be improved. It's really unappealing to use now, especially in the evenings .
Yep. I know a couple of people in Wokingham who would always use the train to go to evening shows in London, but since the absurd reduction to hourly Mon-Fri now drive in instead.

Anyway, we digress somewhat...
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,892
Personally I'm more than happy to retain the 450s. I just want rid of the pesky 455 interlopers! :lol:
I’d rather have some of the peak extras back, particularly the 1735/1805/1835 off Waterloo. A 2 hour door-to-door journey time for a distance of less than 35 miles is frankly unacceptable and a big reason why WFH is the norm for me. Quality of life is so much better without using SWR’s squalid service every day.
 

Siemens Staines

Established Member
Joined
30 Jul 2015
Messages
1,553
Curiously, although 2U09 is shown as cancelled, 2U19 is not shown on RTT at all.

It is a quirk of RTT that treats VSTP cancelled trains the same as STP cancelled trains that were never planned to run in the first place (e.g due to engineering work). You can see the VSTP cancelled trains (VCN) if you select the CAN button in detailed mode, and then 2U19 does show up


If I understand correctly, there is more than one way to cancel a train from "the system", and it depends upon which method is use as to whether cancelled trains show up on RTT or not.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,235
I see SWR are stating a general shortage of train crew today.


Due to a shortage of train crew fewer trains are able to run.
What's Going On:
Train services running across the whole South Western Railway network may be cancelled or revised. Disruption is expected until the end of the day.
What We're Doing About It:
There are a number of crew shortages across the network today, this means that some trains will be cancelled or altered.
The main services affected are:
Waterloo - Alton in both directions after 20:30.
Guildford - Farnham in both directions after 17:00.
Aldershot - Ascot in both directions until 19:30.
Passengers are advised to check their journeys before they travel.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,285
Location
West Wiltshire
If you travel on the Reading line regularly you'll know that peak hours travel is a shadow of its pre-Covid self. Local social media suggests that the post - Covid cuts have hampered recovery, making the service so unattractive that people who used to drive to Bracknell, Martins Heron or Sunningdale to go into London now go to Maidenhead or Slough instead.
Interesting that one line is apparently so far below pre-covid.

Today DfT updated its usage since covid, and for most recent dates (21 Aug - 1Sep) is nationally at 90-94% each day (excluding Elizabeth line) or 100-105% (including Elizabeth line)


Obvious question is, why if national average is at least 90% and on some days 94% how can SWR justify such swinging cuts compared to pre covid, or are they simply going out their way to discourage rail use.
 

PGAT

Established Member
Joined
13 Apr 2022
Messages
2,136
Location
Selhurst
Interesting that one line is apparently so far below pre-covid.

Today DfT updated its usage since covid, and for most recent dates (21 Aug - 1Sep) is nationally at 90-94% each day (excluding Elizabeth line) or 100-105% (including Elizabeth line)


Obvious question is, why if national average is at least 90% and on some days 94% how can SWR justify such swinging cuts compared to pre covid, or are they simply going out their way to discourage rail use.
Worth keeping in mind WFH has disproportionately affected the Southeast of the UK so I wouldnt be surprised if SWR had about 70%
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,235
Worth keeping in mind WFH has disproportionately affected the Southeast of the UK so I wouldnt be surprised if SWR had about 70%
Yes, and all the data by TOC is published on a regular basis.

Can we get back to 701s now? :D
 

DelW

Established Member
Joined
15 Jan 2015
Messages
6,050
I'm puzzled as to why, given that driver training started several weeks ago and PTI testing is ongoing, there is as much if not more negativity on this thread than when the trains were all sat in sidings with no visible progress being made.
I imagine that no-one believes anything that SWR say any more, they've endlessly promised things that they've failed to deliver. Even after staff have been trained I expect that they'll find some new excuses for not running more of these trains in real passenger service as opposed to the pretence of "soft launch", which is beyond a joke now.

I see SWR are stating a general shortage of train crew today.

What was once a reliable service sinks further into the mire . Is it any wonder that SWR's passenger numbers are still so poor?
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,847
Location
SW London
It is a quirk of RTT that treats VSTP cancelled trains the same as STP cancelled trains that were never planned to run in the first place (e.g due to engineering work). You can see the VSTP cancelled trains (VCN) if you select the CAN button in detailed mode, and then 2U19 does show up
Looks like 2R53 is expected to run though.
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,491
Location
Gomshall, Surrey
Something that strikes me from this and other troubled new stock introductions is what impact it might have on attitudes to ordering new stock. Perhaps it will be thought better to stick with trains that are running, even if a little outdated, for longer rather than go through what seems to be a vast amount of angst every time a new train is produced.
 

73128

Member
Joined
8 Dec 2019
Messages
471
Location
Reading
It was also reported somewhere either in that thread, or the one it links to, that the Windsor 4 tph had already been removed, in favour of retaining the through trains to Weybridge. The original proposals had Weybridge reduced to being served by a shuttle between Weybridge and Staines. I guess that didn’t go down well at all, although I think it was a shuttle prior to 2004.

== Doublepost prevention - post automatically merged: ==


Further back, trains split at Staines...
 
Joined
2 Jun 2023
Messages
1,096
Location
Richmond
Worth keeping in mind WFH has disproportionately affected the Southeast of the UK so I wouldnt be surprised if SWR had about 70%
Yes exactly. SWR specifically has quite low passenger numbers compared to before COVID, I think one of the biggest drops of any overall TOC. This is the new normal
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,491
Location
Gomshall, Surrey
I'm puzzled as to why, given that driver training started several weeks ago and PTI testing is ongoing, there is as much if not more negativity on this thread than when the trains were all sat in sidings with no visible progress being made.
Possibly because the longer the saga drags on, with seemingly new snags at every stage, the worse the overall delay gets (and the more impatient some get with the state of the rail industry that can allow this to happen).
 
Joined
2 Feb 2019
Messages
1,039
Something that strikes me from this and other troubled new stock introductions is what impact it might have on attitudes to ordering new stock. Perhaps it will be thought better to stick with trains that are running, even if a little outdated, for longer rather than go through what seems to be a vast amount of angst every time a new train is produced.
Greater Anglia replaced their entire fleet and successfully introduced all their new trains. It is only South Western Railway that has totally failed so far to introduce their new trains.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,967
Interesting that one line is apparently so far below pre-covid.

Today DfT updated its usage since covid, and for most recent dates (21 Aug - 1Sep) is nationally at 90-94% each day (excluding Elizabeth line) or 100-105% (including Elizabeth line)


Obvious question is, why if national average is at least 90% and on some days 94% how can SWR justify such swinging cuts compared to pre covid, or are they simply going out their way to discourage rail use.

The obvious answer is that an average is, err, an average, and differnet trainoperators have been affected to different extents. The ‘south of river’ commuter operators have all been particualry affected by the reduction in commuting by the more affluent commuters.


Greater Anglia replaced their entire fleet and successfully introduced all their new trains. It is only South Western Railway that has totally failed so far to introduce their new trains.

GA were also very fortunate in the timing of Covid.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,235
Possibly because the longer the saga drags on, with seemingly new snags at every stage, the worse the overall delay gets (and the more impatient some get with the state of the rail industry that can allow this to happen).
Is there actually any hard evidence that there are "new snags" that will result in further delays to the introduction programme?
 
Joined
2 Jun 2023
Messages
1,096
Location
Richmond
I'm puzzled as to why, given that driver training started several weeks ago and PTI testing is ongoing, there is as much if not more negativity on this thread than when the trains were all sat in sidings with no visible progress being made.
People are just fed up, and rightfully so. They wonder why we’re in another period of silence and because of SWR’s track record still have little faith in the introduction picking up any time soon.
 

DMckduck

Member
Joined
26 Jul 2020
Messages
488
Quite a few short formed services on the SWML suburban routes into Waterloo this morning. Lots left behind on platforms.

The extra capacity that the 701s provide can't come soon enough.

That's why people are getting frustrated at the rate of progress.
I don't see capacity being improved at all for a while on the suburban. I imagine it's low down on the priority list for the 701s for some reason.

Windsor, Shepperton and Hounslow first looks most likely.
 

Top