anthony263
Established Member
I think that's a bit lengthy, provided there are points close enough to the station you should be able to swap locos in 10mins if they have automatic coupling systems (158s can split in less than 5, but they tend to wait around a bit afterwards to let passengers on and off).
So no IEP to Pembroke Dock confirmed then, another reason to avoid them, think of all those tourists driving to Pembrokeshire or flying abroad instead.
Says here that headways are 6mins. 60 divided by 6 is 10 trains per hour. The document says:
So:
- 1tph PAD - SWA Express (INTERCITY 225)
- 1tph PAD - SWA Semi-Fast (IEP EMU)
- 1tph Manchester - SWA - Milford Haven (175 or 158)
- 1tph CDF - CMN - FGH via Swansea District Line (158 or 153 pair) (and this would not be used every other hour to start with. In the very long term I'd have a 2nd train per hour which would go on a reopened line to Aberystwyth).
- 1tph SWA - Cheltenham Spa (class 377) (all-stations)
- 1tph Maesteg - Ebbw Vale Parkway (class 377) (all-stations) (if you want 2tph to Maesteg you could join the 2nd train with the SWA - Cheltenham service or make it an extension of Vale Of Glamorgan trains.
That leaves 2 fast and 2 slow paths per hour for freight (frieght doesn't call at stations so class 90 hauled freight might be able to use a fast path).
Excellent idea's one idea i had was to run 1 of the maesteg services via the vale of glamorgan route. trains would leave maesteg @ 13 & 43 minutes past the hour with the ebbw vale train leaving @ 43 minutes past and has a journey time to cardiff of 47 minutes & ebbw vale in 1 hr 15 minutes
