The objective of the timetable change was to untangle the mess that existed before as well as improving reliability. Journey times have not been significantly reduced but rather take longer because of additional changes required.They just have been!
I think the previous threads explain that Worthing loop has very restrictive signalling that makes overtaking not viable.Worthing loop and Barnham loop don't seem to be used for overtaking? But I'm sure that if they were useful for this purpose then they would have been used since the timetable recast.
I guess it would have to be a local council incentive?Realistically the Coastway infrastructure is never going to move up any lists for improvement. Simply in the wrong part of the country for investment.
Local councils don't have the necessary funding for improvements to operational rail infrastructure. They might be able to make the area around the exterior of a station nicer.I guess it would have to be a local council incentive?
The road infrastructure between Brighton and Portsmouth is rubbish tooI think the previous threads explain that Worthing loop has very restrictive signalling that makes overtaking not viable.
Realistically the Coastway infrastructure is never going to move up any lists for improvement. Simply in the wrong part of the country for investment.
Yes, and whenever any suggestion of upgrading the A27 around Arundel comes up, it is usually cancelled in the name of budget cuts.The road infrastructure between Brighton and Portsmouth is rubbish too
Yes, the latest worked up proposal for Arundel has just been completely cancelled.Yes, and whenever any suggestion of upgrading the A27 around Arundel comes up, it is usually cancelled in the name of budget cuts.
If only the people of Angmering had the lobbying power to get the 200 mph service to London via Brighton that they deserve!I would also mention in passing that if the idea of a south coast high speed line ever comes up in this discussion, treat it as the “off the scale fantasy” that it really is.
The GWR service only ran as a through service from the west of Southampton once a day eastbound, (the other morning peak arrival only came from Portsmouth or Fratton), and twice a day westbound, and I think it had negative timetabling effects on other services, so with hindsight I now suspect it was intentionally removed well in advance of the intended 2 tph Southampton Brighton trains. At few years ago a route study had the GWR early arrival being criticised as having inadequate capacity into Brighton, and I always thought it wasn’t really a problem that GWR should have to solve, it should have been made a franchise requirement for SN to put on longer trains for the morning commute. I think the recent changes did concentrate on providing that improved short distance capacity into Brighton.I would be interested to see the ratio of 'through' journeys to shorter 'metro'-style journeys, especially along the east end of the West Coastway. It could be that there really just isn't a huge demand for faster long-distance services, and that most of the customers would rather have a more homogeneous high-frequency service.
For the record, I would like a semi-fast or fast option from Brighton through to Southampton, like there was when GWR still ran this way. But I am willing to concede that this just isn't as necessary as I think, and longer journey times are a sacrifice we must make in order to serve the needs of the Littlehampton-Brighton conurbation. Back when I used to get the Southern Southampton–Brighton trains, they would always be very quiet up until Chichester or even beyond. On the flip side, the GWR 158s were usually pretty packed the whole way along. But... I would have been travelling at desirable times (half terms, etc), which has probably biased this anecdata.