And with 4 or more 3 minute closures each hour, the total delay caused to road users (and the fuel wasted) would be far, far more than any time savings / carbon savings to ‘rail’ passengers.
This is such a simple one - put on a dedicated electric bus ….
I don’t think for a moment that any business case for this rail link would stack up, but some of the arguments against it really are questionable. I have a free bit of time this evening, so here goes …
Firstly, this has been called a “High speed road” by the ORR in a letter to the DfT. The crossing point isn’t much over 200m from a roundabout, so what would be wrong with putting in a 40mph speed limit between the roundabout and a short distance beyond the crossing point?
Secondly, and following on from this, there is a well tried practice of reducing traffic speeds on busy roads as a means of keeping the flows going, by avoiding what is known as the concertina effect (ie traffic bunching and coming to a halt far more often than it otherwise needs to). So perhaps it would even be an advantage to have a lower speed limit for a short section, and it certainly shouldn’t do any harm. The cost to journey time even at quiet times would be perhaps 5 seconds at most, and at busy times (ie most of every day), nothing at all.
Thirdly, there are double standards on this route. Just a few miles along this road at Wrexham, there is a 50mph limit on a dual carriageway section of it. Not because of any urban characteristics, but as displayed on the road signing it’s “to improve air quality”. So why any great need to keep 60mph for a short stretch of this single carriageway "high speed" road?
Fourth, the short temporary road closures will do little to lengthen journey times. Traffic held for 3 minutes will then travel more quickly for a couple of miles, and by 3 or 4 miles along the road it will have caught up the queue that was in front of it before the crossing. And thanks to the road being “High volume”, then this does indeed constitute most of the traffic at this point. So yes of course there would be a few delays, but it isn’t really reasonable to make much of an alarm out of this.
Fifth, a few miles along the road in the opposite direction to Wrexham is Shrewsbury where the roundabout at the A49 junction (just north of Bayston Hill) very regularly causes long delays, both to the A49 and the A5. When this junction was being planned in the late 1980s, many people locally pleaded for this to built as grade-separated but the DfT refused. Let’s disregard the horrendous accident record of this junction after it was built, and focus on the “fuel wasted”. This A5/A49 junction has caused countless thousands of vehicles on the (very straight) A5 dual carriageway, every day for decades to either reduce speeds to 20mph or so if their traffic lights happen to be on green, or to stop completely, all from 60-70mph. This then means they all need to use extra fuel to build back up to speed again. Yes grade-separation for the junction wouldn’t be cheap, but the extra fuel consumed by so many vehicles every day doesn’t really feature in any considerations here.
So to conclude, yes it’s not a great scheme, but neither the traffic speeds, the traffic volumes, the traffic delays nor even the fuel wastage present a particularly strong case for refusing to build it. There simply isn’t a great case for it, we don’t need exaggerated claims of problems to our precious road traffic to stop it from going ahead.