Looks like good news for Fishguard. Using the 37's and 50's used to be the best way to get some extra day returns to Fishguard 
There has been a lot of preparation work carried out already. The vegetation has been cut back along the length of the old track bed, and the Cardiff crews have learned the District Line in preparation for the diverted services.
That re-doubling, as nice as it sounds could actually be completly un-necessary, and even detremental. Currently I think there are 1.5 trains per hour each way over that section. That is enough to have a service from each of the three west Wales brachces to Swansea every two hours. For Cardiff and Bridgend, it is faster via the Swansea district line, which could be in danger of cutbacks after Gowerton's re-doubled. With the current infrastucture, more 150s/153s and a larger number of 158s replacing our 175 fleet we probablly could have:
- 1tph express alternatly to Pembroke and Milford (via Swansea)
- 0.5tph stopper Swansea to Whitland, splitting to Milford and Tenby
- 0.5tph express Fishguard & Goodwick to Cardiff via Swansea district line
- More services via district line if there's enough demand
It would however be better to have Gowerton doubled, but only if it is not at the cost of the District line. You could then have the same service pattern, but with the stopper hourly from Whitland to Swansea instead of splitting.
What I always say to this is there should be no question of diverting any services away from Swansea (High Street) station, any district line services would be additional. However, there are two seperate markets for passengers heading out from west Wales, those headed for Swansea and those headed for Cardiff and beyond (well, that's a gross simplification, but I'm guessing it covers the bulk of scenarios). It may therefore be acceptable to require a change at Swansea on all services via there provided at least an hourly service (equivelent to the current quantity of change-free Carmarthen - Cardiff workings) was put on via the district line. I think it would be better to keep the via Swansea services direct though, as that means you can get away with testing the water with only 2-hourly via the district line instead of hourly and having the district line service miss out Port Talbot (although linespeed increases to save enough time to serve Port Talbot as well would be better).Of course, I don't want to the Swansea District Line be downgraded, but at the moment it seems to be used for the oil trains, the Trostre trains, steam specials and the two passenger trains each way. There is a case for some faster direct services to Cardiff, but there is still a healthy market between Swansea (plus Neath and Gowerton) and Llanelli and points further west.
, open the gates to the site and tell the drivers they are now to stop at the station.What I always say to this is there should be no question of diverting any services away from Swansea (High Street) station, any district line services would be additional. However, there are two seperate markets for passengers heading out from west Wales, those headed for Swansea and those headed for Cardiff and beyond (well, that's a gross simplification, but I'm guessing it covers the bulk of scenarios). It may therefore be acceptable to require a change at Swansea on all services via there provided at least an hourly service (equivelent to the current quantity of change-free Carmarthen - Cardiff workings) was put on via the district line. I think it would be better to keep the via Swansea services direct though, as that means you can get away with testing the water with only 2-hourly via the district line instead of hourly and having the district line service miss out Port Talbot (although linespeed increases to save enough time to serve Port Talbot as well would be better).
Does anyone here happen to drive/staff/travel very regularly on the daytime Fishguard service? Particularly if you've ever taken a 158 on it? If so, I'd like to know what you think of the gap between the train and Fishguard & Goodwick's platform, and the curve of it. I've heard claims it might not work, but I don't think the curve of the station is any more severe than Milford Haven, Neath, Paddington, Swansea or Narberth, nor do I think the curve is of equal radius to that of the track, which means the gap will be less at one end of the platform than the other. They also talk about needing to relay the platform surface. Really, if you don't like plants growing on your platform (I think it makes the place more interesting myself) get the weedkiller out. Other than that, in my opinion all you need to do is stick a fence up round the building until the money can be found to restore it (which probablly won't be for many years:cry, open the gates to the site and tell the drivers they are now to stop at the station.
I agree, I just don't think it is worth closing, or reducing the capacity of, the district line west Llandarcy.I firmly believe that a half hourly service from Swansea to Carmarthen is required. The new timetable allows for soemthing very close to that during peak hours, and is a step in the right direction. 1.5 trains per hour is not enough, in my opinion.
Is it a serious proposal to reopen the station? Seems a no brainer to me. There is little point running more trains down to the harbour, if they dont also stop closer to the town.
I agree, I just don't think it is worth closing, or reducing the capacity of, the district line west Llandarcy.
The plans are here, which say they will be "reviewing the usage of the Swansea District Line,
west of Llandarcy, which requires major structural investment over the next five years" with the possible result of "rationalisation of the Swansea District Line west of Llandarcy" - nothing concrete but the government cutbacks will surely affect Network Rail, making them have to cutback too.
"Rationalisation of the Swansea District Line west of Llandarcy" could mean anything from wider signal spacing (hence reduced capacity) or reduced maintenance (and hence linespeed) to reducing it to single track or closing it altogether. Given that there are several routes radiating from Swansea Docks which could make for a great equivelent of the ValleyLines for Swansea, and that the district line is the only way of achiving the massive time savings needed to beat the M4, any cutbacks that could not be very cheaply reversed are unacceptable.
Sounds like they're looking into it. Why WAG rushed into providing extra trains without the station for them to serve I've no idea, maybe they (like me) can see no reason why you can't just fence off the building and throw open the gates. Network Rail seems to be making up expenses (eg. 'we'll have to straighten those curved platforms') just for the fun of it (or to pocket some profits, but they are a nationalised organisation aren't they so that can't be it)).
The curved platforms bit does sound odd. Must be something about it that NR dont like. Without speaking to them though, who knows why they have mentioned the curved platforms.
Just give me a couple of decent reputable men from one of NRs contractors, and I'll have the station ready for action! Wont be costing very much money either!
Why WAG rushed into providing extra trains without the station for them to serve I've no idea
Well, there was an hourly service by 2011 included in WAG's National Transport Plan, so the infrastructure investment did have a point.This is the same WAG which pushed for extra capacity on the Aberystwyth line without the extra trains to serve them... :roll:
A consultation document is now on teh FGW coffee shop forum. I am going to fill it in a send it back to them as i am not happy with them re-timing the 15:14 swansealine and extending it to fishguard unless they can say what will replace the 17:10 swanline service (maybe even retiming the 17:55 departure to manchester to leave swansea at 17:45 to cover for it.)
No units are stabled anywhere in West Wales except Carmarthen. This emans that all the lines require workings stock positioning movements at the start and end of the day's work. I'm not sure it would be feasible to elave stock overnight where there is no staff presence. What about cleaning, watering and fuelling?
I'm not sure what exactly happens overnight at Carmarthen, except for the fact that the units are cleaned. Every early morning service has been cleared of litter, with the seat backs and tables wiped down.
A service goes back to the garage at Chester every night from Carmarthen,arrives Chester early next day, presume its one of what is now becoming a rare breed of 175s. Carmarthen is a crew dept, so they may well have cleaning facilities. While we are in West Wales, anyone seen the stock on the new dawn patrol ATW Holyhead to Milford Haven
ex HDD around 0430, arrives Milford 1230 imagine eight hours on a 150 set.
Bob
A service goes back to the garage at Chester every night from Carmarthen,arrives Chester early next day, presume its one of what is now becoming a rare breed of 175s. Carmarthen is a crew dept, so they may well have cleaning facilities. While we are in West Wales, anyone seen the stock on the new dawn patrol ATW Holyhead to Milford Haven
ex HDD around 0430, arrives Milford 1230 imagine eight hours on a 150 set.
Bob
I saw a Milford service yesterday at 1050 in Llanelli - would that be the early Holyhead train? On this occasion, it was a 175!
Where do all these 150s come from! Anyway, how do they expect to be able to make some of the new Fishguard sevices 175s to Manchester? I thought the 175 fleet was at, or beyond, full stretch. Also, can anyone shed some light on fueling and anything else that needs doing every day or two? And what about permissive working (or some other trick that's allowed) to allow a unit to be parked at FGH overnight?
Yes that's it, ex Llanelli 1055. Thanks to our man on the spot. I presume it then goes to Masnchester?
Bob
Does anyone here happen to drive/staff/travel very regularly on the daytime Fishguard service? Particularly if you've ever taken a 158 on it? If so, I'd like to know what you think of the gap between the train and Fishguard & Goodwick's platform, and the curve of it. I've heard claims it might not work, but I don't think the curve of the station is any more severe than Milford Haven, Neath, Paddington, Swansea or Narberth, nor do I think the curve is of equal radius to that of the track, which means the gap will be less at one end of the platform than the other. They also talk about needing to relay the platform surface. Really, if you don't like plants growing on your platform (I think it makes the place more interesting myself) get the weedkiller out. Other than that, in my opinion all you need to do is stick a fence up round the building until the money can be found to restore it (which probablly won't be for many years:cry, open the gates to the site and tell the drivers they are now to stop at the station.
The Fishguard Trains website from earlier in the thread is having some fun with the proposed timetable... http://fishguardtrains.info/
There isnt a problem with the curve of the problem. The problem that exists is simply that the running line isnt where it used to be. It was apparently re-aligned and pushed back towards the cliffs when the access roads to the Ferryport were improved.
Additionally, if 158s are used, they will not call at Clarby Rd (Up direction) due to guaging issues.